GTE(+) / ENTSOG Web Survey on CAM Results Thomas L’Eglise - Fluxys ENTSOG Capacity Working Group ERGEG Workshop on CAM/CMP – Brussels – February, 2 nd.

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
European Developments: Capacity Transmission Workgroup 6th October 2011.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Congestion Management
Public Consultation : main conclusions (1/2)
Gas Transmission Europe
19th GRI Coordination Group meeting
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
New transparency guidelines
Harmonization of Cross Border Transmission Tariffs between
EU Implementation Programme
GSE worked with ERGEG on CAM/CMP since
Background and Process
Regulators’ update on Congestion Management and Balancing
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
26th February 2015 Teleconference
The Incremental Proposal
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Proposer: Malcolm Montgomery Panel Date: 20/10/16
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
Jacques LAURELUT GTE First Annual Work Programme Consultation
The establishment of the 2nd list of Projects of common interest
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

GTE(+) / ENTSOG Web Survey on CAM Results Thomas L’Eglise - Fluxys ENTSOG Capacity Working Group ERGEG Workshop on CAM/CMP – Brussels – February, 2 nd 2010

Introduction -ENTSOG -Articles, Rules completed Oct GTE+ transferred into ENTSOG on 1 Dec Brussels, 83, Rue Ducale -Preparatory works on CAM & CMP in 2009 under GTE+ -First Phase Report with Workshop -Bilateral talks with ERGEG during CAM FG development -Preparation of practical NC arrangements -Bilateral talks with organisations -Web Survey on Products and Methods 2

Content -Respondents -Standard Products -Allocation Method -Conclusions 3

Respondents 27 answers – Network Operators are not taken into account – No NRA answers received High representation of the North-West region

Standard Products Top 3 - widely supported – Daily, Monthly, GasYear Some respondents require all possible maturities to be available – as standard products – through combination of similar consecutive products (many respondents asked for the combination of a Yearly product to shape Multi-Annual) A “Priority ranking” has been used, but some respondents commented on a number of occasions that a group of products of equal importance is necessary to support the shipping activity

Quotas Quotas are widely supported Almost always for supporting “short term” – Short Term is undefined but focus on short lead times When quotas are not favored, it is mostly because of the respondents refusing market distortion by artificially reducing the availabilities

Allocation Method Single or Composition Method? Composition is top (but not by a wide majority) Auctions are second OSP and FCFS only have a limited support??

Allocation Method Which Composition? OSP/Pro-rata for Long and Medium Term Auctions or FCFS for Short Term

Allocation Method What to do with congested IPs? 59% favor a similar method for congested or non- congested situations – Other: 2/27 that are unsure of the effects Which “unique” method? – Auctions in 50% of cases – OSP, or composition based on OSP is then favored

Allocation Method What to do when congestion “occurs”? When there is no congestion, wide range of solutions When congestion occurs, then 2 strategies: – switching to Pro-rata – or Auctions

Feedback on the survey The web survey is welcomed – Format is good – Easy to fill in and follow – Few, precise and concise questions Comment fields have been widely used Subject is perceived as crucial by respondents Cross section of industry views received

Conclusions Offer Standard Products – Base Package: Daily, Monthly and GasYear – Allow combination of consecutive products Long/Medium/Short Term = Combination of allocation lead time and product – Long term (long lead time + long products) e.g. Allocating now [Y+5] to [Y+25], based on GasYears or Combination of GasYears – Short term (short lead time + short products) e.g. Allocating now [M+1] to [M+6], based on Months or Combination of Months? e.g. Allocating now [D] to [D+30], based on Days or Combination of Days – Apply quotas on long term to support short term Apply a single allocation strategy for all IPs – Same method to be applied for congested or non-congested situations – 2 Options: Combination where OSP/Pro-rata is used for long term and auctions for short term Auctions for all terms, as referenced in the proposed Framework Guidelines