Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.

Slides:



Advertisements
Similar presentations
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Advertisements

Parts of typical slab formwork
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Class Day Thirteen. Chapter 9 Stone & Concrete Masonry.
The layer of the Earth that is beneath the LITHOSPHERE is the ASTHENOSPHERE! The Asthenosphere is also known as the upper part of the Mantle! It is.
1) Sort objects into the correct groups Sort objects into the correct groups 2) Properties of solidsProperties of solids 3) Properties of liquidsProperties.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Wall Form Design Example (Continued)
Adhesives and fasteners. Notes on adhesives The “best” when they work correctly; “worst” when they fail Determine the right adhesive for the job Prepare.
Concrete
Cut off the top off an aluminum can. Exploration Warning: Be very careful not to cut yourself on the sharp edges of the can.
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Foundation Systems.
Construction Cost Estimating Class #7 - Masonry Prof. Ralph V. Locurcio, PE.
BEARING OR CRUSHING Bearing Stresses (Compression Perpendicular to the Grain) Allowable stresses for compression perpendicular to the grain are available.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Kinetic Theory The kinetic theory is an explanation of how particles in matter behave.
Chapter 18 Foundations.
Building Foundations Foundation Walls.
CONSTRUCTING A FIVE CABIN LATRINE
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
TABS II Installation Presentation. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Installation Presentation
Critical Thinking in Engineering Process
INTRODUCTION Definition:
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
1 Presented by the Wood Truss Council of America.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
Wood Construction CTC-375.
Identify the three basic phases of matter What are the 3 primary phases of matter? Solid, liquid, gas What is the fourth phase? Plasma?
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
Properties, Handling and Mixing of Particulate Solids By Sidra Jabeen Department of Chemical Engineering, University of Engineering & Technology Lahore.
Analyses of Bolted Joint for Bolt Preload and Shear Load
Stuff that Flows L12- FLUIDS-1 liquids gases
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
Mechanical Tests on Structure Mechanical Tests are being started using real extrusions. Purpose of the tests are to evaluate the accuracy and validity.
L12 - FLUIDS-1 FLUIDS – liquids – gases sand, snow, or grain (granular materials) While kernels of corn are solid, they behave more like a liquid when.
Fork and Pallet Design Hans Jostlein March 13, 2007.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
House Construction.
ADHESIVES. TWO MAIN INGREDIENTS – RESIN – GLUE SOLID SOLVENT – KEEPS LIQUIFIED UNTIL APPLIED.
States of Matter and Mixtures and Solutions Carl Wozniak Northern Michigan University.
Building from Templates. The Concept First things first: In the beginning was the idea. For example, “I need a coffee table, something unique but functional.”
Epoxy for Microboone Cradle Attachment The Microboone detector tank will be supported by two cradles, made from dense poly-urethane (PU) foam. The cradles.
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
Floor System Sizes and Materials
Warm Vessel Leveling Islands (Piers)
THE SCIENCE OF SOLVENT WELDING
F I L T R A T I O N SCHOONOVER, INC..
Footing and Foundation:
Composites.
Composites.
Presented By: Frank Gonzales, CEES, CEAS
Stuff that Flows L12- FLUIDS-1 liquids gases
Far Detector Activities Late 2017 – Early 2018
Competency: Draw wall sections and details.
Stuff that Flows L12- FLUIDS-1 liquids gases
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
Building Good Boxes ACPA Spring Short Course School
PUNJAB TIANJIN UNIVERSITY OF TECHONOLGY, LAHORE,PAKISTAN TOPIC :  Mud Mortar  Special selection of mortar  Steel.
Information related to Chapter 7 in the textbook
Guide to Epoxy Injection Crack Repair
Presentation transcript:

Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not uniform: 11/3/2009Grout test Proposal Hans Jostlein1

Floor pressure It is actually more complicated; there is partial force transmission through the webs, Except for the middle channel in the end cap. 11/3/2009Grout test Proposal Hans Jostlein2

