The Cardiac Surgery Translational Study (“CSTS”) The Quality And Safety Research Group Data We Can Count On Lisa H. Lubomski, PhD April 8, 2011 Immersion.

Slides:



Advertisements
Similar presentations
The Team Check-up Tool. Slide 2 Learning Objectives To understand the tool we use to: – Describe the anticipated activities of your ICU quality improvement.
Advertisements

1 Changes to the MTCT & Discussion of the Impacts on Submission Jill Marsteller PhD, MPP Christine George, RN, MS Kelly Gardner, MA On the CUSP: Stop BSI.
MHA Keystone Center for Patient Safety & Quality Chris George, RN MS Project Manager, MHA Keystone Center
Sean Berenholtz, MD MHS FCCM September 20, 2011 at 2ET/1 CT/12 MT/11 PT Ventilator Associated Pneumonia Prevention CLABSI Supplemental Call Series.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Audit Your Care A Closer Look at CLABSI and SSI Audit Forms Armstrong.
CSTS: The Cardiovascular Surgical Translational Study Senior Leadership of Quality and Safety Initiatives in Health Care Peter J. Pronovost, MD, PhD The.
SUSP: Improving Surgical Care through TRIP and CUSP
On the CUSP: Stop BSI National Content Call Chris George, RN MS Director, National Projects MHA Keystone Center for Patient Safety & Quality Monthly Team.
Building Your CUSP Team Part I Michael Rosen, PhD August 28, 2012 Armstrong Institute for Patient Safety and Quality Conference Number(s):
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Using the Online HSOPS & RC Apps for CSTS Armstrong Institute for.
Assessing Patient Safety Culture and Navigating the CUSP 4 MVP-VAP Portal.
Welcome to the GHA Infection Prevention Power Hour January 17, 2013 Denise M. Flook, RN, MPH, CIC Georgia Hospital Association
Indiana Healthcare Associated Infection Initiative Kickoff.
The Cardiac Surgery Translational Study (“CSTS”) The Quality And Safety Research Group Surgical Site Infection Prevention Elizabeth Martinez, MD, MHS
Copyright ©2011 Georgia Hospital Association FLEX GRANT Kathy McGowan Vice President, Quality & Safety Samantha Dulworth Technical & Customer Specialist.
© 2009 On the CUSP: STOP BSI Overview of STOP-BSI Program.
CUSP 4 MVP – VAP Improving Care for Mechanically Ventilated Patients Strategies for Collecting and Entering Early Mobility ARMSTRONG INSTITUTE FOR PATIENT.
CUSP 4 MVP – VAP Improving Care for Mechanically Ventilated Patients Implementation Assessment Kisha Ali, MS May 13, 2015 ARMSTRONG INSTITUTE FOR PATIENT.
Toward Eliminating Central Line Associated Blood Stream Infections.
The Cardiac Surgery Translational Study (“CSTS”) The Quality And Safety Research Group Ventilator Associated Pneumonia Prevention Sean Berenholtz, MD MHS.
1 Reducing Healthcare Associated Infections (HAI): Barriers and Challenges MHA Keystone Center for Patient Safety and Quality (MHA Keystone) Chris George,
Improving ICU Care Through Teamwork
Comparative Effectiveness Grant Toward Eliminating Central Line Associated Blood Stream Infections.
CUSP/Stop BSI Collaborative of Missouri Kimberly O’Brien, MHA Project Manager Missouri Center for Patient Safety Jefferson City, MO
Factors determining success in reduction of Central Line Associated Blood Stream Infection (CLABSI) on statewide levels HeeWon Lee, Doris Duke Clinical.
Building Your SUSP Team Part I Armstrong Institute for Patient Safety and Quality.
CUSP 4 MVP – VAP Improving Care for Mechanically Ventilated Patients Content 1: Science of Safety & Identifying Defects ARMSTRONG INSTITUTE FOR PATIENT.
Jill A. Marsteller, PhD,MPP August 10, 2011 CSTS: The Cardiovascular Surgical Translational Study Assessing Culture.
Building a Team. Slide 2 Immersion Call Overview Week 1: Project overview Week 2: Science of Improving Patient Safety Week 3: Eliminating CLABSI Week.
December 3, 2014 Lauren Benishek, PhD & Sallie Weaver, PhD
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Armstrong Institute for Patient Safety and Quality Jill A. Marsteller,
Who We Are ~Where We are Going. Slide 2 Workshop Objectives Describe the purpose and vision of the ICU Safe Care Initiative/Comprehensive Unit-Based Safety.
The Johns Hopkins Comprehensive Unit-based Patient Safety Program (CUSP) Peter Pronovost, MD, PhD, Johns Hopkins Univeristy.
CSTS Staff Empowerment Christine A. Goeschel ScD MPA MPS RN.
11/10/20111 On The Cusp Journey: Sentara CarePlex Hospital Gail J. Rudder RN, CRNI Infection Preventionist November 10 th, 2011.
CUSP/Stop CAUTI Collaborative Carol Hafley, MHA, BSN, RN Assistant Director Missouri Center for Patient Safety Jefferson City, MO
1 1 The AHRQ Surveys on Patient Safety Culture Setting the Standard for Patient Safety Culture Around the Globe AHRQ Annual Meeting September 19, 2011.
CSTS Data Entry The Cardiovascular Surgery Translation Study (CSTS) JHU Armstrong Institute for Patient Safety & Quality.
Data…Data…Data April 19, 2011 Sam Watson VP for Patient Safety and Quality MHA Keystone Center On the CUSP: Stop CAUTI 1.
The Comprehensive Unit-based Safety Program (CUSP)
Improving Care Through Technical & Adaptive Work Chris Goeschel RN MPA Director, Patient Safety &Quality Initiatives JHU Quality & Safety Research Group.
NEXT STEPS Armstrong Institute for Patient Safety and Quality 1.
The Basics of the Comprehensive Unit- Based Patient Safety Program (CUSP) Pat Posa RN, BSN, MSA System Performance Improvement Leader St. Joseph Mercy.
Lessons from CUSP/CLABSI – Getting to Zero and Sustaining your Improvements On the CUSP: Stop BSI Jill Marsteller, PhD, MPP Armstrong Institute for Patient.
Disclosures  Nothing to disclose  No discussion of “off-label” use of medications.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Taking Patient Safety to the Next Level Peter Pronovost, MD, PhD 1.
CSTS Data Training The Cardiac Surgery Translation Study (CSTS) JHU Quality And Safety Research Group.
© 2009 On the CUSP: STOP BSI Data We Can Count On.
ICU Safe Care Initiative/CUSP October 5, :00 am – 3:30 pm.
© 2009 On the CUSP: STOP BSI Nurse Empowerment Christine A. Goeschel RN MPA MPS ScD (candidate) Tennessee Center for Patient Safety December 2, 2009.
CUSP 4 MVP – VAP Quantitative Implementation Assessment 1: Aggregated Results Kisha Ali, MS Mayo Levering, BS September 2, 2014.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Auditing Your Care Armstrong Institute for Patient Safety and Quality.
Staff Safety Assessment 1. Learning Objectives To understand Step 2 of CUSP:Identify Defects To understand how to Implement the Staff Safety Assessment.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Providing Feedback: Structural Assessment 2 Results & Exposure Receipt.
© 2009 On the CUSP: STOP BSI Data We Can Count On.
© 2009 On the CUSP: STOP BSI Senior Leadership of Quality and Safety Initiatives in Health Care.
The Comprehensive Unit-Based Safety Program: How Will This Work?
AHRQ Safety Program for Improving Antibiotic Use
An Intervention to Learn from Mistakes and Improve Safety Culture
AHRQ Safety Program for Improving Antibiotic Use
Staff Safety Assessment
Staff Safety Assessment
VP for Patient Safety and Quality
An Intervention to Learn from Mistakes and Improve Safety Culture
Meeting Objectives Build skills among care team members that will improve teamwork, communication, and create a patient safety culture in your unit Hear.
MA ICU Safe Care Initiative: Comprehensive Unit Based Safety Program (CUSP) 2010.
Jill A. Marsteller, PhD, MPP, Mei Wen, PhD, Yea-Jen Hsu, PhD, Laura C
Dolores Hagan, RN BSN K-HEN Education and Data Manager August 2012
On the CUSP: Stop BSI.
Using the MTCT to Your Advantage
Presentation transcript:

