PMAPS 2012, Istanbul June 12 2012 C. J. Wallnerström, KTH - Royal Insitue of Technology 1 A Pre-Study Towards Investigating the Art of Choosing Right Level.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

1.
President of the National Statistics Council 1 Ridha FERCHIOU National Statistics Council 2007 CNS OECD World Forum on Statistics, Knowledge and Policy.
1 Progress report on Expert Groups on micro and macro household statistics WPNA meeting October 2011 Maryse FESSEAU (OECD – Statistic Directorate, National.
ENQA GA. Bucharest, October 2011
The Swedish Energy Agency The energy system and the sustainable municipality programme 1 Johan Burström Programme manager.
Transnational work – Challenge? Waste? The future way? Overview Introduction Transnational co-operation Transnational work within a national development.
Implications for the Regions EU-Regional Policy 1 Governance White Paper Introduction Adoption of White Paper on European Governance, July 25, 2001 Aim:
European Commission Directorate General Economic and Financial Affairs Harmonisation of BCS: Aggregation methods Roberta Friz Business and consumer surveys.
SWEDISH AGENCY FOR ECONOMIC AND REGIONAL GROWTH Indicator pilot project Skåne-Blekinge, Sweden Kristina Sandberg, Swedish Agency for Economic and Regional.
t J OAQUIM B ERNARDO Coordenador Adjunto do Observatório do QREN Deputy Coordinator of the NSRF Observatory.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
A Fresh Look at the Intervention Logic of Structural Funds
European Commission Directorate General Economic and Financial Affairs New question on capacity utilisation in services - state of play and way forward.
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
New EU Forest Strategy and Update on Forest Information and Monitoring
IMPROVED RESPONDENT EXPERIENCE AND QUALITY THROUGH FEEDBACK Anneli Ström, Statistics Sweden.
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
APS Underground Distribution Cable Replacement Project
Department AFRICA HIV Network Meeting, Nairobi A. Köneke 8 June 2010 HIV/AIDS Mainstreaming in the Africa Department of GTZ.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Development of the Smart Grid Implementation of the Board’s Policies November 20, 2012.
Dept of Biomedical Engineering, Medical Informatics Linköpings universitet, Linköping, Sweden A Data Pre-processing Method to Increase.
LEONARDO DA VINCI - Transfer of Innovation 01/11/ /10/2014 AGREEMENT NUMBER - LLP-LDV-TOI-12-AT-0011 PROJECT NUMBER AT1-LEO T-EST.
ERASMUS FOR ALL EUROPEAN FUNDED PILOT PROJECT OVERVIEW PRESENTED BY DR SHYAM PATIAR.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Competencies for an Adult Literacy Teacher for Immigrants the Nordic Alfa Council Antra Carlsen, NVL EBSN Conference in Prague May 30-31, 2012.
Cost-Revenue Analysis for Decision Making
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
PUSD Teacher Evaluation SY12/13 Governing Board Presentation May 10, 2012.
MANAGEMENT ACCOUNTING
1 Financing ECEC Services Bea Buysse Christele Van Nieuwenhuyzen Kind en Gezin Flanders (Belgium)
SLA-Oriented Resource Provisioning for Cloud Computing
Webcoaching - an alternative and complementary form of meeting individuals with Neuropsychiatric Disorders Emma Nilsson & Stefan Lodestad.
Chapter 6 Labour Market. Outline.  The perfectly competitive model of the labour market  Imperfect competition on the labour market  Further topics.
Introduction Organizations have a relatively large degree of discretion in deciding how to pay. Each employee’s pay is based upon individual performance,
The impact of network density, travel and location patterns on regional road network vulnerability Erik Jenelius Lars-Göran Mattsson Div. of Transport.
Inventory Models  3 Models with Deterministic Demand Model 1: Regular EOQ Model Model 2: EOQ with Backorder Model 3: EPQ with Production  2 Models with.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
RESEARCH METHODOLOGY CHAPTER 3. Components of a research methodology 3.1 Introduction 3.2 Research instruments 3.3 Respondents 3.4 Research procedure.
Introduction of technical paper Funding adaptation in developing countries: extending the share of proceeds used to assist in meeting the costs of adaptation;
Eshboev B.A. Head of the Department for Monitoring of implementation of national development programmes of the Ministry of Economic Development and Trade.
Recognizing Employee Contributions with Pay
Power Quality Control Ing. Jan Šefránek Energetický regulační úřad [Energy Regulatory Office / Czech Republic] Špindlerův Mlýn, 17.
1 The vulnerability of road networks under area-covering disruptions Erik Jenelius Lars-Göran Mattsson Div. of Transport and Location Analysis Dept. of.
SURVEY DESIGN WORDING ISSUES QUESTIONNAIRE DESIGN ISSUES STAT 472.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
GAMMELGARD SE Session 5 – Block 2 – Paper 39 Barcelona May The challenge of regulating natural monopolies in electrical distribution – experices.
1 THE NEED AND POSSIBILITY OF INTRODUCTION OF MULTIFUND SYSTEM IN THE SUPPLEMENTARY RETIREMENT PROVISION ACTIVITY IN BULGARIA Conference “Development of.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
SURVEY RESEARCH.  Purposes and general principles Survey research as a general approach for collecting descriptive data Surveys as data collection methods.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
1 Geography and road network vulnerability Erik Jenelius Div. of Transport and Location Analysis Royal Institute of Technology (KTH), Stockholm.
Implications of regulatory changes of the market model on the distribution business.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Frankfurt (Germany), 6-9 June 2011 PAATERO – SE – S6 – Paper 0485 Adopting a general regulatory approach on the European electricity market Noona Paatero.
DEVELOPED BY MARY BETH FURST ASSOCIATE PROFESSOR, BUCO DIVISION AMY CHASE MARTIN DIRECTOR OF FACULTY DEVELOPMENT AND INSTRUCTIONAL MEDIA UNDERSTANDING.
Embassy of Sweden, Chisinau The new results strategy for Sweden’s reform cooperation with Eastern Europe, the Western Balkans and Turkey Mr.
Smart grid project - interim report - Interim report for the 6th Steering Group Meeting of the Priority Area 2 Budapest,13 June 2013 The project is supported.
Light Touch Calculator Growth that doesn’t cost the earth Emma Hutchinson This webinar is designed to introduce you to the Resource Efficient Scotland.
Felix Badoloa, Bekele Kotub, and Birhanu Zemadim Birhanua
Financial requirements
Study for the preparation of the strategy
The Leader’s Pack For Meeting Individuals When Taking Over A Team.
Presentation transcript:

