QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.

Slides:



Advertisements
Similar presentations
How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
Advertisements

Disclaimer. Statements of possible future functionality for IFS’ software products and technology are for information purposes only and should not be interpreted.
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Intracompany Stock Transfer Scenario Overview
QAD Item Attributes and Quality Control Forrest Mori – Principal Business Analyst West Coast User Group, February 11, 2013.
Manufacturing : Scheduling to Execution Joseph A. Phelan, CPIM 11 May, 2011 Session : BT2 Product Roadmap and Direction.
Serialization, Item Attributes & Quality Control Hank Canitz – Sr. Director Industry Solutions, QAD Marketing QAD Midwest User Group.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review Carianne Nieuwstraten, QAD Product Manager MWUG, March 20, 2012.
The Production Process
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
Material Requirements Planning (MRP)
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
QAD Planning and Scheduling Workbenches Carianne Nieuwstraten, Product Manager, QAD. Inc Ben Crawford, CSCP, Production and Inventory Control Manager,
Simplifying Industry Compliance, Materials Management, and Quality Control Carianne Nieuwstraten – Sr. Product Manager, QAD R&D MFG Midwest User Group.
QAD Customer Day – Santa Clara, CA QAD SERIALIZATION, ITEM ATTRIBUTES, QUALITY CONTROL & LOT TRACE WORKBENCH Simplifying Industry Compliance, Materials.
Production Scheduling: What Tool is Right for You?
QAD Business Intelligence: A Closer Look Luc Janssen Director, Product Management, QAD Inc. QAD Explore 2012.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Manufacturing Futures
QAD Routings Implementation Sheri Forrest – RFBP Nadia Truxell – Logan Consulting.
Production Planning and Control Introduction
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Pam Lopker March QAD Proprietary Op Budget ROI Efficiency Training.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Carianne Nieuwstraten – Senior Product Manager, QAD Chris Loerch.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
QAD Manufacturing Solution Enhancements for 2012 March 12, 2012 QAD Midwest User Group Meeting.
HP PPM Center release 8 Helping IT answer the tough questions
Intelligent Supply Chain Management Strategic Supply Chain Management
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #15.
Operations Fall 2015 Bruce Duggan Providence University College.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
QAD Customer Day – Santa Clara, CA QAD Customer Value Day WELCOME!
Manufacturing Update: Rising To The Challenge Carianne Nieuwstraten – Sr. Product Manager, QAD R&D MFG September 23, 2014 Midwest User Group.
QAD Demand Management Patrick Grace, QAD Solutions Consultant September 27th, Fall MWUG Session.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
AXUG Partner Showcase – Introducing Preactor
QAD Financial Report Writer
Make-to-Stock Scenario Overview
Using Item Attributes in a Make-to-Order Environment
Intracompany Stock Transfer Scenario Overview
Pam Lopker March
Make-to-Stock Scenario Overview
Intracompany Stock Transfer Scenario Overview
When You Can See It, You Can Believe It.
Material Requirements Planning (MRP)
14 MRP and ERP.
Intracompany Stock Transfer Scenario Overview
Operations Management
Incorporating lot sizing into MRP
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG - 03/22/2010

QAD Proprietary Agenda  MFG/SC - Key Strategic Initiative  Master Scheduling Objective & Challenges  Workbench Framework Introduction  Roadmap  Master Scheduling Futures  Demo  Early Adopter Program  Wrap Up

QAD Proprietary Key Strategic Initiative Provide a workbench for each key role in the Manufacturing and Supply Chain areas

QAD Proprietary Master Scheduler’s Objective  Establish an item’s most optimum build schedule that meets customer demand – Measurements : Improved Customer Service – On time deliveries – Reduced back orders Reduced Inventories – Inventory turns – Reduced inventory investment Stable Manufacturing Schedule – Increased production efficiency – Reduced set up costs/time – Reduced overtime costs

QAD Proprietary Master Scheduler’s Challenge Finance Engineering Executives Manufacturing Sales There’s too much cash tied up in inventory! There’s a new product introduction scheduled for the fall! But we need more time for design! Service levels are down. I need more inventory! Whatever it takes to keep the customer happy! ROI must improve; the stockholders are not happy! There are too many changes! Provide fixed schedules and the correct parts and delivery will improve.

