1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Engineering Approaches to Reducing Floor Vibration at the APS and CNM Presented by John Sidarous, Ph.D., S.E., P.E. For the NSLS-II Beam Stability Workshop.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
1 BROOKHAVEN SCIENCE ASSOCIATES Nanopositioning R&D Plan Yong Chu Experimental Facilities Division, NSLS-II Experimental Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Thomas F. Joos, P.E. Civil/Structural Engineer BNL Plant Engineering Division May 8, 2007 NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Chris Channing P.E. Sr Project Engineer NSLS-II Conventional Facilities - Thermal Stability May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
2009/6/25Amaldi 8 in NewYork City1 Thermal-noise-limited underground interferometer CLIO Kazuhiro Agatsuma and CLIO Collaborators Institute for Cosmic.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II ASAC Meeting April 23, 2007 S. Krinsky.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Concepts and Requirements for GIMM Structures
4th Annual Construction Law Summit
Summary of Session 5 Other Vibration Source
Physics Requirements for Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop April 18, 2007

2 BROOKHAVEN SCIENCE ASSOCIATES Stability Dependent on Conventional Facilities Stability goals driven by conventional facility design Stability of storage ring tunnel floor Vibration < 25 nm PSD from 4-50hz Stability of experimental floor Vibration level of < 25 nm PSD from 4-50hz for general floor area Vibration level for 1 nm resolution beam lines requires further definition but appears achievable with proper correlation Thermal stability of storage ring tunnel environment +/- 0.1 o C for 1 hour time constant Thermal stability of experimental floor +/- 0.5 o C for 1 hour time constant

3 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview Access Tunnel LOB (1 of 5) JPSI NSLS CFN BLOC NSLS II Service Bldgs (1 of 5)

4 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d NSLS II Floor Plan 1. BLOC – Booster/LINAC/ Operations Center 2. LOB – Lab Office Buildings (3 base scope up to 5 future) 3. Service Buildings (5) 4. RF Area 5. Tunnel Area 6. Electrical Mezzanine 7. Experimental Floor 8. Access Corridor

5 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d Access Corridor Lab-Office Bldg SR Tunnel Experimental Floor Service Bldg 1 st Floor (earlier concept) Electrical Mezzanine (above tunnel)

6 BROOKHAVEN SCIENCE ASSOCIATES CF Program for Vibration Management Assessment of “ green-field ” conditions Studies by Colin-Gordon Associates & N. Simos On-going monitoring program Identification and mitigation of cultural sources (where feasible) FE Modeling of site and facility design Needed to understand & predict facility response Design optimization tool Analysis of other facilities (CFN, APS & SPring 8 thus far) Draw upon lessons learned Provide input for model Model performance verification During & after construction, implement monitoring and maintenance program

7 BROOKHAVEN SCIENCE ASSOCIATES Specific Vibration Mitigation Strategies “ Monolithic ” slab for accelerator and experimental floor Slab thicknesses based on vibration modeling results Possible use of polymer admixtures and concrete layering for enhanced damping characteristics (access corridor & service bldgs) Isolation of bldg structure, access corridor and mechanical spaces from tunnel and experimental floor slab Inertia bases and isolation of piping, ducts and machinery from tunnel and experimental floor slabs Low flow velocity design for ducts and piping Specification and commissioning of equipment and systems to include precision alignment, balancing & vibration measurement Orientation of service bldgs to maximize distance of machinery sources from tunnel and experimental floor slabs

8 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Section Ratchet or Shield Wall Electrical Mezzanine Bldg structure Isolated from tunnel and experimental Floor Earth Shield Berm Experimental Floor Access Corridor Tunnel Floor “ Monolithic Joint ” Isolation Joint Isolation Joint or Void Space Tunnel Roof Isolated Pier for Column Isolated Grade Beam

9 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Design - Ring Building Section Non-vibrating Equipment Need to assure that vibration mitigation measures are carried out at Ring building interfaces with other structures and where systems enter building or tunnel Section at Lab Office Building and Service Building Rotating Machinery Distance determined by modeling & empirical analysis

10 BROOKHAVEN SCIENCE ASSOCIATES Vibration Studies Studies of NSLS II “ green field ” conditions indicate an existing cultural vibration level of ~20 nm Does not factor in reduction due to expected filtering effect of slab Does not factor in cultural vibration reductions that can be achieved Does not factor in addition from self-inflicted sources Additional modeling and analysis is on-going to predict the value of these factors to arrive at an expected value for NSLS II N. Simos will present in-depth discussion of modeling analysis and initial results in breakout session

11 BROOKHAVEN SCIENCE ASSOCIATES Service Bldg Results Concern about location of rotating machinery in service buildings near tunnel when positioned on infield side of Ring Bldg Initial results show contribution from service bldg is minor (0.4nm) if source is properly isolated and located ~30 ft from tunnel Additional mitigation can be applied to reduce energy transfer to ground beneath service building and reduce contribution even further Conclusion – service building, and associated economy for utility routing, in infield appears workable 30 ft

12 BROOKHAVEN SCIENCE ASSOCIATES Temperature Stability Key temperature stability requirement is tunnel +/- 0.1C (+ /-.18 F) at any given location over 1 hour Key parameter is temperature stability and repeatability vs. absolute accuracy. This level of stability has been achieved at other facilities and BNL has achieved even better stability in microscopy lab applications The relatively steady state heat load and the high thermal mass of the tunnel make this quite achievable Thermal modeling will be performed to confirm concepts and optimize system design

13 BROOKHAVEN SCIENCE ASSOCIATES CF Beam Stability Path Forward Continue vibration study and modeling to provide added assurance that design will yield desired performance Assess impacts of proposed NSLS II design choices and equipment on vibration environment Optimize vibration resistant design vs the quantity of concrete & steel in the tunnel and experimental floor slabs to contain costs Identify local sources of vibration from on-site/off-site operating facilities to enable remediation (i.e. repair roads, balance machinery etc.) and optimize operating environment for NSLS II Continue collaboration with other facilities to understand vibration performance and verify model accuracy Perform thermal modeling to confirm stability goals can be achieved