IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented.

Slides:



Advertisements
Similar presentations
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Front End Process July 18, 2001 San Francisco, CA.
Advertisements

2009 Litho ITRS Spring Meeting
MRAM Roadmap Proposal v We propose two categories of FAST MRAM and HIGH DENSITY MRAM. · The 1st FAST MRAM introduction of 256Mb should.
November 29, 2001 Santa Clara , CA
ITRS Winter Conference 2006 The Ambassador Hotel Hsin Chu Taiwan 1 ITRS IRC/ITWG Meetings HsinChu December 4, 2006 UPDATED Linda Wilson
Work in Progress --- Not for Publication p. 1--PIDS Summary, Dec.04 PIDS Summary Peter M. Zeitzoff US Chair ITWG Meeting Tokyo, Japan November 30 - December.
DRAFT - NOT FOR PUBLICATION 16 July 2003 – ITRS Public Conference Lithography Update ITRS Meeting San Francisco, CA July
ESH ITWG April 7, 2006 Vaals, Netherlands Summary of Environmental, Health and Safety Chapter ITRS 2006.
ITRS Conference, December 6, 2000
2011 ITRS REVISION SCHEDULE AND GUIDELINES CONTENTS 2011 Due Dates and Meetings Whats New for 2011 ? Template info Chapter required topics outline and.
Work in Progress --- Not for Publication PIDS Summary, Peter M. Zeitzoff US Chair ITWG Meeting Vaals, Netherlands April 6-7, 2005.
More than Moore ITRS Summer Meeting 2008 July 14, 2008 San Francisco, CA.
ITRS 2001 ESH Thrust. ESH 2001 Objective Maintain a balance between: 1)Solutions to ESH requirements driven by external elements such as regulations and.
Litho ITRS Update Lithography iTWG July 2010.
2005 ITRS Work in Progress – Do Not Publish 1 International Technology Roadmap for Semiconductors 2005 ITRS/ORTC Product Model Proposals For Public 07/13/05.
(not for publication – work in progress) ITRS Summer Conference 2009 San Francisco 1 Front End Processes 2009 ITRS ITRS Public Conference July 15, 2009.
Slide ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics.
The International Technology Roadmap for Semiconductors
2 December 2003 – ITRS Public Conference Tsinchu, Taiwan ITRS 2003 Front End Process ITRS Conference December 2, 2003 Hsinchu, Taiwan.
International Technology Roadmap for Semiconductors
Litho ITRS Update Lithography iTWG Dec 2010.
PIDS: Poster Session 2002 ITRS Changes and 2003 ITRS Key Issues ITRS Open Meeting Dec. 5, 2002 Tokyo.
International Technology Roadmap for Semiconductors
ITRS 2000 Update - Taipei, Taiwan, 11/06/00
Front End Processes 2010 ITRS
1 PIDS 7/1/01 18 July 2001 Work In Progress – Not for Publication P. Zeitzoff Contributors: J. Hutchby, P. Fang, G. Bourianoff, J. Chung, Y. Hokari, J.
Work in Progress --- Not for Publication 18 July 2001 Work In Progress – Not for Publication Interconnect Working Group 2001 Draft 18 July 2001 San Francisco.
4 December 2002, ITRS 2002 Update Conference Interconnect Working Group ITRS December 2002 Tokyo.
International Technology Roadmap for Semiconductors
Summer Public Conference ORTC 2010 Update Messages
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference PIDS Status and Key Issues: 2004 and 2005 ITRS Peter M. Zeitzoff for PIDS Technology.
International Technology Roadmap for Semiconductors
Work in Progress --- Not for Publication DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference Interconnect Working Group ITRS 2004 Update.
Winter Public Conference ORTC 2010 Update
FEP ITWG Meeting Notes (not for publication – work in progress) ITRS Summer Conference 2011, SF 1 Front End Processes ITRS 2011 Public Conference 13 July.
International Technology Roadmap for Semiconductors
2 December 2003 – ITRS Public Conference Hsin Chu, Taiwan ITRS Presentation PIDS ITWG Emerging Research Devices Hsin-Chu, Taiwan December 2, 2003 Jim Hutchby.
Design and System Drivers Worldwide Design ITWG: T
February 2010 L. Wilson Update Preparations and Formats.
ITRS Design ITWG Design and System Drivers Worldwide Design ITWG Key messages: 1.- Software is now part of semiconductor technology roadmap 2.-
International Technology Roadmap for Semiconductors 2001
International Technology Roadmap for Semiconductors
07/24/02 Alan Allan / Intel Corporation
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
ITRS 2001 Renewal - Work in Progress - Do Not Publish 1 [Per IRC Approved Proposals 3/27/01, Scenario 2.0/3.7] ITRS IRC/ITWG Meeting ORTC Proposal Review.
Overall Roadmap Technology Characteristics (ORTC) 2012
Litho ITRS Update Lithography iTWG December 2008.
Overall Roadmap Technology Characteristics (ORTC) 2012
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference ITRS FEP Challenges Continued scaling will require the introduction of new materials.
An International Technology Roadmap for Semiconductors
Kwangok Jeong and Andrew B. Kahng UCSD VLSI CAD Laboratory
ITRS-2001 Design ITWG Plan December 6, 2000 Bill Joyner, SRC/IBM.
EE141 © Digital Integrated Circuits 2nd Introduction 1 The First Computer.
EZ-COURSEWARE State-of-the-Art Teaching Tools From AMS Teaching Tomorrow’s Technology Today.
ITRS Factory Integration Difficult Challenges Last Updated: 30 May 2003.
Presented By : LAHSAINI Achraf & MAKARA Felipe.  Introduction  Difficult Challenges : > Difficult Challenges between 2013 – 2020 > Difficult Challenges.
CSE 494: Electronic Design Automation Lecture 2 VLSI Design, Physical Design Automation, Design Styles.
ITRS 2000 Update Work In Progress - Do Not Publish! 1 ITRS/ORTC Table Update Technology Node, DRAM Chip Size, and Logic Chip Size Update, Based on the.
Proposed Roadmap Tables on STRJ-WG1
Present – Past -- Future
Transistor Counts 1,000, ,000 10,000 1, i386 i486 Pentium ® Pentium ® Pro K 1 Billion Transistors.
EE141 © Digital Integrated Circuits 2nd Introduction 1 Principle of CMOS VLSI Design Introduction Adapted from Digital Integrated, Copyright 2003 Prentice.
STRJ-WG1 December 12, Design ITWG Mtg. ~ Toward the ITRS 2001 Design Chapter and SoC Chapter ~ STRJ-WG1 Dec 2000.
Trends in IC technology and design J. Christiansen CERN - EP/MIC
ITRS 2000 Update Work In Progress - Do Not Publish! 1 ITRS/ Design TWG Update 2000 System on Chip, Design Productivity, Low Power, Deep Submicron Design.
Advanced Computing and Information Systems laboratory Nanocomputing technologies José A. B. Fortes Dpt. of Electrical and Computer Eng. and Dpt. of Computer.
ITRS 2001 Renewal Work In Progress - Do Not Publish!
Lithography By: Ryan Levin.
Figure 11.1 (p. 260) Trends of power supply voltage V DD, threshold voltage V T, and gate oxide thickness d versus channel length for CMOS logic technologies.
by Yi Zhao CMPE640 ITRS presentation Fall 2005
Presentation transcript:

IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented by: (M1 Half-Pitch + Printed Gate Length)/2 System Drivers in National Electronic Manufacturers Initiative (NEMI) Roadmap will be reviewed in July Meeting 2003 Executive Summary Outline will Include Wireless Leave Current 3-year Columns of 2001 ITRS in 2003 ITRS Long-Term Columns for Reader Convenience –2yr Basis for Long Term Years will be discussed by IRC for 2005 ITRS

Yoshimi-san Proposal: 1. Define the technology node by the minimum half-pitch of metal-1, either in DRAM or MPU. 2. Add a header before the node number to distinguish from the non-ITRS nomenclature. As a header, use half-pitch (hp, 1/2p, HP) ex. hp90nm technology, 1/2p-65nm technology, etc.

Table Data from Yoshimi Proposal : Directly measurable, technologically unambiguous. Can smoothly trace the possible crossover of HP from DRAM to MPU. Can be independent of non-ITRS convention. Consistent with ITRS2001. Quite a minor alteration. ITRS can stay ITRS.

(3) Poly Pitch One Possible Solution: Stay Technology Node Unchanged but To Define and Describe the Logic Half Pitch (=Pitch/2) as M1 in the 2003 ITRS MPU/ASIC DRAM Metal pitch =Cell Pitch (2) Contacted Metal 1 (M1) pitch Logic

N90nm Node N65nm Node

Backup

2003 Outline Foreword – P.Gargini Introduction – TSIA/B.Doering –Overview –Technology Requirements –Potential Solutions –Wireless Technology - ESIA –Overall Roadmap Process and Structure – A. Allan Technology Characteristics/Requirements Tables Technology Nodes [Targets?] Drivers for ITWG Technology Requirements

2003 Outline Grand Challenges – Yoshimi-san/A.Allan –Overview –In the Near Term (through 2009) Enhancing Performance Cost-effective Manufacturing –In the Long Term ( ) Enhancing Performance Cost-effective Manufacturing Difficult Challenges – ITWG Chair Summary –Tables are contributed by ITWGs

2003 Outline Overall Roadmap Technology – A.Allan Characteristics –Background –Overview of 2003 Revisions Definitions Roadmap Timeline Product Generations and Chip-size Model Trends [chip size, lithographic field, wafer size, etc.] Performance of Packaged Chips Electrical Defect Density Power Supply and Dissipation Cost

2003 Outline Glossary – K or J - SIA/A.Allan –Characteristics of Major Markets –Chip and packagephysical and electrical attributes –Fabrication attributes and methods –Maximum substrate diameter –Electrical design and test metrics –Design and test

2003 Outline Technology Working Group Reports - ITWGs –System Drivers –Design –Test and Test Equipment –Process Integration, Devices and Structures Emerging Research Devices –Front-end Processes –Lithography –Interconnect –Factory Integration –Assembly and Packaging –Environment, Safety and Health –Yield Enhancement –Metrology –Modeling and Simulation –Other?

2003 Outline ITWG Reports Required Contents - ITWGs –Scope –Difficult Challenges –Technology Requirements –Potential Solutions –Cross-cut ITWG Issues –Inter Focus ITWG Discussion

2003 Citations Cited Works / Footnoted Materials – ITWGs/L.Wilson –ITWG submits copies of cited works information title page showing all authors publisher, Vol. No., date published, location published, pages used –ITWG submits permission for use

2003 Table Templates Difficult Challenges Tables –5 challenges nm / Through 2009 –5 challenges <45nm / Beyond 2009 Technology Requirements Tables –Proposed Near-term Year Header for All Tables –Proposed Long-term Year Header for All Tables