Dr. Stefanie Neveling Bundesnetzagentur (Federal Network Agency), Head of Section „Access to Gas Transmission Networks and International Gas Trading” Problems.

Slides:



Advertisements
Similar presentations
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Advertisements

THE CHALLENGE OF GLOBALIZED NATURAL GAS MARKETS THE NATURAL GAS MARKET IN EUROPE 15 MAY 2012 Presented by: RAUL YUNTA HUETE HYDROCARBONS DIRECTOR COMISIÓN.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
Zone Merger – learning from experience and developing an evidential based approach Target Model Workshop 3, London 11 April 2011 Nigel Sisman Senior Adviser.
Recent Regulatory Developments in the gas market of the Energy Community Dr. Michael Thomadakis Vice President, RAE Chairman of the Gas Working Group,
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Gas Regional Initiative North West Region - Gas Target Model - BNetzA/Ofgem Pre-Comitology Meeting Bonn – 26 May 2011.
10 th SG Meeting, GRI SSE Milano, 5 May 2011 GRI South South-East Region.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
4 th SAP Meeting, GRI SSE Milano, 4 May 2011 GRI South South-East Region.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Energy Greece: hub for energy independence of Europe? Georgette Lalis Task Force for Greece – Head of the Athens office.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
European Federation of Energy Traders GIE annual conference 2008 Bukarest, October Needs of the market participants with respect to creating an integrated.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
European Federation of Energy Traders 1 Brussels, 22 September 2009 Implementing the 3 rd EU Energy package Colin Lyle, EFET Gas Committee Chairman
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
INFRASTRUCTURE USERS: WHAT DO THEY NEED Steinar Solheim, Vice President, Yara International.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Lecture III: Energy Security of V4 What is Visegrad 4? Energy cooperation of V4 V4 as a litmus test for Internal.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
GIE views on Gas Target Model - focus on storage - Jean-Marc Leroy GSE President / GIE Board Member CEER - 3rd Gas Target Model workshop London, 11.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Background and Process
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
29th April 2014 Teleconference
Walter Boltz Chairman, CEER Gas Working Group
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Presentation transcript:

Dr. Stefanie Neveling Bundesnetzagentur (Federal Network Agency), Head of Section „Access to Gas Transmission Networks and International Gas Trading” Problems in the European gas market and high level overview of options Gas Target Model Workshop London, 11 April 2011

2GTM Workshop in London, 11 April 2011 Introduction The Target Model (Madrid Conclusions) should: provide support for FG and NC development to reach 2014 goal for completing the internal market guidance also for Commission´s guidelines and Regional Initiative / Int. Projects Internal market means: real choice, more cross-border trade, competitive prices… provide an outlook on the EU gas market beyond that date  Starting Point is problems the gas market faces

3GTM Workshop in London, 11 April 2011 Setting the scene ? Challenges: Internal market by 2014  Competition EU , integration of RES  more CCGT’s?  Power to Gas? Security of Supply  N-1, Reverse Flow, access to diff. supply sources  less domestic gas production  more transit, new investment LNG

4GTM Workshop in London, 11 April 2011 Problem Identification 3 rd Package makes Entry-Exit systems obligatory: Large Entry-Exit Systems may reduce firm capacity Internal congestion may lead to cross-subsidisation Small Entry-Exit systems are not market capable problem of “pan-caking” for long-distance transport For gas to flow where it is needed (price signal) there needs to be available capacity Contractual Congestion identified as a major problem, but not for all IPs Recital 21: “There is substantial contractual congestion in the gas networks.” Definition: "contractual congestion" means a situation where the level of firm capacity demand exceeds the technical capacity, Art. 2(21) Reg. 715/2009 Commission proposal on Congestion Management

