Grenoble, France1 Work in Progress – Not for Publication April 26-27, 2001 ESH ITWG 2001 ITRS Status Update.

Slides:



Advertisements
Similar presentations
Detoxification & Clean Production Design & Products Plus Goes hand-in-hand with conserving and closing loops: Waste as Food Main problems rooted in the.
Advertisements

Work in Progress --- Not for Publication 26 April Interconnect Working Group ITRS April 2001 Grenoble.
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented.
ITRS Winter Conference 2006 The Ambassador Hotel Hsin Chu Taiwan 1 ITRS IRC/ITWG Meetings HsinChu December 4, 2006 UPDATED Linda Wilson
Nov 29, 2001 ITRS Conference Assembly and Packaging Joe Adam TWIG Co-chair.
ITRS Summer Conference 2010 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2010 Hans-Peter.
ESH ITWG April 7, 2006 Vaals, Netherlands Summary of Environmental, Health and Safety Chapter ITRS 2006.
18 July 2001 Work In Progress – Not for Publication Assembly and Packaging Joe Adam TWIG Co-chair.
Work in Progress --- Not for Publication PIDS Summary, Peter M. Zeitzoff US Chair ITWG Meeting Vaals, Netherlands April 6-7, 2005.
ITRS Test TWG Don Edenfeld April 20 th, 2004 Spring Workshop - Stressa, Italy.
ITRS 2001 ESH Thrust. ESH 2001 Objective Maintain a balance between: 1)Solutions to ESH requirements driven by external elements such as regulations and.
Litho ITRS Update Lithography iTWG July 2010.
Slide ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics.
The International Technology Roadmap for Semiconductors
1 ERD 2012 ITRS Spring Conference – Noordwijk, the Netherlands – Apr. 24, 2012 ITRS Public Conference Emerging Research Devices 2012 ERD Chapter Victor.
Litho ITRS Update Lithography iTWG Dec 2010.
ITRS Winter Conference 2008 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2009 Hans-Peter.
FEP ITWG Meeting Notes (not for publication – work in progress) ITRS Spring Conference 2008 Petersberg, Germany 1 ITRS 2008 ITWG Spring Meeting April 2-4.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference ITRS 2004 Environmental, Safety and Health Chapter ITRS Conference, San Francisco, CA.
1 DRAFT - NOT FOR PUBLICATION April 5-7, 2006, Maastricht ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006 Lothar Pfitzner, ,
July 13, 2010ITRS public conference – San Francisco1 More-than-Moore Roadmapping Update.
ITRS Design ITWG Design and System Drivers Worldwide Design ITWG Key messages: 1.- Software is now part of semiconductor technology roadmap 2.-
International Technology Roadmap for Semiconductors 2001
San Francisco - July 18, ITRS DRAFT DO NOT PUBLISH ESH ITWG Jim Jewett Summary of Environmental, Safety and Health Chapter ITRS 2007.
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
ITRS Design + System Drivers July, 2010 Design ITWG Juan-Antonio Carballo Tamotsu Hiwatashi William Joyner Andrew Kahng Noel Menezes Shireesh Verma.
24 July 2002 Work In Progress – Not for Publication Modeling and Simulation ITWG Jürgen Lorenz - FhG-IISB ITWG/TWG Members H. Jaouen, STM * W. Molzer,
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
1 DRAFT – Work In Progress - NOT FOR PUBLICATION 13 July 2005 ITRS Environmental, Safety and Health Chapter ITRS Conference, San Francisco, California.
1 Noordwijk April 23-/ April 2012 Summary for Plenary Abraham Arceo (Sematech) Arnaud Favre (adixen) Herve Fontaine (CEA Leti) Guillaume Gallet.
Research and Innovation Research and Innovation Enabling & Industrial Technologies in Horizon 2020 Enabling & Industrial Technologies in Horizon 2020 Research.
Kwangok Jeong and Andrew B. Kahng UCSD VLSI CAD Laboratory
1.  Green Remediation (EPA) “the practice of considering all environmental effects of remedy implementation and incorporating options to minimize the.
Fermilab Environmental Management System (EMS)
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
SANDHYA RANI NADIPALLI 05/06/15
First Discussion of Climate Change Steering Committee Recommendations to COG Board of Directors Agenda Item #6 February 27, 2008.
Update on progress with development of DS459
Agency Master Planning 50 th R. H. Goddard Memorial Symposium Dreams and Possibilities: Planning for the Achievable Calvin Williams Acting Director, Technical.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
June SURVEY OF EUROPEAN DIRECTIVES European directives are based on the new approach in order to provide free movement of goods in the single market.
1 TSP Update NATF Review July 8, Today’s Objectives Goal: Successful Implementation of Go-Live Ensure there are no “Show Stoppers” Ensure there.
MA Day 55 – April 4, 2013 Section 13.3: The fundamental theorem for line integrals – Review theorems – Finding Potential functions – The Law of.
THE GREEN SUPPLIERS NETWORK- MICHIGAN Presented for: The Great Lakes Regional Pollution Prevention Roundtable Winter Meeting March 8-9, 2005, McCormick.
Progress Reports. Schedule m m.
STRJ-WG1 February 4, Design ITWG Mtg. ~ Toward the ITRS 2001 Design Chapter and Systems Drivers Chapter ~ STRJ-WG1 Feb 2001 Feb.4,2001 in San Francisco.
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and.
EMS Effectiveness in the Federal Community A Summary of Agency Responses to the “un scored” Metrics for Federal EMS Progress and Performance Reporting.
Supply Chain Management Sustainability Balanced Scorecard
1 Public Meeting to Update the Board on Mandatory Commercial Waste Recycling October 21, 2011.
June 2015 Sustainability Cultural Indicators Program (SCIP) YEAR 3 UPDATE Sustainability Cultural Indicators Program (SCIP) YEAR 3 UPDATE.
Sustainability and Facilities Management John Sullivan Energy & Sustainability Office Facilities & Services Division.
STRJ-WG1 December 12, Design ITWG Mtg. ~ Toward the ITRS 2001 Design Chapter and SoC Chapter ~ STRJ-WG1 Dec 2000.
Peru Creek Water Quality Improvements 319 Grant Update February 12, 2014.
How Does Sustainability Fit with Other Environmental Initiatives?
What is Green Globe? It is an international environmental certification program adapted for the tourism industry It sets precise environmental performance.
Flame Retardant Product Risk Assessments Veronique Steukers, 1 April 2003.
ITRS AMC Roadmap Project Plan : AMC Integrated Concept
ESH Task Force Presentation to Joint Steering Committee Shoumian Chen ICRD Shanghai / China Feb 21-23, 2011.
ESH Task Force Presentation to Joint Steering Committee Shoumian Chen ICRD Shanghai / China Feb 21-23, 2011.
WGF Sub-group on Reporting Progress report
ESH Update ESH TF Shanghai Feb
JSTC Presentation Semiconductor Social Contribution through Outreach
PFC WG WSC - ESH TF Shanghai, China February, 2010 WG Members
Takayuki Ohgoshi SIA in Japan Shanghai China 21- Feb. 2011
Jana Kokoscha Mike Lindenau Ceyhun Ceylan & Burak Top
Energy Transformations and Conservation
by Yi Zhao CMPE640 ITRS presentation Fall 2005
Presentation transcript:

