Meg Thornton/IMPC-FWA-PWE/(907) 11/04/2008 UNCLASSIFIED 1 OF 18 Army Cost Analysis for Stabilization and Demolition of.

Slides:



Advertisements
Similar presentations
Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Background Presenters Work done in preparation for WHS changes
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
AT/FP Challenges in Renovation of Existing Military Facilities Presented by: David Dickey, PE.
BRC Storage & Distribution Safety and Quality Management System Training Guide
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Presented by Edgar Furtado & David Vella FIREPLACE & FLUE REPLACEMENTS 1359 WHITE OAKS BLVD., OAKVILLE.
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
W504 - Management of asbestos containing materials.
Appendices Subpart R Steel Erection
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Louisiana Department of Environmental Quality Jodi G. Miller, CHMM, CPM May 9, 2007 New Orleans/Gulf Coast Challenges and Outcomes.
Long Range Facility Planning assisted by Silver Falls School District.
Introduction to Construction General Permit Inspections.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Master Policy and Unit Owner Policy June 11, 2015 Insurance.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
SUN CITY HILTON HEAD COMMUNITY ASSOCIATION, INC. PURRYSBURG POOL UPDATE.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Property Schedules Demographic Information
+ Facilities and Security Updates December Security Security systems for ES and MS/HS We have had walkthroughs and quotes from 3 potential vendors.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Understanding the FHA 203K STREAMLINE AfterBefore.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
Brownfield Site Visits An Assessment of Safety and Health Hazards Johanna Hollingsworth, MPH HCI-ATL, LLC. Germantown, MD May 7, 2008.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
South Tyneside Homes The Decent Homes Programme January 2007.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Infrastructure Revitalization Project
Cuba-Rushford CSD Capital Project
Construction Planning
Asset Planning & Optimization Capital Renewal Strategies
Saxe Middle School Renovation
Environmental Cleanup Program Status
Major Steps In Building a SFR
Most Frequently Cited Serious Violations
Goodyear Napanee Contractor Safety
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Northwood Lakes Condo Association
How & When to Get Permits for Work in Your Home
The Asset Management Journey for Building Assets
House Construction Budget Plan
Post-earthquake Building Usability Assessment:
Asbestos: Identification and Training
TPDES Construction General Permit Compliance
Understanding the Replacement Reserve
Community Practice Asset Management.
Presentation transcript:

Meg Thornton/IMPC-FWA-PWE/(907) 11/04/2008 UNCLASSIFIED 1 OF 18 Army Cost Analysis for Stabilization and Demolition of Select Buildings at Site Summit 12 Nov 2008 Directorate of Public Works

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Cost Analysis Army cost analysis includes the following properties: –Battery building –3 Clamshells –3 sentry stations –Launch control building –Vehicle maintenance and repair –Missile maintenance facility –2 electrical substations –Dog kennel 2 OF 18 Properties not analyzed in Army cost analysis: –Missile launch and storage facility 1 and 2 –Road, helicopter pad and vehicle garage foundation –HIPAR building and foundation –Magazines (high explosive, guided missile, missile warhead and fuse and detonator –B and C Electrical Substations

