APPLYING POLICIES TO DEVELOPMENT APPLICATIONS PLANNING SCHEME POLICIES.

Slides:



Advertisements
Similar presentations
Union of B.C. Municipalities Clinic on Understanding Development Cost Charges September 24,
Advertisements

Infrastructure and Public Facilities Needs Assessment Planning Department County of Hawai`i.
Major works RESIDENTIAL LEASEHOLD EXPERTS. THE BASICS Your Landlord has a duty to you and all Leaseholders in the property, to properly and continually.
FQHC Look-Alike Change in Scope Module for Implementation of Electronic Information Systems August 5, 2010 Esther Paul, Public Health Analyst Anil Bommakanti,
Remote Operations Indigenous Community Development.
Retirement Villages : Best Practice Planning Friday 29 August 2008.
Development Contributions Witzenberg Municipality 30 October 2013.
Thinking of entering full-time higher education in 2010/2011.
CORA Policies for Special Districts Presented by: Jeffrey Erb Colin Mielke 1.
Te Kopuru Further Explanations. Recap Transition Rates Remission Policy Last year we introduced a new rates remission for the stormwater/wastewater increase.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Bend, OR | Eugene, OR | Portland, OR | Salem, OR | Seattle, WA | Vancouver, WA | Washington D.C. “Serving Land for Jobs” Infrastructure.
Finance Information Open Evening Tuesday April 14 th 2015.
PUBLIC HEARING: Development (Impact) Fees - Land Use Assumptions & Infrastructure Improvement Plan Reports June 30, 2014.
CHAPTER 8 Documentary Letters of Credit
Parkes Shire Council Understanding your Water Account Water Charges Council’s water charges have been developed in accordance with the State Government’s.
Development Contributions Planning Agreements Environmental Planning and Assessment Act 1979 Part 4, Division 6, Subdivision 2 lindsaytaylorlawyers Level.
Community Development Department PALM COAST PARK SECOND AMENDED AND RESTATED DEVELOPMENT OF REGIONAL IMPACT DEVELOPMENT ORDER Application #2167.
Statewide Community Infrastructure Program “SCIP”.
REVIEWING ESTIMATED HUD STATEMENTS. What is a HUD statement?  A Housing and Urban Development (aka HUD) statement is a document prepared by a closing.
Community Development & Planning Grant Pre-Application Meeting April 17,
Development Contributions George Municipality. BASIS FOR DETERMINING DEVELOPMENT CONTRIBUTIONS PSDFPSDF George Municipality’s SDFGeorge Municipality’s.
Obligations and Practices Information Session April 2013 regulations PRIVATE CERTIFICATION FOR PLANNING ASSESSMENTS.
Overview of System Development Charges Presented to the Ad Hoc Committee on Large Diameter Water Mains by Chris Cullinan, Acting CFO January 8, 2014.
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Planning Scheme Policies Development Industry Information Session 10 November 2009.
Section 106 Overview Tony Melia – Section 106 Officer.
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Impact Fee Updates Board of County Commissioners Public Hearings October 30, 2012.
Systems Development Charge (SDC) for Water and Wastewater Services GWA Rotary Clubs Thursday, February 11, 2010.
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Proposition 1 Workshop: the Grant Application Process July 2015.
Bell Ringer Do you think having a credit card is a good or a bad thing? Why or why not?
2015 ABNMS Conference Application of Bayesian Networks in Urban Growth Models © 2015, Sizztech Pty Ltd.
________________________________________________________________________________________________________________________________________________________.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Community Infrastructure Levy Implementation July 2014.
Mountain Regional Water Rules & Regulations Overview.
ACN Product Overview – nbn™ 1 April What is the nbn™? The national broadband network (nbn™) is an Australian Government initiative designed to upgrade.
City of Ottawa 2014 Development Charges Background Study Affordable Housing July 8, 2014.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
City of Burlington Planning Applications Fees Review Community Development Committee Presentation January 14, 2013.
Initial Budget Proposals 2015/16 Initial Budget Proposals 2015/16 Presentation by Leader of the Council and Portfolio holder for Performance and Efficiency.
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
G & A Lloyd, LLC ZOM Location Map. G & A Lloyd, LLC ZOM Aerial.
Council Improvement Plan Council Meeting 1 June
Community Infrastructure Levy S106 vs CIL July 2014.
Orange County Government Adoption Public Hearing May 10, 2016 Board of County Commissioners School Impact Fee Update.
Stormwater Utility City of Rowlett
Filing the FCC Form 471 E-rate Program Applicant Training
How To Register & Order Meals on Meal Selector
Presented by Kelsey Lang, Planning Associate June 27, 2016
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
Section 106 A Strategic Approach
Large scale development groundwater balance
City of Madras System Development Charges
Kaipara District Development Contributions Policy
Development Charge Public Meeting October 23, 2017
System Development Fees
Regulation Amendment AM April 3, 2018.
Proposed 2018 Budget Truth In Taxation Hearing December 5, 2017
Subdivision Applications
City Council Meeting April 29, 2019
Ski Clubs and E-Commerce
Using AIM (for Instructors)
Presentation transcript:

APPLYING POLICIES TO DEVELOPMENT APPLICATIONS PLANNING SCHEME POLICIES

Overview Infrastructure Charges Advice Infrastructure Charges Notice Calculation of Proposed Demand -Standard Lot Residential Development -Non Residential Development Existing Demand

Multiple Land Uses Multiple Service Catchments/Charge Areas Capping of Contributions -Applying Capping Infrastructure Agreements Credits

Infrastructure Charges Advice The Infrastructure Charges Advice will be issued with every Decision Notice. This Advice is an ‘Advice Only’ and payment cannot be made on this. The Advice contains the Proposed demand and Existing demand only. Any Capping, Credits, Discounts etc will not be applied until the applicant intends to pay the charges.

Infrastructure Charges Advice from ICR (Sent out with Development Permit)

Infrastructure Charges Notice When a development proponent intends to pay contributions, a request for a Notice for payment will be required. This Notice may be requested via The Infrastructure Charges Notice will include any Capping, Credits or Discounts as applicable to the development approval. This Notice will need to be presented to Customer Service with the payment.

Infrastructure Charges Notice

Calculation of Proposed Demand General Information Confirm proposal is located within the designated infrastructure service area (DISA) as per Section 4.2 and Schedule C of the Administration Policy. Check consistency with the assumptions in the plans for trunk infrastructure as per Section of Admin Policy and of each of the network policies.

Assumptions Table for Residential Development in Caboolture

Assessment against Assumptions What is a consistent application in respect to the Infrastructure Planning Assumptions? 1.Must be within the DISA – Schedule C of PSP 21G and PSP 21 (the entire Redcliffe LGA is within the DISA) 2.Are : a)not more than 10% above the assumptions stated in Table 3.2A and 3.4A of Caboolture PSP 21G, b)generally consistent with Table 3.3A and 3.4A of Redcliffe PSP or c)not more than 10% above the assumptions shown on the Schedule D maps of Pine PSP 21 3.Must have the Trunk Infrastructure required by the development scheduled for construction prior to the development occurring for each network. This includes the assessment whether the capacity in all infrastructure networks is available to service the site.

Calculation of Proposed Demand Proposed (Total) Demand Expressed as standard units of demand for each relevant network. To determine the proposed demand, refer to Schedule A: Demand Factors of each Network policy and choose the relevant Land Use. Beside each Land Use is the relevant Demand Factor which provides the parameter to be used, ie Lots, Hectare, Dwelling Units, m2GFA etc.

Standard Lot Residential Development To calculate the proposed charges for each Network, the following information is required: -total site area -number of lots/dwelling units/detached house -depending on district – breakdown in area of lots – ie <600m2 etc Determine the Service Catchments for each Network – this can be located on the maps at Schedule C of the policies or by accessing the data on PD Online. Multiply the number of lots or area (demand parameters) by the demand factor in Schedule A. This will give you the number of demand units applicable for each network. Schedule B contains the Contribution Rates applicable to each network. Multiply the number of demand units by the rate for the relevant service catchment/charge area to get the total amount of the charge.

Water Supply Demand Factors - Pine

Standard Residential Lot Calculation - Pine 10 Lot Residential A Subdivision Total Site Area: 8030m2 (1 Lot) 10 Lots Area: 550m2 each = 5500m2 Land Use: Res A & Future Urban Lot < 1200m2 – single dwelling Sheaves Road, Kallangur Calculations for Water, Sewerage, Road & Park are calculated on a per lot basis. Calculations for Stormwater are calculated on a per Hectare basis.

Standard Residential Lot Calculation - Pine Water: Schedule A: Demand Factors –Res A – Lot size <1200m2 – single dwelling - 2.9EPW/lot Sewerage: Schedule A: Demand Factors –Res A – Lot size <1200m2 – single dwelling - 2.9EPS/lot Stormwater: Schedule A: Demand Factors – Res A Lots <600m2 Quality: 1.52/HaQuantity: 0.15/Ha Road: Schedule A: Demand Factors – RAL – Res A – Lot size <1200m2 – single dwelling – 1 ResDU/lot Park: Schedule A: Demand Factors – RAL – Res A – Lot size <1200m2 – single dwelling – 1 ET/lot Bikeways: Schedule A: Demand Factors – RAL – Res A – Lot size <1200m2 – single dwelling – 0.39 CTE/lot

Standard Residential Lot Calculation - Pine Water: 10 Lots x 2.9 EPW/lot = 29 EPW Sewerage: 10 Lots x 2.9 EPW/lot = 29 EPS Stormwater: Total developable area (8030m2) Quantity:.8030ha x.15 = Demand Units Quality:.8030ha x 1.52 = Demand Units Road: 10 Lots x 1 ResCU = 10 ResCU Park: 10 Lots x 1 ET = 10 ET Bikeways: 10 Lots x 0.39 CTE = 3.9 CTE

Standard Residential Lot Calculation - Pine To determine the $value for the development: Schedule B: Infrastructure Contribution Rates - contains the relevant charge rate for each service catchment/charge area. The charge depends on which service catchment/charge area the development falls into. When the service catchment/charge area has been determined: Multiply the demand units for each network by the relevant charge for the service catchment/charge area.

Water Supply Infrastructure Contribution Rates - Pine

Standard Residential Lot Calculation - Pine Water Service Catchment: Kallangur = $507/EPW Sewerage Service Catchment: Murrumba Downs North B = $1442/EPS Stormwater Service Catchment: Freshwater Creek Quality: $71449/ECAqal Quantity: $62711/ECAqty Road Service Catchment: 6: $ /ResCU Park Service Catchment: North Pine = $ /ET Bikeways Service Catchment: 6: $ /CTE

Standard Residential Lot Calculation - Pine Water:29 EPW x $507 = $ Sewerage: 29 EPS x $1442 = $ Stormwater Quality: x $71449 = $ Stormwater Quantity:.1205 x $62711= $ Road: 10 ResCU x $ = $ Park: 10 ET x $ = $ Bikeways: 3.9 ResCU x $ = $

Standard Residential Lot Calculation - Pine Total Charges for 10 Lot Residential Subdivision Sheaves Road, Kallangur – Residential A: Water:$ 14, Sewerage:$ 41, Stormwater Quality:$ 87, Stormwater Quantity:$ 7, Transport:$ 70, Park:$107, Bikeways:$ 4, Total Charges:$333,462.75

Standard Residential Lot Calculation - Caboolture Total Charges for 10 Lot Residential Subdivision King Street, Caboolture – Residential A: Water:$ 54, Sewerage:$ 47, Stormwater Quality:$ 80, Stormwater Quantity:$ 92, Transport:$ 42, Park:$ 45, Total Charges:$363,139.50

Standard Residential Lot Calculation - Redcliffe Total Charges for 10 Lot Residential Subdivision Parsons Street, Rothwell – Low Density Residential: Water:$ 41, Sewerage:$ 33, Stormwater Quality:$ 20, Stormwater Quantity:$ 54, Transport:$ 59, Park:$ 30, Total Charges:$240,076.50

Non Residential Development To calculate the proposed charges for each Network, the following information is required: -Land Use -Site Area -m2GFA etc for each Use Type Determine the Service Catchments for each Network – this can be located on the maps at Schedule C of the policies or by accessing the data on PD Online. Multiply the number of lots, area etc (demand parameters) by the demand factor in Schedule A. This will give you the number of demand units applicable for each network. Schedule B contains the Contribution Rates applicable to each network. Multiply the number of demand units by the rate for the relevant service catchment/charge area to get the total amount of the charge.