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 1 A Pre-Study Towards Investigating the Art of Choosing Right Level of Input Data Paper 125, PMAPS 2012, Istanbul June 12, Session 24 Carl Johan Wallnerström 1, Sabina Stenberg 2, Patrik Hilber 1, 1 Royal Institute of Technology – KTH, Stockholm, Sweden 2 Uppsala University / Svenska Kraftnät (Swedish national grid)

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 2 Background In many countries there is a tendency towards both an increased demand of cost-effectiveness and at the same time high reliability, e.g. as a consequence of quality regulations and/or mandatory customer compensations Important to investigate if the introduction of more comprehensive analysis methods are needed or not

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 3 Overall issue Collecting and using comprehensive input data in analyses is expensive, but using to rough methods could however give inaccurate results The aim of this paper is to provide a minor contribution (pre-study) to this major issue: – Highlight the potential problem of using mean values – Provide a method to evaluate existing methods used by DSOs to see if more detailed input data gives different results

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 4 Problem of using mean values Traditional reliability analysis applied to power distribution often use mean values All outages are not about mean length. Some outages are due to switching possibilities short, while some major outages can last >12 hours. This can be a problem if: – The mean consequence from all outages is not equal to the consequence of a mean outage, i.e. if the consequences are not linear dependent with outage length

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 5 Consequences of outages Overall economic consequence categories due to regulation/laws – current situation in Sweden: 1.Outages <0.05 hours: Currently no legal cost for the DSO, but should be reported separately (perhaps included in future version of tariff regulation) 2.Outages hours: Input to tariff regulations (SAIFI and SAIDI), can collectively affect tariff framework despite each customers individual reliability

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 6 Consequences of outages 3.Outages >12 hours: Mandatory individual customer compensation witch increases with time a)12-24 hours: First compensation level, 12.5 % of annual tariff (or min ~100 Euro) b)>24 hours: Higher customer compensation levels, but also since 2011 possible additional consequences followed by a 24 hour functional requirement due to the law An alternative strategy to only using mean values, that relatively easy can be implemented, is to divide outages into length categories

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 7 Consequences of outages

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 8 Evaluate methods at a DSO Current method at this DSO: – Quantitative, but with major simplifications – Measure the decresment of outages minutes, i.e. ~SAIDI*[num. of cust.] for each investment – Looking at a feeder at time, not consider dependences, only consider lines at MV level – Neglect contribution from underground cables – This methods gives an action list of project sorted by [cost]/[reliability improvement]

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 9 Evaluate method at a DSO Will a more comprehensive reliability analysis method give: 1.Another project priority? 2.Other kind of investments preferred? E.g. less focus on replacing OH lines with cables? 3.More or less investments that are profitable? 1 st question easiest to test

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 10 Approach to evaluate new methods Method idea: – Compare an existing analysis method with new methods without perform any sharp or expensive changes in the organization – The approach is to study already performed investments and then perform a hypothetical investment planning process based on more comprehensive reliability analysis and compare the outcomes – The next step, if positive outcome, can be a sharp pilot study of analysis method(s) and after that consider permanent changes

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 11 Closure Important issues are highlighted: – A tendency towards increased demand of cost-effectiveness on the one hand, and high reliability on the other more important to chose good analysis methods – The problem of using average values – The difficulty to chose right level of input data A method to investigate whether a more comprehensive analysis method give different outcome, without perform any sharp changes

PMAPS 2012, Istanbul June C. J. Wallnerström, KTH - Royal Insitue of Technology 12 Thank you for your attention!