Two locations for grout: Between the block and the pallet (applies to IPND as well) Between the pallet and the hall floor (Applies to far detector only) 11/3/2009Grout test Proposal Hans Jostlein3

Why do we need grout ? The PVC block is stiff We always assumed a full support area There are several sources of imperfect alignment of the block components versus the pallet- or floor shape: 11/3/2009Grout test Proposal Hans Jostlein4

Geometrical Imperfections Non-square module bottoms (X and Y) Module bottoms misaligned (X and Y) Pallet construction tolerances Concrete floor not a perfect plane Cumulative error: Somewhere between 1/16” and 1/8” (my own wild guess) 11/3/2009Grout test Proposal Hans Jostlein5

Grout Requirements Long Life (no deterioration with time or oil soaking) No Creep (to avoid stresses during partial oil filling) Stiff (same reason) Easy to install Must flow easily Reasonably fast setup 11/3/2009Grout test Proposal Hans Jostlein6

Liquid grouts Commonly used for machinery Require leak-tight form Not easily used on far detector floor Costly 11/3/2009Grout test Proposal Hans Jostlein7

Cement based grouts See DocDB # 581 (January 2006) for measurements Last for decades (centuries ?) Do not require leak tight forms Have the marvelous property of being Tixotropic: Behave like liquids when shaken or stirred (Sorry, James B.-007) Behave like solids when at rest 11/3/2009Grout test Proposal Hans Jostlein8

Typical mix Use “play-sand” as filler Add cement and water and mix Fill into the gap “vibrate” with a long board until settled Let set (setting can be as short as 30 minutes, and can be tuned with additive to be as long as 3 days) 11/3/2009Grout test Proposal Hans Jostlein9

Test assembly 11/3/2009Grout test Proposal Hans Jostlein10

Proposed size of test One extrusion wide (26 “ or so) 1 foot deep 5 double-layers tall (52 inches) Install fake bottom seals (PVC, 3” x 26” x ½”) Glue stack together using existing Magnolia epoxy Install plywood wall (3/4” thick ?) with gap spacer (¾” to start) 11/3/2009Grout test Proposal Hans Jostlein11

Main purpose of test Find out how hard or easy it is to fill the mortar in a tall gap with realistic block shape Check on resulting completeness and distribution of fill (We’ll cover the extrusions with foil to separate the mortar from the extrusions after cure) 11/3/2009Grout test Proposal Hans Jostlein12

Effort Cut extrusions – 4 hours Epoxy end plates – 8 hours Epoxy stack together – 8 hours Make wooden cage –8 hours Make a funnel– 2 hours Mix mortar and install – 4 hours 11/3/2009Grout test Proposal Hans Jostlein13

Materials (Bad) Extrusions from Meson – free Mortar mixing drum $ 50.- Sand, cement $ 35.- Form assembly bolts etc $ /3/2009Grout test Proposal Hans Jostlein14

Time scale Depends on my time and some tech help (move extrusions; saw cuts) Would aim for less than a month 11/3/2009Grout test Proposal Hans Jostlein15

Test Program Everything may work right away—great If not, tinker some more In any case, try different grout gaps 11/3/2009Grout test Proposal Hans Jostlein16

Floor Grouting (Far Detector only) Place mortar on floor over the whole contact area Use a rake-type tool to groove it deeply Set the block down with the block raiser During block alignment there is enough motion to re-liquefy the grout If not, just make a very small motion with the block raiser and set the block down Grout will set to full load bearing strength as soon as the motion stops 11/3/2009Grout test Proposal Hans Jostlein17

Floor Grout test We can test this by grouting a concrete block to the floor in Lab 6 Cover floor and top of mortar with a PE sheet for easy clean-up This test costs very little time and materials. We should do it. 11/3/2009Grout test Proposal Hans Jostlein18

Future use Use on at least one module of INPD Use for FHEP (to test floor grouting, mostly) 11/3/2009Grout test Proposal Hans Jostlein19