ITRS Winter Conference 2011 Incheon, Korea 1 Work in Progress: Not for Distribution 2012 ITRS Litho One Pager April 24, 2012 Mark Neisser – SEMATECH Mauro.

Slides:



Advertisements
Similar presentations
Chapter 5 One- and Two-Sample Estimation Problems.
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
Metrology Roadmap Europe Rien Stoup(PAN Analytical) Mauro Vasconi (ST)
2009 Litho ITRS Spring Meeting
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Lithography ITWG Report
DRAFT - NOT FOR PUBLICATION 16 July 2003 – ITRS Public Conference Lithography Update ITRS Meeting San Francisco, CA July
Litho ITRS Update Lithography iTWG July 2010.
2005 ITRS Work in Progress – Do Not Publish 1 International Technology Roadmap for Semiconductors 2005 ITRS/ORTC Product Model Proposals For Public 07/13/05.
(not for publication – work in progress) ITRS Summer Conference 2009 San Francisco 1 Front End Processes 2009 ITRS ITRS Public Conference July 15, 2009.
Winter ITRS Conference Lithography International Technical Working Group.
Michael Lercel And the rest of the Litho TWG’s
Work in Progress --- Not for Publication 6 December Interconnect Working Group ITRS 2000 Lakeshore Hotel, Hsinchu, Taiwan, R.O.C. 6 December 2000.
International Technology Roadmap for Semiconductors
Litho ITRS Update Lithography iTWG Dec 2010.
International Technology Roadmap for Semiconductors
ITRS 2000 Update - Taipei, Taiwan, 11/06/00
Front End Processes 2010 ITRS
FEP ITWG Meeting Notes (not for publication – work in progress) ITRS Spring Conference 2008 Petersberg, Germany 1 ITRS 2008 ITWG Spring Meeting April 2-4.
International Technology Roadmap for Semiconductors
Summer Public Conference ORTC 2010 Update Messages
International Technology Roadmap for Semiconductors
Winter Public Conference ORTC 2010 Update
FEP ITWG Meeting Notes (not for publication – work in progress) ITRS Summer Conference 2011, SF 1 Front End Processes ITRS 2011 Public Conference 13 July.
July 13, 2010ITRS public conference – San Francisco1 More-than-Moore Roadmapping Update.
International Technology Roadmap for Semiconductors
International Technology Roadmap for Semiconductors 2001
International Technology Roadmap for Semiconductors
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
2009 Litho ITRS Update Lithography iTWG July 2009.
Lithography iTWG 2009 Summary
ITRS 2001 Renewal - Work in Progress - Do Not Publish 1 [Per IRC Approved Proposals 3/27/01, Scenario 2.0/3.7] ITRS IRC/ITWG Meeting ORTC Proposal Review.
2004 ITRS Update ORTC Overview Nodes, Chip Size, Transistors, Capacity, $ Trends Alan Allan/Intel Corp.
Work in progress – Do not publish or distribute 1 Summer Public Conference ORTC 2011 ITRS Alan Allan, Rev 0, 7/13/11.
Overall Roadmap Technology Characteristics (ORTC) 2012
Litho ITRS Update Lithography iTWG December 2008.
Overall Roadmap Technology Characteristics (ORTC) 2012
DRAFT – Work In Progress - NOT FOR PUBLICATION 13 July updates to the Lithography chapter of the ITRS Lithography International Technology.
ORTC 2012/13 ITRS Work IRC and CTSG Plenary
Factory Integration Update to IRC April 23, 2012 Gopal Rao / Factory Integration Gopal Rao, Peter Csatary, Richard Oechsner, Reiner Missale, Leo.
Framework for the Future Curriculum Council Report May 18, 2010.
Richmond House, Liverpool (1) 26 th January 2004.
1 of Audience Survey Results Larry D. Gustke, Ph.D. – October 5, 2013.
What is CoreCourseGPA.com? A web based tool assisting: High School Counselors High School Coaches High School Players Parents.
Work in Progress – Do not Publish - FEP ITRS Winter Public Conference 2012, Taiwan 1 Front End Processes ITRS 2012 Winter Public Conference.
15. Oktober Oktober Oktober 2012.
Quadratic Inequalities
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
© 2012 National Heart Foundation of Australia. Slide 2.
©Evergreen Public Schools Arithmetic Sequences Recursive Rules Vocabulary : arithmetic sequence explicit form recursive form 4/11/2011.
Annual Measurable Objectives (AMOs) School Year Update.
World Meteorological Organization Working together in weather, climate and water Scale of Assessments 2012 and 2013 Congress WMO.
The sum of the digits of the number 2010 is 3
1 Key facts about the proposals: What is FRS 101? Qualifying entities need not disclose: – A cash flow statement (IAS 7); – Related party transactions.
25 seconds left…...
Successful completion of the following requirements:  Language Arts– 3 middle school level or higher courses  Mathematics – 3 distinct middle school.
1 Unit 1 Kinematics Chapter 1 Day
FISCAL CONSTRAINTS & CHALLENGES PRESENTED TO THE BOARD OF EDUCATION DECEMBER 9, Rye City School District.
Weekly Attendance by Class w/e 6 th September 2013.
How to graduate from Riverdale High School. Requirements to graduate: What year did you enter High School? Use the year entered high school to determine.
Budget Projections April 22, What Will Be Covered Tonight? Update on state legislature and public school funding Preliminary.
Analysing 2014 Results Using pupil performance data for judging schools Schools are judged on the following performance indicators: VA (Value Added) APS.
PBTs & College Council PBTs & College Council Batch 1 SLOAC SSLOAC AUOAC Batch 1 SLOAC SSLOAC AUOAC Curriculum Review ACCJC Resource Allocation.
FEDERAL STUDENT AID AND COMMUNITY COLLEGE STUDENTS Sandy Baum George Washington University Graduate School of Education and The Urban Institute North Carolina.
ITRS 2000 Update Work In Progress - Do Not Publish! 1 ITRS/ORTC Table Update Technology Node, DRAM Chip Size, and Logic Chip Size Update, Based on the.
CSE 242A Integrated Circuit Layout Automation Lecture 1: Introduction Winter 2009 Chung-Kuan Cheng.
ITRS 2001 Renewal Work In Progress - Do Not Publish!
by Yi Zhao CMPE640 ITRS presentation Fall 2005
Presentation transcript:

ITRS Winter Conference 2011 Incheon, Korea 1 Work in Progress: Not for Distribution 2012 ITRS Litho One Pager April 24, 2012 Mark Neisser – SEMATECH Mauro Vasconi – Micron Tatsuo Chijimatsu, Fujitsu Y.C. Ku – TSMC Reiner Garreis -- Zeiss

ITRS Winter Conference 2011 Incheon, Korea 2 Work in Progress: Not for Distribution Updated Challenges Short term challenges are similar to last update Long term challenges add DSA design rules and more EUV complexity

ITRS Winter Conference 2011 Incheon, Korea 3 Work in Progress: Not for Distribution Updated MPU/DRAM Options Imprint no longer considered an option for 22nm MPU and DRAM, but still option for all 16nm products DSA + Litho considered more likely than imprint for 16nm and 11nm nodes for MPU, DRAM and flash

ITRS Winter Conference 2011 Incheon, Korea 4 Work in Progress: Not for Distribution Notes 450nm production use considered unfeasible for 2014 and 2015 Litho can support proposed accelerated MPU roadmap assuming use of double patterning –ArF immersion plus double patterning for 2013 (27nm half pitch) –EUV with double patterning for 2017 (14nm half pitch) Will add a DSA table similar to current resist requirements one for the 2013 update