Grenoble, France1 Work in Progress – Not for Publication April 26-27, 2001 ESH ITWG 2001 ITRS Status Update

Grenoble, France2 Work in Progress – Not for Publication April 26-27, 2001 ITWG Participants Junichi Aoyama-JEITA (SONY) Jim Jewett-SIA (Intel) Coleen Miller-SIA (ISMT/TI) Alain Roche-ESIA (ST Micro) Francois Tardif-ESIA (CEA-LETI)

Grenoble, France3 Work in Progress – Not for Publication April 26-27, 2001 PROPOSED CHANGES Improved Resource Conservation Metrics (energy, water, materials) will be tied to Manufactured Functions Concentrate on Materials (~80% of looming ESH Issues) in ITRS –Reference table in Roadmap Identify Banned, Restricted and Unrestricted materials and material classes –Characterization requirement for downstream residues (wastes, emissions, etc) –Rating Method for ESH Properties/Risks (e.g.. – Green/Yellow/Red Flag)

Grenoble, France4 Work in Progress – Not for Publication April 26-27, 2001 ASSEMBLY/PACKAGING Issues Reset tables to reflect Lead and Brominated flame retardant restrictions Revise Material Section to better define Restrictions and Timing Issues Implement concept of Absolute, Restricted and Unrestricted Materials (specific and generic) Evaluate Need for Metrics related to Resource Conservation (Energy & Water)

Grenoble, France5 Work in Progress – Not for Publication April 26-27, 2001 FACTORY INTEGRATION Issues Sub-Fab Space Resource Reduction Metrics TBD

Grenoble, France6 Work in Progress – Not for Publication April 26-27, 2001 OTHER CROSS-ITWG Interactions Realign key ESH issues with FEP, Interconnect, and Lithography Clearly identify any potential technology show- stoppers (such as PFOS, pre-cursor selection) TBD