The Cardiac Surgery Translational Study (“CSTS”) The Quality And Safety Research Group Data We Can Count On Lisa H. Lubomski, PhD April 8, 2011 Immersion Call

Slide 2 Learning Objectives To understand the importance of accurate data collection and entry. To understand the data collection and entry requirements for the CSTS. To outline next steps towards implementing data collection activities as part of CSTS.

Slide 3 Immersion call Schedule TitleDate /Time 13:00 EST Presented by Program Overview Feb 18, 2011Peter Pronovost MD PhD Science Of Safety February 25, 2011Jill Marsteller, PhD, MPP Comprehensive Unit-Based Safety Program CUSP March 4, 2011Christine Goeschel MPA MPS ScD RN Central Line Blood Stream Infection Elimination March 11, 2011David Thompson DNSC, MS Surgical Site Infection Elimination March 18, 2011Elizabeth Martinez, MD, MHS Ventilator-Associated Pneumonia Reduction March 25, 2011Sean Berenholtz, MD Hand-Offs: Transitions in Care April 1, 2011Ayse Gurses, PhD Data We Can Count On April 8, 2011Lisa Lubomski, PhD. Team Building April 15, 2011Jill Marsteller, PhD, MPP Physician Engagement April 22, 2011Peter Pronovost, MD, PhD

Slide 4 CSTS Timeline Planned Roll-out – CLABSI Prevention interventions and monthly data collection: June, 2011 – SSI Prevention interventions and monthly data collection: approximately September 2011 – VAP Prevention interventions and monthly data collection: after December 2011

Slide 5 Importance of “Good” Data We must ensure that the data we collect are accurate, complete and in the required format. The data we collect and enter are the ultimate proof of our success & de-identified, aggregated data will be shared broadly (i.e., they will influence care and policy).