QAD Proprietary Master Scheduling Challenge

QAD Proprietary Common Planning Situation

MSW & PSW Framework Introduction

QAD Proprietary Planning & Scheduling – Future Flow Period - > Month - > Week - > Day - > Shift - > Interval - > hour Initial plan is created by the system MRP (traditional) Leveling (new) GRC (new) Demand Received Balance demand / supply /resources to ensure a feasible and level production plan. Production Planned Sequence production orders by item attributes and resource allocations to Optimize shop floor Production Scheduled Verify materials available Release orders Print work orders and schedules Production Dispatched Monitor Production & Manage Production Order Production Reported Base MSW PSW Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Many new capabilities + 60> reports, inquiries, maintenance and process programs rolled up into the new Production Scheduler Production Planned Production Scheduled Production Dispatched Production ReportedDemand received CAC Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum MSW PSW Base CAC MSW/PSW/CAC Together - Consolidation of 50 maintenance, report and inquiry programs - New capabilities (production scheduling, integrated component checking)

QAD Proprietary Framework Introduction Master Scheduling (MSW) Scheduling view designed for the purpose of master scheduling

QAD Proprietary Framework Introduction Production Scheduling (PSW) Scheduling view designed for the purpose of production scheduling

QAD Proprietary Framework Introduction Search Panel extracts content for both workbench views Navigator Panel drives content focus of both workbench views Supporting Frames apply seamlessly to both workbench views

MSW: Primary Grid-Set Introduction

QAD Proprietary Schedule Primary context of the workbench. All workbench activity and navigational behavior is driven from this panel Capacity Displays information per selected resource/item in the Schedule Grid Supply/Demand Provides demand & supply context for selected item in the Schedule Grid. Primary information used for scheduling decision making and adjustments

QAD Proprietary User selects the item row in Schedule Grid. Supporting Panels Enables master scheduling action and decision making. Represents over 30 maintenance programs and reports!

MSW: Views Create customized workbench layouts

QAD Proprietary Views Provides ability to create different user defined workbench layouts and save them for quick access Saves Panel Size Saves Filter/Sort/Group Settings of each Panel

QAD Proprietary Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side

QAD Proprietary Standard Edition June 2010 : QAD 2010 SE release  Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities MSW Roadmap

QAD Proprietary Enterprise Edition September 2010 : QAD EE release  Core Functionality : - Master Scheduling Workbench (MSW) - MSW integrated Component Check Capabilities MSW Roadmap

QAD Proprietary Futures: MPS Leveling Calculation ….is a planning tool to aid in the creation of a leveled Master Production Schedule

QAD Proprietary Leveling the Master Schedule

QAD Proprietary QAD MPS Leveling Calculation Solution  A customizable batch program that automatically calculates a level MPS for a specified date range by site  Batch program output can be viewed, modified and re-leveled in MSW

Demo

QAD Proprietary Master Scheduling Workbench Value  Reduces master scheduling time and complexity  Provides exception alerts to demand, supply and capacity changes  Compresses manufacturing response  Ability to simulate changes  Enables to be proactive

QAD Proprietary Interested In Being An Early Adopter?  Early Adopter Criteria: –.Net use with QAD Enterprise Applications – eB2.1, SP4 or higher – Using QAD Enterprise Applications Discrete Work Orders or Advanced Repetitive No or verified customizations – High data integrity/accuracy BOM’s, inventory records, clean MRP data etc. – Verified business need for MSW, PSW and integrated component check capabilities – Resource availability from May 10 th through around July 12 th Project Manager, Master Scheduler, Production Scheduler, Material Planner availability – Go live within the May 10 th – July 12 th time period

QAD Proprietary QAD Demo Center  MSW and PSW  Tuesday, March 23 rd : 8:30 – 11:30am  Step through specific business scenarios You ask, we show  Come talk to us!

QAD Proprietary Contact Information  Carianne Nieuwstraten Phone:  Brent Shooltz Phone: