1 Cari DeWolf, Consultant
2 Courtesy of PG&E
Ice makers Pre-rinse spray valves Faucets Dishwashers Steamers 3
4 Courtesy of PG&E
5 Photos courtesy of PG&E
6 Photos courtesy of Ice Makers
7 Information from Pacific Gas & Electric Company (PG&E) Food Service Technology Center (FSTC) (Zabrowski, 2007)
8 Self-contained Photos courtesy of
9 Separate Units Photo courtesy of
10 Remote Photos courtesy of
11 “A report on Potential Best Management Practices” for CUWCC, June 2008, Koeller and Company
12 Photo courtesy of PG&E
13 Photo courtesy of Charles Bohlig, East Bay Municipal Utility District, 2007 Freeze plate Trough Pump Control panel
14 Photo courtesy of
15 Photos courtesy of
16 Photos courtesy of
17 Photos courtesy of
18
19
20 Pre-rinse Spray Valves Photo courtesy of Fisher Photo courtesy of TS Brass Photo courtesy of Fisher Photo courtesy of Zurn
21 Photos courtesy of California Urban Water Conservation Council (CUWCC) and Puget Sound Energy (PSE) Programs
22 Inefficient spray nozzles SBW Consulting, Inc. Evaluation, Measurement, & Verification Report for the CUWCC Pre-Rinse Spray Head Distribution Program. May 3, 2004
23 Efficient spray nozzles SBW Consulting, Inc. Evaluation, Measurement, & Verification Report for the CUWCC Pre-Rinse Spray Head Distribution Program. May 3, year estimated life
24 Maximum flow rate 2.2 gpm at 60 psi 20% reduction = 1.8 gpm Photos courtesy of PG&E
25
26 CUWCC PBMP Commercial Dishwasher Report - June, 2010
Chemical ◦ More water than high-temp models Heat ◦ Less water than chemical models ◦ Booster heater reaches 180 o F 27
Water usage Number of racks washed Rack measurements: ◦ 20” x 20” ◦ 14 plates or 25 glasses ◦ 100 pieces of flatware Run through twice Run cycle = 1 to 3 minutes 28
29 Courtesy of PG&E
30 Photo by Classeq
31 Photo by Cupexc
32 Photo by Meiko
33 Photo by Crown Boiler vs. Boilerless Connection vs. Connectionless Photos courtesy of PG&E
California requires food heated to =/>140 o F Steamers: ◦ Connection or Connectionless ◦ Boiler or Boilerless ◦ Boilerless vs. Connectionless WE is similar = 3 gph of operation 34
35 Average 14 gpd or 13k gpy Average 17 kWh per day Photography by Cari DeWolf
* Cookers/Kettles * Woks * Combination ovens * Garbage disposers * Grinders * Sluice troughs * Strainers/Scrapper baskets (Appendices) 36