Slide 6 Roles of Data Baseline – Tells us where we are at the start. On-going – Tells us whether and how we are changing our outcomes and performance. Overall – Tells us what impact we (i.e., the project and its initiatives) have on the goal of reducing/eliminating Healthcare Associated Infections (CLABSI, SSI, VAP).

Slide 7 Data Flow Collect Data Enter data into web- based tool Complete quality checks Store data in database Data analysis and Reporting

Slide 8 Required Data Safety Culture Assessment – HSOPS (Hospital Survey On Patient Safety culture) Baseline CLABSI (Baseline and Monthly) Team Checkup Tool (Monthly) Subsequent SSI and VAP as these initiatives roll out.

Slide 9 Data Elements FormFrequency of Completion How to submitReports generated Safety Culture assessment AHRQ’s HSOPS (Hospital Survey on Patient Safety Culture) CV-OR ICU Floor Baseline and 18 months HSOPS administered CSTS data entry system. Unit reports and comparative reports CLABSI ICU Floor *MonthlyWeb-based data entry system (under development) Available in CSTS data entry system Clinical Area Team Check-Up Tool CV-OR ICU Floor *MonthlyWeb-based data entry system (under development) Available in CSTS data entry system * Due by the 15th of the Month following data collection. (Ex: June CLABSI and TCT are due by July 15)

Slide 10 Data Entry Web-based data entry tool. Tool provides for data entry and reporting Baseline data entered prior to work with CSTS checklist and methods. Monthly data entered by the 15 th of each month. Users can edit monthly data. Rolling 6-month lock on the data. Data quality checks built into the system. Web-based system will send reminders of data due & overdue

Slide 11 CLABSI Data Baseline: entered once at start of project. Usually for the year preceding the start of the immersion calls. Monthly: entered by the 15 th of the month. – For example, June’s data is entered by July 5th. Total number of CLABSIs in the unit for the period of interest (baseline or month). Numerator Total number of central line days in the unit for the period of interest(baseline or month). Denominator

Slide 12 Sources of CLABSI Data Often these data are available from the infection preventionists (IPs) in your hospital. Team leader needs to arrange to obtain the data from infection control for baseline and monthly thereafter. Need to establish a pathway and process for resolving problems, questions with data.

Slide 13 Entering CLABSI Data Identify 1 or more people to complete data entry. Good to have a back up in case of illness, vacation, etc. Make sure IPs know to whom data should be sent each month

Slide 14 Monthly Team Checkup (MTCT) Each clinical area has a relevant MTCT: CV-OR; ICU; Floor Completed monthly – Completed on paper at a meeting with quorum of team members present; – Completed on paper by team members & forwarded to team leader for synthesis

Slide 15 MTCT Form provides a snapshot of team activity during the month. Allows team leaders, executives, collaborative sponsor and faculty to identify strengths and weaknesses of teams. Help teams who need help and identify teams who might mentor other teams.

Slide 16 Measuring Culture AHRQ’s Hospital Survey on Patient Safety (HSOPS) – A 51 item survey instrument – Approximately 10 minutes to complete – Most of the items use Agree/Disagree or Never/Always response categories

Slide 17 HSOPS What can teams do with results from the HSOPS? – Raise staff awareness about patient safety. – Diagnose and assess the current status of patient safety culture. – Identify strengths and areas for patient safety culture improvement. – Examine trends in patient safety culture change over time. – Evaluate the cultural impact of patient safety initiatives and interventions.

Slide 18 HSOPS Collection will be web-based Methods will be discussed on a future call and supported by documentation HSOPS will be completed by all clinical area staff members (both clinical & non-clinical) Reporting will be anonymous

Slide 19 Additional Data Surgical Site Infections Ventilator-Associated Pneumonia

Slide 20 Summary Teams will collect & enter data monthly. CLABSI data will be collected first with SSI & VAP rolled out in the future. All teams complete a MTCT Ensuring data quality is of utmost importance. A web-based data entry system is being developed for use in entry & reporting. Training will take place during May meeting Watch for information & training on HSOPS, SSI, VAP

Slide 21 Action Items  Identify HOW and from WHOM monthly CLABSI data (numerator & denominator) will be obtained.  Determine the process for completing the Team Checkup Tool monthly for your clinical area.  Identify WHO will be responsible for data entry in your clinical area.  Ensure that everyone involved in data entry is trained & understands what they need to do.  Develop a process for ensuring data quality control.