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Demolition For this cost analysis ‘demolition’ includes the following costs: – The safe removal of hazardous materials (such as lead paint and asbestos containing material) that have been identified or safely assumed to exist in specific buildings –The removal of demolished materials from the site and the deposition of materials in the required location (land fill or suitable haz mat cell as approved by the EPA) –The expected costs, risk insurance, contractors fees, permits, dumpsters, equipment, contractors, and all necessary time required for the required removal of material and demolition of complicated buildings 3 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Stabilization For this cost analysis ‘stabilization’ includes the following costs: –The above costs that would be associated with the abatement and removal and disposal of hazardous materials. –This analysis includes the method of stabilization as recommended by the NPS in their report and when options were provided the simplest method was chosen. Simply put buildings were stabilized by being weather-proofed simple roofs were applied when necessary and windows and doors were sealed to prevent access by trespassers and weather. The most cost effective solutions were sought. 4 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Costs Included in Figures: General contractors fees Subcontractors fees Permit fees Performance bonds Workmans Comp insurance Builders risk insurance Overhead Equipment fees Site work fees (dumpsters and removal, haz mat equipment, sampling equipment, qualified personnel) Framing and scaffolding necessary to access all facilities 5 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Battery Building Demolition* 3-story wood portion only –$627,223 Entire structure including concrete portion –$765,322 Stabilization* 3-story wood portion only –$1,428,828 Entire structure including concrete portion –$1,671,443 Annual Maintenance Cost –$48,523 6 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Clamshell Radar Demolition* $64,557 per clamshell Removes clamshell except for foundation Stabilization* $63,030 per clamshell Retains entire structure, removes sheathing and insulation from outside Annual maintenance cost –$485 per clamshell 7 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Launch Control Building Demolition* $263,019 Removes entire structure, retains foundation Stabilization* $407,100 Replaces roof, interior structural components, outer sheathing Annual maintenance cost –$15,700 8 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Vehicle Maintenance and Storage Facility Demolition* $144,292 Removes entire structure, retains concrete foundation Stabilization* $244,723 Replaces interior framing, roof and outer sheathing Annual maintenance cost –$10,010 9 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Missile Maintenance Facility Demolition* $68,859 Retains concrete and metal framing, removes roof, wood framing and outer sheathing Stabilization* $116,752 Replaces roof, outer sheathing Annual maintenance cost –$5, OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Electrical Substations Demolition* D1 and D2 –$102,236 each Removal of Sheetmetal Metal Frame to remain Intermittent examination of bolts, with replacement as necessary Stabilization* D1 and D2 –$152,236 each Annual maintenance cost –$5,000 Repair sheetmetal and roof Seal door to prevent entry 11 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Sentry Station 1 (39219) Demolition* $6,183 Includes removal of everything except foundation Stabilization* $8,302 Annual maintenance cost –$502 Replace roof Cover windows and door with plywood to prevent unauthorized entry 12 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Sentry Station 2 (39221) Demolition* $12, Includes removal of everything except foundation Stabilization* $13, Annual Maintenance Cost –$672 Replace roof Cover windows and door with plywood to prevent unauthorized entry 13 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Sentry Station 3 (39231) Demolition* $14,385 Includes removal of everything except foundation Stabilization* $17,431 Annual maintenance cost –$869 Replace roof Cover windows and door with plywood to prevent unauthorized entry 14 OF 18 *Includes cost of abatement

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) From AAHP Recommend if costs of stabilization exceed cost of demo that building is left ‘as is’ until funds become available. Recommend minimal protection/stabilization which would include sealing the building in plywood and weatherproofing the roof until such time as private or other funds become available. If demo is the only option consideration should be given among future partnering opportunities and possibilities to allow for a future interpretive option which could include a concept such as outlining of the building mass in tubular weathering steel. 15 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) FONSS Pleased and concurs with NPS EXCEPT: –They don’t feel the Launch control building could be stabilized inexpensively and feels the cost analysis needs to address the three different components of the building. –A full EPA and OSHA compliance analysis should be conducted and the cost analysis should be updated as necessary prior to any demolition. –They encourage USAG AK to pursue securing the concrete wing and re-roofing as soon as possible. –Recommend cost comparisons prior to any action being undertaken. –These reports are all based on visual assessments a hazardous materials survey must be completed prior to demo or stabilization and update costs as necessary. 16 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) SHPO and ASLA SHPO Recommend partial retention of the Launch control building be considered. This document provides a basis for continued consultation. ASLA Pursue additional funds for stabilization of Battery Building due to the visual impact demo would cause. 17 OF 18

11/04/2008 UNCLASSIFIED Meg Thornton/IMPC-FWA-PWE/(907) Recommendation Retain All 3 Clamshells Battery Building –retain concrete wing and foundation Metal Frames of Electrical Substations –remove sheet metal siding and roof Missile Maintenance Facility –retain foundation and lower concrete walls –remove siding, upper wood framing and roof Document and Demolish Launch Control Facility –retain concrete foundation Vehicle Maintenance Facility –retain concrete foundation Dog Kennel –retain concrete foundation and footprint Battery Building –retain foundation –exterior stairwells –preserve interior wall art for future interpretation Sentry Stations –Retain concrete foundation 18 OF 18