8th meeting of the Task Force on Health Expectancies Session 1 – Update from the Commission SILC/EHIS update/EDSIM.

Slides:



Advertisements
Similar presentations
8th meeting of the Task Force on Health Expectancies Session 3 – Improving current HLY estimates The health questions in SILC 2007 and 2008.
Advertisements

1 Owner-Occupied Housing Summary of the pilot Item 5 of the Agenda D4 – Price Statistics HICP Working Group Luxembourg October 2007.
ESS F5 Health & Food Safety UNECE/WHO/Eurostat - Measurement health status - Budapest 14-16/11/2005 Slide 1 of 10 Working Paper No.4 Rev.1 14 November.
19 June 2007 Task Force on Major and Chronic Diseases 5 th meeting 1 Update on the implementation of the European Health Interview Survey (EHIS) Eurostat.
Training on occupational classifications. Name of the presentation Introduction ISCO 08 has started to be implemented in the EU countries in several social.
EurostatEurostat GALI as a core variable Item 4.3 DSS Meeting September 2015.
Partnership on Health Statistics Progress Report DSS Meeting Jeannette KLIMONT 22 September 2008 © STATISTIK AUSTRIA Wir bewegen Informationen.
Recent developments on disability statistics in the European Union Lucian AGAFITEI Eurostat Unit F5 “Health and food safety; Crime” 10 th meeting of the.
ESS Slide 1 Quality assessment of MEHM in SILC Eurostat Unit F5 “Health and Food Safety Statistics” 4 th meeting of the Task Force on Health Expectancies.
2-Dec-08 Session 2 Healthy life years (HLY) calculations for 2006 and update on the EHIS implementation Eurostat unit F5 ‘Health and food safety statistics’
Agenda item 5 ESS Vision 2020: other activities DIGICOM and SIMSTAT DIME-ITDG joint plenary Luxembourg,
European Health Interview Survey (EHIS) EHIS wave 2: implementation and next plans Agenda point November 2015 Public Health Statistics WG Jakub.
Update on the UOE 2012 data collection
5. Areas under organic farming
Ag.no. 16 Supplement to Eurostat Annual Report, October 2014
GBV survey: progress EUROSTAT 20 March 2018.
Education and Training Statistics Working Group – June 2014
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
Education and Training Statistics Working Group, May 2011
Item 4.2 – Implementation of the Adult Education Survey
Ag.no.16 A65 country manuals and country assessments
Review plan of the nature reporting – update 7
Education and Training Statistics Working Group
LAMAS October 2017 Agenda Item 3.2 Labour Cost Indices state of play Daniel Iscru Hubertus Vreeswijk.
Agenda Item 2.1 SES 2014: follow-up
ETS Working Group, 5-6th June 2012
DSS meeting 2.4 European Health Interview Survey (EHIS): Draft Commission Regulation 21 March 2012.
Progress Report on Annual Financial Accounts
NUTS Agenda: 5.1; Document 9
Item 11 – Conclusions – ETS 2018 WG meeting
2a. Status of WFD reporting
Item 7.1 Implementation of the 2016 Adult Education Survey
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Ag.no. 15 Lessons from the 2016 A65 exercise
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
State of play: data transmission, validation and dissemination
Introduction. Presentation of the mandate of the Task Force
Working Group on Statistical Confidentiality Item 3 of the Agenda
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Guidelines for the implementation of Regulation (EC) No 91/2003 of the European Parliament and of the Council on Rail transport statistics version 6.0.
Item 4.1 – Overview of 2014 UOE data collection
Jakub Hrkal ESTAT Unit F-4
DRAFT COMMISSION REGULATIONS IMPLEMENTING EP AND COUNCIL REGULATION No 1338/2008 ON: - CAUSES OF DEATH STATISTICS - ACCIDENTS AT WORK (ESAW) AGENDA.
Agenda item 5.3 EHIS - Implementing Regulation
Item 4.3 – Repeal of CVTS legal acts
WFD River Basin Management Plans :
The EPSS (European Programme of Social Surveys) project
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
Conclusions of the meeting
Conclusions of the meeting
Item 5.1. Learning Mobility in Higher Education
Legal and implementation issues update
State of Play RBMPs and WISE reporting (9/07/10)
Item 4 Overview of the 2016 AES & 2015 CVTS data collection
European Statistical Training Programme (ESTP)
Grants for the implementation of ISCO 08 during 2010
GENERAL BACKGROUND INFORMATION FROM EUROSTAT
Update on status of reporting and validation process
Item 8 - Disability statistics
Doc.A6465/16/03 Ag.no.16 A65 country manuals
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group June 2018
Working Group meeting "Statistics on Living Conditions"
LAMAS Working Group June 2015
Progress Meeting on sub-national statistics Items 2_3_4_6_8 Luxembourg, 7 November Eurostat.
Teodora Brandmuller Unit E4
Presentation transcript:

8th meeting of the Task Force on Health Expectancies Session 1 – Update from the Commission SILC/EHIS update/EDSIM

EHIS implementation

National plans for the 1st EHIS round 21 countries participate (18 MS + TR + CH + NO) Inclusion of the EHIS modules: all of them in 12 MS + TR) partial inclusion in 6 MS + CH + NO

EHIS first wave data transmission Agreement for the microdata file transmission: 15 MS + TR Agreement for following the Eurostat guidelines on data delivery: 14 MS + TR Transmission calendar to Eurostat: –5 files already transmitted (CZ, LV, MT, AT and SI) –3 files by the end of 2009 (BG, EE and CY) –2 files in the 1st quarter of 2010 (RO and TR) –6 files by the end of 2010 (BE, EL, ES, HU, PL and SK) Transmission done via eDAMIS Web Portal Microdata file in CSV format

Validation of the EHIS data Skip, range and consistency rules: –finalised in September 2009 after receiving comments from MS and using them on few data sets –to be provided to the countries for using them before sending the microdata file to Eurostat Experience with the first data sets submitted: –Lot of corrections are needed –Most errors result from the non-application of the Eurostat codification rules (thousands of errors)  a lot of time could be saved if these codification rules are exactly followed

Reporting on the quality of the survey Template developed by Eurostat and discussed with the CG and TG HIS Revised version tested by CZ, FR, MT, AT and SI Final version to be presented to the CG HIS in November 2009

EHIS indicators and their calculation method Draft document developed by Eurostat and presented to the CG and TG HIS, as well as to the ECHIM core group List of indicators based, inter alia, on the following indicators lists: –European Community Health Indicators (ECHI) –Sustainable Development Indicators –EU Structural Indicators –Indicators proposed by the Open Method of Coordination (OMC) Finalization of the document foreseen for end November 2009

Future work in relation to 1st wave By end-November 2009: Finalisation of the template for reporting on the survey as well as of the calculation method for the EHIS indicators Data validation and production of tables – to be done in three steps: –by April 2010 for the 8 countries (BG, CZ, EE, CY, LV, MT, AT(?), SI) for which data are in Eurostat before end 2009; –by October 2010 for the 4 countries (BE, HU, RO, TR) for which data are in Eurostat before mid-2010; –by April 2011 for the 4 countries (EL, ES, PL, SK) for which data are in Eurostat in the second half of By June 2011: Finalise the procedure for granting access to the EHIS microdata to the research community By mid-2012, performance of statistical analysis and publication of the EHIS first round data (performance of methodological studies and advanced statistical analysis of the data in view of accurateness, comparability and validity).

Preparation of the EHIS 2 nd round

EHIS 2 nd round EHIS 2 nd round foreseen for 2014 (derogation 2013) Brief timetable: –2010: Preparatory work –First half of 2011: Eurostat drafts the implementing Commission Regulation. This draft regulation will be discussed by the CG and TG HIS meetings –Second half of 2011: Discussion by the Public Health Statistics Working Group –Beginning of 2012: written consultation of the DSS (Directors of Social Statistics) –2012: Discussion and approval by the ESS Committee in May or September 2012 –By the end of 2012: adoption by the Commission

EHIS actions foreseen in 2010/2011 EHIS workshop –Date: 1st semester of 2010 –Participants: HIS experts from all MS, EFTA, CC –Aims: share experience with the EHIS implementation  discuss about problems encountered during this implementation and how they could be avoided in future, agree on those parts of the questionnaire that need to be improved, make recommendations as regards the practical ways to do the improvement, decide what guidelines and/or improvements in the existing guidelines, conceptual cards are needed for the 2nd EHIS round Improvement of those parts of the EHIS questionnaire considered as being problematic (at least the questions on mental health, physical activity and alcohol consumption need improvement)

European Disability and Social Integration Module (EDSIM)

Aim: to develop a module on participation in society life of people with disability Final report available in the public part of Circa ( : –Click on 'Public Health Statistics' -> Library in the menu -> ‘ Reports and ongoing methodological developments' -> Disability' -> 'EDSIM - final report (June 2008)' Next steps: –2008/2009: Eurostat action for translation/testing in 10 MS –2009/2010: Eurostat action for evaluating the tests and to provide recommendations for a final version –2012: EDSIM implementation

EDSIM: content of questionnaire TEN SECTIONS –Access to and use of Internet –Access to learning opportunities –Employment –Economic Life –Mobility –Transport –Community life and leisure pursuits –Accessibility to buildings –Social Contact –Negative attitudes and behaviour