B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400 005

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
ICAL Instrumentation Challenges &/ Opportunities B.Satyanarayana TIFR, Mumbai.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
B.Satyanarayana, For INO Collaboration. B.Satyanarayana, INO INO-KEK Meeting January 28, 2009, TIFR, INDIA2 48.4m 16m 14.5m To study atmospheric neutrinos.
Results from development of Glass RPCs for INO detector
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Dr. B.Satyanarayana ▪ Scientific Officer (G) Department of High Energy Physics ▪ Tata Institute of Fundamental Research Homi Bhabha Road ▪ Colaba ▪ Mumbai.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
ICAL Electronics: Requirements and Challenges B.Satyanarayana TIFR, Mumbai.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
India-based Neutrino Collaboration(INO), INDIA1 B.S.Acharya, Sudeshna Banerjee, P.N.Bhat, S.R.Dugad, P.Ghosh, K.S.Gothe, S.K.Gupta, S.D.Kalmani, N. Krishnan,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
ICAL electronics and DAQ schemes - 1 B.Satyanarayana, TIFR, Mumbai For INO Collaboration.
Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba Mondal, TIFR, Mumbai Department of Physics Indian Institute.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Status of NA62 straw electronics Webs Covers Services Readout.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
16 October, 2009ASET talk - S.S.Upadhya Electronics and DAQ system for INO-ICAL prototype detector (Presented by S.S.Upadhya, TIFR on behalf of INO collaboration)
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
INO prototype detector and data acquisition system Anita Behere, M.S.Bhatia, V.B.Chandratre, V.M.Datar, P.K.Mukhopadhyay Bhabha Atomic Research Centre,
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
CMS EMU TRIGGER ELECTRONICS
INO TRIDAS presentations
Front-end electronic system for large area photomultipliers readout
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, Electronics, trigger and DAQ system for INO prototype detector and A few thoughts for ICAL detector

B.Satyanarayana IMSc, Chennai February 22-24, INO prototype detector Detector and signal specifications –Detector dimensions: 1m X 1m X 1m (approx.) –14 layers (max) of RPCs with 6cm iron plates interleaved. –Two signal planes orthogonal to each other and each having 32 pick-up strips –Total channels = 32 X 14 X 2 = 896 –Pulse height = 100 to 300mV; Rise time = < 1 ns –Pulse width = ~50ns; Rate ~ 1KHz Trigger information –Expected trigger rate is few Hz –Required (in situ) trigger logic is m X n fold, where –m = 1 to 4; no. of consecutive channels in a layer –n = 5 to 1; no. of consecutive layers with m fold in each layer –i.e. m x n = (1 x 5) OR (2 x 4) OR (3 x 3) OR (4 x 2) –External scintillate paddle based trigger Information to be recorded on a trigger –Absolute arrival time of the trigger –Track identification (XYZ points in RPC layers) –Direction of track ( TDC information) –Miscellaneous information and calibration data Monitoring health of the detector

B.Satyanarayana IMSc, Chennai February 22-24, Readout scheme for prototype

B.Satyanarayana IMSc, Chennai February 22-24, Fast preamplifier Provided by Electronic Division, BARC Currently being used with avalanche mode operation Fixed gain (10), single channel, single polarity, with discrete components (availability issues)

B.Satyanarayana IMSc, Chennai February 22-24, Preamp hybrid Bipolar operation tested To be packaged into a hybrid (BEL) Possible to mount on the RPC pickup strips Will improve signal to noise Fabrication procedure –Circuit schematic by BARC –Layout preparation by BEL (2-3 weeks) –Pilot production by BEL and validation (1 month) –Final production (4-6 weeks) –Problem: Purchase procedural delays (File with IFA)

B.Satyanarayana IMSc, Chennai February 22-24, channel analog front-end Based on Analog Devices’ Quad-device Fast comparator with ECL outputs Wire ORed pre-trigger outputs Production board tested with RPC strip signals Works as good as commercial units Components being procured Ready for production (2-3 months) Partial production boards arrived

B.Satyanarayana IMSc, Chennai February 22-24, channel digital front-end

B.Satyanarayana IMSc, Chennai February 22-24, Digital front-end status Logic fused into a CPLD XC HQ708 Code tested on a simulator and hardware using a pattern generator Jig fabricated to test the logic on RPC signals Work in progress (2 weeks); delayed due to manpower redeployment; restarted now PCB layout is also in progress Production estimate about 3 months