5GTM Workshop in London, 11 April 2011 Contractual Congestion

6GTM Workshop in London, 11 April 2011 Status of market integration in the NW region Significant indigenous gas production, but increasingly import dependent Decoupled entry-exit zones implemented in almost every country NBP most liquid hub (churn rate:14-15), Zeebrugge (4-6), TTF (3-4), NCG (2-3) Gaspool (2-2,5), PEG Nord (1,5), trading volumes increasing Increasing price convergence but still price differences Significant infrastructure investments of European dimension (e.g. Northstream) Source: European Commission

7GTM Workshop in London, 11 April 2011 Status of market integration in the South-South East region Characteristics: Large transit flows Several small markets, i.e. domestic consumption between 8 and 15 bcm/a (except for Poland and Italy) High dependency on Russian imports Out of 10 MS in SSE, only 3 markets with reasonable transparency on wholesale market prices Only in some MS Entry-Exit System/VPs Problems: High market concentration (wholesale and retail) No liquid wholesale markets, few VPs Low or no competition in retail markets Poor West-East (reverse flow) capability Poor North-South interconnections

8GTM Workshop in London, 11 April 2011 Status of market integration in the South region TFC: 4,2 bcm C: 95% - U: 51% TFC: 3,3 bcm C: 2% - U: 2% TFC: 0,3 bcm C: 10% - U: 9% TFC: 0,1 bcm C: 0% - U: 0% Data: February Source ENAGAS-TIGF-REN. TFC (Total firm Capacity) – C (contracted) – U (used) TFC: 0,15 bcm C: 80% - U: 52% TFC: 3,1 bcm C: 92%- U: 59% TFC: 0,9 bcm C: 100%- U: 58% Region Characteristics: SGRI Demand 2010: France 52 bcm Spain 34,5 bcm - Portugal 4,3 bcm Highest European share of LNG supplies Satisfactory interconnection levels. Available firm capacity, particularly in LNG terminals. Absence of relevant congestions Security of Supply: Diversified supply origins Relevant aspects/problems for GTM: Coordinated bundled capacity allocation F- S. TSOs proposal for coordinating capacity allocation between P-S Independent Balancing zones: France (3 zones), Portugal (1), Spain (1) Existing Organised Markets in France. An organised market to be established soon in Spain. Market coupling: currently an alternative not equally achievable for all countries

9GTM Workshop in London, 11 April 2011 Overview of high level options Improve effectiveness by realising economic pipeline investments MECOS Model Pillar 1: Enable functioning wholesale markets Establish Entry- Exit Zones (Market Areas) Merge Market Areas (national or cross-border) Establish Trading Region Pillar 2: Tightly connect markets Explicit auctions (Day-ahead) Implicit auctions/allocation Make available capacity for connection (UIOLI/Overbooking) Pillar 3: Enable secure supply patterns Long term capacity auctions SoS Investments

10GTM Workshop in London, 11 April 2011 Overview of high level options Source: LECG LECG Focus on:

11GTM Workshop in London, 11 April 2011 Overview of high level options Enable Markets: Connecting markets: Market areas (sub-) national or cross-border Full vertical integration Merging of market areas Taking physical connection into account Trading region Merger of entry-exit systems Taking physical connection into account Seperate end-user zones with national balancing system Bundling of capacity Harmonisation of products, Gas-day Explicit Auctions Make capacity available via UIOLI and/or Overbooking Market coupling Day-ahead implicit auctions/allocation as possible element to be tested in pilots first LECG + MECOS only MECOS LECG + MECOS MECOS & LECG

12GTM Workshop in London, 11 April 2011 Conclusions Different degrees of development; lack of Entry-Exit Systems, liquid hubs, functioning national markets GTM needs to fit everywhere Options in Target Model necessary; North-West region most developed, hub-prices converging Problems of contractual congestion and no perfect price alignment Need to make spare capacity available; MECOS & LECG contain nearly same set of options: suitable framework for Target Model

13GTM Workshop in London, 11 April 2011 Thank you for your attention!

14GTM Workshop in London, 11 April 2011 Back-up Source: Gas Matters, February 2011