TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.

Slides:



Advertisements
Similar presentations
ITER Port-Plug Engineering
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
© 2003 Swagelok Company MPC Series Modular Platform Components.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 Budapest University of Technology and Economics Participant Profile Department of Applied Mechanics Department of Manufacturing Science and Technology.
Ottó Bede TBM Consortium Meeting, Brasimone WP5 - FEM analyses ITER PPE training session 7 December – 11 December 2009, Cadarache, France.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Work Cell Design and Control
Ottó Bede TBM Consortium Meeting, Brasimone ITER PPE Goal Oriented training program RST meeting 17th January 2011, Cadarache, France József.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Special assignment, OFES, USA 1 ITER, Cadarache, January 26, 2007 Clement Wong, General Atomics, USA Valery Chuyanov, Chang Shuk Kim, at this time the.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
IMPACT OF FRAME DESIGN AND FRAME REPLACEMENT PROCEDURE ON DCLL TBM By Mo Dagher Presented by Clement Wong TBWG-16 meeting, November, 15-17, 2005, Beijing,
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Page 1 HFP Workshop, RAMI Session, 2-4 Mar 2009k,UCLA Why Is Reliability, Availability, Maintainability, and Inspectability Important to the Future of.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Remote Maintenance for Large Scale Physics Experiments Alan Rolfe 13 th April 2010.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Lecture and laboratory No. 10 Modeling product as system Óbuda University John von Neumann Faculty of Informatics Institute of Applied Mathematics Master.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Segmentation of internal components and impact on maintenance for DEMO
Update on PANDA solenoid design
LBNF CAD models, Drawings and Component list
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Produktentwicklung und Maschinenelemente
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
List of changes and improvements for the next generation CLIC module
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
Challenges and Deadlines for Production
Presentation transcript:

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering - Maintainability associated to ITER Component Lifecycle - Tutor : Jen-Pierre MARTINS EFDA ITER - Goal Oriented Training Program Port Plug Engineering - Maintainability associated to ITER Component Lifecycle - Tutor : Jen-Pierre MARTINS EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 2 06 December 2009  Objectives of my program  Short presentation of an Eq port plug  Kinematic & FE Analysis on the Transfer Cask System with Samtech  Maintenance of the TBM with HAS EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 3 06 December 2009  Objectives Background Cause = nuclear fusion reactions for long term  high magnetic fields  produces high energy neutron  generates very high temperatures Consequence = maintenance in nuclear environment  make first wall components highly constrained and causes its wear  many parts of this region must be replaced or refurbished during the reactor’s life  maintenance of a reactor in exploitation is a critical point, because it directly affects the availability of the machine and its economical productivity Program motivations  Even if the goal of ITER is not to be an industrial reactor, it is essential to consider its maintainability for at least two major reasons:  To have powerful available experimental equipment  To demonstrate that the maintenance by remote handling is possible for the further steps (DEMO)  Because remote handling is one of the most important technical issues of the whole project EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 4 06 December 2009 Dimension : 3.5m x 2.2m x 1.7m Weight : 45t First Wall Component (= high activation)  Equatorial Port Plug EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 5 06 December 2009  Kinematic & FE Analysis on the Transfer Cask System with Samtech Collaboration with SAMTECH :  Collection of input data  Definition of the analysis methodology and study cases  Setup and delivery of the CATIA V5 configuration models for the study  Idealization of the CAD geometry, in order to have a model that will be more oriented to computation  Delivery of the specifications the simulation activity EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 6 06 December 2009  Transfer Cask System (TCS) : Ports dedicated maintenance platform. It has to carry the first wall component to the Hot Cells (nuclear maintenance room). Envelope : it docks to the port and provide the confinment. Pallet : it permits to align the envelope with the port. Air cushion : it moves the all system inside the building. EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 7 06 December 2009  Initial models Transferred by the DET Environment + current TCS model roughly positioned Last studies results were also implemented EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 8 06 December 2009  Geometry preparation Simplification, replacement or creation of 3D entities Methodology for transfers from CATIA to inside SAMCEF operational Cask envelope Pallet system Building VV Port Rails CAS End-effector Tractor Port plug EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 9 06 December 2009  Geometry preparation Positions checking and corrections PLUG flange bolting face center TCS front face art floor level TCS CONTAINER Horizontal floor plane TCS PALLET / CONTAINER Horizontal interface plane EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Boundary conditions Localization of surfaces for forces reactions on the structure Identification of the surfaces in contact EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Loading conditions Postion and value for the center of gravity of the main objects to take into account Rear rescue door center of gravity Closed double door center of gravity Mover center of gravity Opened double door center of gravity Port plug center of gravity EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Kinematics 3D elements for mechanisms simulation TCS skeleton for main elements positions and interfaces ALL DOCKED EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Kinematics Diagram of the mechanical links between the different subsystems EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Conclusion Geometry is fixed Boundary and loading conditions are defined Kinematics preparation is fully operational in CATIA The report finalizing the 80% of the CEA contribution is about to be officially delivered to SAMTECH EFDA Goal Oriented Training Program Port Plug Engineering

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  TBS Layout Main technical components of the TBM system  TBMs ( 2 vertical modules per equatorial port plug)  Plug frame, ultra high vacuum sealing, mechanical attachment and cooling pipes (IF2a)  Manifold set for TBM feeding (Pipe forest)  Bioshield  Ancilary Equipment Unit (AEU) : PbLi-loop, measurement equipment, valves, tanks, …  Tritium plant dedicated area Main components of the installed TBM system in port cell (EU current study) Port Duct Port Extension Port Cell Bioshield Port Cell Door Vacuum Vessel AEU IF1IF2aIF2bIF3 Tritium plant equipment + VV Port Cell T Plant VVPort Cell T Plant TBM -TG04 Kick off Meeting Task 19 : Design and development plan of the port cell dis-/assembly RH system

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Maintenance conditions hypothesis for the current study Interface 2a is accessible even if AEU is connected => robot carriage must be installed in AEU structure A maintenance corridor is available on the side to allow human / machine access to the interfaces The bio-shield contains a dedicated maintenance door to give access to the pipe forest The cutting task is considered prior to the welding operation, because this is the most critical operation in terms of exposure TBM -TG04 Kick off Meeting Task 19 : Design and development plan of the port cell dis-/assembly RH system

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Pipe Forest preliminary design Pipe forest integration taking into account maintenance access (man / robot) Pipes insulation thickness = 100mm TBM -TG04 Kick off Meeting Task 19 : Design and development plan of the port cell dis-/assembly RH system

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Robotic simulations first results Industrial arm mounted on a commercial based elements 4 dofs platform designed by HAS After some modifications on the pipes and robotic tool design, first preliminary result have not revealed any killing issue TBM -TG04 Kick off Meeting Task 19 : Design and development plan of the port cell dis-/assembly RH system

TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ December 2009  Remaining work and outlook First test with one dexterous industrial robot arm have been performed for cutting accessibility A more realistic cutting tool coming from HAS work is about to be integrated in order to replace the current simplified shape The remote removal of the insulation “half-shells” is about to start Other industrial robotic arms will be implemented in order to check the feasibility with different kind of robot providers. This is in order to avoid any exclusive robotic arm architecture and provider. An important handling equipment is required to transport the pipe forest during maintenance operations. A first assessment of this tool is starting. A preliminary design of the bio-shield will specify it’s main interfaces TBM -TG04 Kick off Meeting Task 19 : Design and development plan of the port cell dis-/assembly RH system