Update on the HEC-RAS Reservoir Transport Simulation Mike Langland and Ed Koerkle 03/30/2012.

Slides:



Advertisements
Similar presentations
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
Advertisements

The Effect of the Changing Dynamics of the Conowingo Dam on the Chesapeake Bay Mukhtar Ibrahim and Karl Berger, COG staff Water Resources Technical Committee.
Hydrologic Engineering Center1 The Development of a Flood Warning and Response System Cameron Ackerman, P.E. Hydrologic Engineering Center, USACE.
HYDROLOGIC AND HYDRAULIC MODELING Hydrologic Precipitation & Basin Parameters, Flood Frequency Analysis Hydraulic Energy & Momentum Relationships.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
2011 Storm impacts on nutrients and sediment in the Susquehanna River Basin Presentation for the Impacts of Tropical Storms Irene and Lee on the Hudson.
Hydrology and Hydraulics. Reservoir Configuration.
Temperature and Flow Dynamics of the Klamath River Technical Memorandum 7 Leon Basdekas Mike Deas Watercourse Engineering, Inc nd Street, Suite B.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Application of GIS Tools for Hydraulic Modeling
CHARACTER OF RIVER CHANNELS
WATER TEMPERATURE MODEL FOR BRANCHED RIVER SYSTEMS.
HEC-RAS.
Sediment Erosion Characteristics at the Potomac River Jerome P.-Y. maa Virginia Institute of Marine Science College of William and Mary.
ESHMC Meeting 6 May 2008 Stacey Taylor. Overview Model river representation in ESPAM 1 What data is available to make changes for the new stress periods.
BUILDING STRONG ® South Platte CWMS Model Missouri Basin Forecasters Meeting January 29, 2014 South Platte CWMS Model Missouri Basin Forecasters Meeting.
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
1 Real Time Flood Forecasting for the Willamette Basin using HEC-CWMS / ResSim Modeling Real Time Flood Forecasting for the Willamette.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Lower Susquehanna River Dam Sediment and Solutions Conowingo Relicensing; LSRWA; MD County Resistance; Solutions; CAC Involvement Thursday November 29.
Lower Saluda River Instream Flow Study TWC Study Team Workshop December 11, 2007.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
David Ramirez, P.E. Senior Hydrologist Lower Mississippi River Forecast Center Slidell, LA Real-Time Operation of HEC-RAS at the Lower Mississippi River.
Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic.
Stream Stability and Sediment Transport Environmental Hydrology Lecture 21.
Lower Susquehanna River Watershed Assessment Citizens Advisory Committee November 29, 2012 Anna Compton USACE 1.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
U.S. Department of the Interior U.S. Geological Survey Modeling sand transport and sandbar evolution along the Colorado River below Glen Canyon Dam.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Outline of the training. 6 October 2005, TNMC, Bangkok.
National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Bank erosion study.
Baird Claytor Hydroelectric Project Sedimentation Study.
Team 10 Presentation Vol. II 18th February 2011 Sophia Antipolis, France Improvement by calibration or with geometry?
Sensitivity analysis of hydraulic model to morphological changes and changes in flood inundation extent J.S. Wong 1, J. Freer 1, P.D. Bates 1, & D.A. Sear.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
MIKE 11 IntroductionNovember 2002Part 1 Introduction to MIKE 11 Part 1 General Hydrodynamics within MIKE 11 –Basic Equations –Flow Types Numerical Scheme.
Stream Gages CBRFC Stakeholder Forum July 31, 2012.
Design Guidance for Low-water Crossing in Gravel Rivers Xing Fang Lamar University.
1 Triangulated Irregular Network Node Edge Face. 2 3D Structure of a TIN.
Robert M. Hirsch, Research Hydrologist, USGS September 6, 2012 Nitrogen, Phosphorus, and Suspended Sediment fluxes from the Susquehanna River to the Bay.
Morphological Modeling of the Alameda Creek Flood Control Channel Rohin Saleh, Alameda County Flood Control District Søren Tjerry, Ph.D., DHI Portland,
Sediment Transport Modelling Lab. The Law of the Wall The law of the wall states that the average velocity of a turbulent flow at a certain point is proportional.
Hydrologic Calibration: October 2010 U PDATE OF E FFECTIVE H YDROLOGY FOR M ARYS C REEK.
Sedimentology Lecture #6 Class Exercise The Fenton River Exercise.
River Meanders Outline Primary flow characteristics within a meander bend Flow and sediment transport within meander bend Controls on meander wavelength.
1D Hydraulic Modeling w/ LiDAR Data Noah J. Finnegan 1 1 UC Santa Cruz, Earth & Planetary Sciences.
Development of a High-Resolution Flood Inundation Model of Charles City, Iowa Nathan Young Associate Research Engineer Larry Weber.
Reservoir and Flow Routing Model Transect Data Collection Water Resources Study Planning Meeting January 25, 2012 Prepared by 1.
River Stage and Bottom Elevation
Citizens Advisory Council
Overview of Spokane- Coeur d’Alene Hydrology
DEP Citizen Advisory Committee October 17, 2017
Morphodynamic and Sediment Tracers in One-Dimension
Exercise 1: Fenton River Floodplain Exercise
Conowingo Dam Update Presented to the Citizens Advisory Committee
Provo River Watershed Modeling with WMS Ryan Murdock.
Status Nearly 30 scenarios completed for NAB and CBP over a year’s effort. Report on application of CBEMP in preparation. October time frame for draft.
Bed material transport
West Virginia CBP Non-tidal Network: 2006 Status Update
Lower Susquehanna River Watershed Assessment
SIEVE RIVER: SIMULATION OF THE 19/11/1999 FLOW EVENT
Lower Susquehanna River Watershed Assessment
Use of ArcGIS to extract river geometry as an input to HECRAS model and prepare inundation, and velocity maps Term Project, CEE 6440, Fall 2016 Presented.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Enforcement Advocacy Stewardship Education
CECINA RIVER: SIMULATION OF THE 24/11-2/12/2003 FLOW EVENT
Study Update Water Quality Modeling
Presentation transcript:

Update on the HEC-RAS Reservoir Transport Simulation Mike Langland and Ed Koerkle 03/30/2012

Sediment Input Data Model Geometry and Hydraulics Model Sediment Transport Topics

Susquehanna River Reservoirs

Transport Curves

Particle Size Transport (Conowingo) 391 samples % sand/fines 16 samples % sand/silt/clay Missing data ?

Model Geometry and Hydraulics

Boundary and USGS transect data PA MD Marietta Gaging Site Safe Harbor Dam Conowingo Dam Holdwood Dam Conestoga River Pequea Creek Muddy Run Broad Creek

Marietta Gaging Site Safe Harbor Dam Conowingo Dam Holdwood Dam Conestoga River Pequea Creek Muddy Run Broad Creek With FEMA adds PA MD

Add Lidar

Elevation Discrepancies

Sediment Transport Simulation Progress limited Calibrate one “average” flow year (no scour) and a high flow event (Sept 2011) Bed sediment particle size distribution and shear stress

Summary Model Geometry and Hydraulics nearly complete Issue with GeoRAS resolved (max # of transect points) On schedule to have HEC-RAS model completed by June, 2012.