B.Satyanarayana IMSc, Chennai February 22-24, Prototype detector trigger logic

B.Satyanarayana IMSc, Chennai February 22-24, CAMAC based trigger module FR C 60 5 Fold coincidence of consecutive F1 signals from 1 to 14 layers 2 Fold coincidence of consecutive F4 signals from 1 to 14 layers 3 Fold coincidence of consecutive F3 signals from 1 to 14 layers 4 Fold coincidence of consecutive F2 signals from 1 to 14 layers OR OR Similar coincidence logic from Y Plane signals ( 1F to 4F) OR OR Final trigger m-Fold LVDS signals (X-Plane) m-Fold LVDS signals (Y-Plane)

B.Satyanarayana IMSc, Chennai February 22-24, Trigger module status Being developed by Electronics Division, BARC Implemented using a FPGA Major part of logic coded; scalars to be done Module given for fabrication; now delivered Expected to be ready in two months Testing and debugging (1 month)

B.Satyanarayana IMSc, Chennai February 22-24, CAMAC based control module Generates three sets of control and hand shake signals for selection of DFE board, readout of event data and monitoring of pickup signals in the selected board

B.Satyanarayana IMSc, Chennai February 22-24, CAMAC based readout module Four serial event data read out channels Eight monitor data inputs Serial to parallel conversion of event data Data written into FIFO buffer FIFO buffers readout through CAMAC backplane in the event routine Eight selected monitor channels translated into ECL logic signals Rates monitored through ECL input CAMAC scalar modules Module is ready

B.Satyanarayana IMSc, Chennai February 22-24, Other items High voltage supplies (CAEN, SINP) Low voltage supplies (Local) Components, cables etc Commercial/available modules –TDCs –Scalers –CAMAC crates and controllers DAQ software on Linux platform –Technical specification ready

B.Satyanarayana IMSc, Chennai February 22-24, Thoughts on eTRIDAS for ICAL KGF still inspires! Channel count a factor of 1000 for ICAL Time tested ideas; blended with VLSI technology Reasonably simple scheme; the need is density Low rates; high degree of multiplexing possible ASICs, pipelining, trigger farm,VME are the keys ASICs for front-end, timing, even for trigger!

B.Satyanarayana IMSc, Chennai February 22-24, Major sub-systems Analog and digital front-ends –Mounted on or very close to detectors –Programmable preamps and comparators –Latches, pre-trigger generators, pipelines and buffers –Data concentrators and high speed serial transmitters VME back-ends –Data collectors and frame transmitters –Time to digital converters (TDCs) Trigger system –Works on inputs from front-ends, back-ends or external –Place for high density FPGA devices

B.Satyanarayana IMSc, Chennai February 22-24, DAQ scheme for final detector The keywords are channel count and fast timing

B.Satyanarayana IMSc, Chennai February 22-24, Readout system concept

B.Satyanarayana IMSc, Chennai February 22-24, Front-end ASIC concept

B.Satyanarayana IMSc, Chennai February 22-24, Slow control and Monitoring Front-end control and monitoring High voltage control and monitoring of V & I Gas system monitoring –Channel control and flow monitoring –On-line gas sample analysis (RGA) –Gas leak monitoring –Moister level monitoring Ambient parameter monitoring –Temperature, barometric pressure, relative humidity –Data can be used for even for off-line corrections

B.Satyanarayana IMSc, Chennai February 22-24, High voltage system Number of independently controllable channels? –3 detector modules, 140 layers, 16m X 16m lateral size and RPC area of 2m X 2m Worst case: Combine all RPCs in a layer  420 channels Best case: One channel per RPC  27,000 channels! We can settle for one channel/road/layer, for example Ramp rate, channel control, voltage and current monitoring are the bare minimum requirements Modular structure, Ethernet interface, local consoles, distributed displays, complete high voltage discharge etc are most desired features

B.Satyanarayana IMSc, Chennai February 22-24, Some technology standards Backend: VME Platform: Linux? Networking of processing nodes Front-end, gas system and HV control: Ethernet Ambient parameter monitoring: Embedded processors with Ethernet interfaces Web servers for operating parameter browsers On-fly sample data quality checks

B.Satyanarayana IMSc, Chennai February 22-24, Preliminary action plan Expertise from TIFR, BARC, SINP, VECC, IITB, IGCAR, NSC etc (Proposal from BHU) Industry ready and active ASIC design process must begin now Comparator ASIC work by SINP; BARC waiting Tools and training of personnel Updating of experiment’s requirements of eTRIDAS Discussion meeting at national level