Calculation of Existing Demand Existing Demand means the network demand a development proponent has already paid for in the past or is entitled to by way of existing use rights on the land. Existing Demand is to be applied as per Section 5.3 of the Administration Policies. (1) Any existing demand recorded within Council’s Infrastructure Charges Register (2) Where Infrastructure Contributions have previously been made to Council in respect of the land, the demand on which those contributions were based (3) Equivalent demand of each lawful use undertaken on the land prior to the application being made

Applying Existing Demand Section 5.3 (3) - Equivalent demand of each lawful use undertaken on the land prior to the application being made: Under this clause, the calculation is as follows: (a)This clause is applicable to all zones. Where determination of contributions is based on site area alone – the area to be used is the minimum equivalent site area for the relevant zoning. (b)For vacant residential zoned land connected to Water & Sewer 1 dwelling (detached house) will be allowed. Not applicable to vacant land with non- residential zonings or uses. (c)Existing building or work to be changed – the demand for that part of the existing use proposed to be changed.

Multiple Land Uses Where multiple land uses exist, these need to be identified separately to enable the calculation of demand and charges. Determine each use and the site area for each. Check Schedule A: Demand Factor table in each of the network policies to determine the demand parameter required – ie Hectare, m2GFA etc for each different land use. A calculation will then be required for each land use under each network.

Multiple Service Catchments / Charge Areas Where multiple service catchments/charge areas exist for a development, these need to be identified separately to enable the calculation of demand and charges. Catchments can be determined by checking the maps in Schedule C: Service Catchments or by checking PD Online. Determine the applicable service catchment/charge area and the land use and area which falls within each catchment/charge area. Calculations will be required for each land use in each service catchment/charge area under each network.

Capping of Charges Minute page 09/1816 specifies that caps are to apply to infrastructure contributions paid to Council from 1 July 2009 for all three districts. The capping scheme applies to Residential development only. The current capping rates are as follows: -Pine Rivers:Res Lots $29,455 and Units $23,564 -Caboolture:Res Lots $25,000 and Units $20,000 -Redcliffe:Res Lots $20,000 and Units $16,000 The Administration Policy for all three districts contains the Capping Methodology in Section 5.7.

Applying Capping For each additional Lot created pursuant to a development approval for RAL -The capped amount is the net number of lots x $Cap. For each new dwelling unit or community title lot created pursuant to a development approval for either a MCU or RAL -The capped amount is the total number of units x $Cap. Capping & Credits: Where capping and credits apply to a development, the order of calculation is as follows: -Determine Proposed Demand -Subtract Existing Demand -Subtract applicable Credits -Apply the capping amount to the development as above. -The above depends on the terms of the Infrastructure Agreement.

Trunk Infrastructure - Credits To determine if there is any trunk infrastructure identified within your development, peruse the maps in Schedule D – Network Asset Maps of the policies. Does the asset match your intended infrastructure? -If so, go to Table 4 to identify total expenditure allowed for that project. -If it does not match, discussions will be required with Development Services during the application process. To determine the number of demand unit credits, divide the total expenditure allowed for the project by the charge rate for the relevant catchment.

Applying & Recording Credits Application of Credits will be determined via an Infrastructure Agreement. Infrastructure Credits are to be expressed in Equivalent Demand Units for each network – NOT in monetary terms. Credits will be maintained in the Infrastructure Charges Register and allocated to the relevant networks of the application as the development progresses. Refer to Section 6.6 of the Administration Policy for full details.

Fee Estimation Tool Council is currently developing a tool for the estimation of contributions to be available to the public. This is currently in system testing and should be available shortly. It will be located on Council’s internet site under ‘Development – Infrastructure Contributions’. The following are screen shots from the Fee Estimation Tool.

(Continues on from image on left)

Coming next week

Contacts Strategic Infrastructure Planning Manager:Julia Bischof Coordinator:Kay McLachlan-Murphy Network Planner:Elissa McConaghy Project Officer:Luke Ritchie Infrastructure Charges Registrar:Val Weber Payment Request: Dept