Cologne, 2006-05-30 22 Topical Conference Improving Nuclear Safety through Operating Experience Feedback.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Lyon, October Sophie.
Framatome ANP IP-EUROTRANS Meeting WP 1.5 Progress in safety approach development TEE, March Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – Safety approach Madrid, November Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Stockholm, May Sophie.
STRAGEGY FOR ENHANCING SHARE OF NUCLEAR ENERGY – Ensuring Safety & viability S.S. Bajaj Chairman, AERB 6 th Nuclear Energy Conclave, New Delhi 14 Oct 2014.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Protection Against Occupational Exposure
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Energy for the Future Belene NPP Design Features May, 2008 Riviera Holiday Club, Varna, Bulgaria Jordan Georgiev BNPP Manager.
SAFETY OBJECTIVES FOR GENERATION III NPP APPLIED TO EPR DESIGN OPTIONS PRESENTATION 26 – 29 September 2010, Nesebar, Bulgaria WATTELLE Emmanuel IRSN, France.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
SAFETY AND LICENSING OF SPENT FUEL STORAGE AND TRANSPORT-Safety issues within spent fuel transport by AREVA Stéphane BRUT François DERLOT Laurent MILET.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June 2011 LICENSING PROCESS FOR BELENE NPP: CURRENT STATUS AND NEXT STEPS Tinko Ganchev Head of Department.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
Improve nuclear safety and reduce environmental impact – international and national practice Roundtable “Environmental Safety: Scientific and Technical.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
56th Regular Session of the IAEA General Conference
INPRO Assessment of Safety of Innovative Nuclear Reactors and Fuel Cycles INPRO Assessment of Safety of Innovative Nuclear Reactors and Fuel Cycles Y.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
OECD Nuclear Energy Agency (NEA): A Forum for sharing experience Mr. Luis E. Echávarri Director General NEA/IAEA/WANO, Cologne, May 2006.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
ERMSAR 2012, Cologne March 21 – 23, 2012 In-vessel retention as retrofitting measure for existing nuclear power plants M. Bauer, Westinghouse Electric.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
ERMSAR 2012, Cologne March 21 – 23, 2012 ASTEC V2.0 rev 1 Reactor Applications French PWR 900 MWe Accident Sequences Comparison with MAAP4 V. Lombard,
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
IAEA International Atomic Energy Agency IAEA Safety Standards and Public Exposure to Radon Trevor Boal Radiation Protection Unit - NSRW.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Occupational Radiation Protection during High Exposure Operations
Defense-in-Depth and Mitigative Measures
Severe Accident Qualification EPR™ OL3
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Vesa Tanner European Commission Directorate-General Energy
Flooding Walkdown Guidance
Approach to Practical Elimination in Finland
Complementarity of deterministic and probabilistic approaches
Diversity analysis for advanced reactor design
IVR Design and Safety Demonstration of Advanced NPPs in China
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Review of the upgraded severe accident mitigation strategies for the generation II PWRs in France foreseen in the framework of plant life extension International.
Communication and Consultation with Interested Parties by the RB
Regulatory Oversight of HOF in Finland
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Version 1.0, May 2015 This material was.
Risk Management and Mitigation
Session Name: Lessons Learned from Mega Projects
VICTOR HUGO SANCHEZ ESPINOZA and I. GÓMEZ-GARCÍA-TORAÑO
EQUIPMENT RELIABILITY AT KOEBERG
Version 1.0, May 2015 SHORT COURSE
Interfaces of Nuclear Safety and Security
Presentation transcript:

Cologne, Topical Conference Improving Nuclear Safety through Operating Experience Feedback

Cologne, Evolutionary Design Fundamental objectives for the development of future NPPs  High safety level  Competitiveness against other power generating plants,

Cologne, Economic The EPR competes successfully against a coal fired power plant.

Cologne, Safety Probabilistic objectives and targets  the integral core melt frequency, considering all plant states and all types of events shall be less than 10-5/r.y.  the risk of large releases shall be “practically eliminated”, large releases being defined as releases beyond the acceptable limits in terms of consequences: no permanent relocation, no need for emergency evacuation outside the immediate vicinity of the plant, limited sheltering, and no long term restrictions in consumption of food.

Cologne, Safety Two fold strategy:  Improvement of the preventive level of the defense-in depth concept:  prevention of deviation from normal operation  detection of deviation from normal operation and provision of means to prevent the propagation to accident conditions,  mitigation of accidents,  Implementation of additional technical features to mitigate the consequences of severe accidents avoiding the necessity of stringent off- site countermeasures.

Cologne, EPR Safety System Configuration

Cologne, EPR Safety System Configuration On the basis of the approaches implemented in existing French and German plants, a safety system configuration has been established, which combines the advantages of a system configuration, which allows mutual back-up of existing systems with the concept of providing a high degree of redundancy and the separation of functions.

Cologne, Passive Features in the EPR  Larger steam generator and pressurizer volumes to slow plant response and increase grace periods,  Safety injection system suction line directly from IRWST, which is located inside the containment, in order to avoid switchover from injection mode to recirculation mode,  Lower core elevation relative to the cold leg cross over piping which limits core uncovery during SB LOCA,  A large dedicated spreading area outside the reactor cavity to prevent the molten core-concrete interaction by spreading and subsequent flooding of the corium,  A large water source in the IRWST, draining by gravity into the corium spreading area.

Cologne, Safety Approach for Severe Accidents Request from licensing authorities:  Situations that would lead to large early releases such as containment bypass, strong reactivity accidents, core melt with reactor coolant system at high pressure or global hydrogen detonation, have to be “practically eliminated”. If they cannot be considered as physically impossible, design provisions have to be taken to design them out.  All other solutions, including the low-pressure core melt accidents have to be mitigated by design measures, so that the corresponding radiological consequences would necessitate only very limited protective measures in area and time.

Cologne, Safety Approach for Severe Accidents  The EPR follows the deterministic approach with the objective to strengthen the design measures in such a way that a “practical elimination” of large releases is achieved. This implies technical measures to avoid early containment failure by transient events as well as measures to ensure long-term integrity of the containment.

Cologne, Feedback from AREVA NP GmbH (Germany) Operating experience is drawn from the following sources:  all reportable events in AREVA NP GmbH-built nuclear power plants (reporting according to regulatory authority guidelines)  all reportable event reports issued by the German Association for Plant and Reactor Safety (GRS)  all reports issued by the GRS from the network of the Incident Reporting System of the IAEA/OECD which are of relevance to nuclear power plant operators  reports selected by Framatome ANP GmbH from the network of the American Institute of Nuclear Power Operations (INPO) which are considered important to nuclear power plant operators  reports selected by the German Association of Large Power Plant Operators (VGB) from the network of the World Association of Nuclear Operators (WANO).

Cologne, Feedback from AREVA NP SAS (France)  The information comes from the INPO (American Institute of Nuclear Power Operations) data base, from event files of EDF and from FROG (Framatome Owners Group).  Usage of generic investigations results given by AREVA NP & EDF for special cases.  Utilization of IAEA & OECD publications.  Internal information in AREVA NP coming, in particular, from the construction sites, and Nuclear Services Operations.  Relations with EDF; on specific problems, "Working Groups" are organized with the objective of information exchange and definition of necessary actions.

Cologne, Feedback from German Utilities  According to German regulations, operating German nuclear power plants must report all accidents, incidents and other events and classify their reports according to significance. Thus, these so-called "Notifiable Events" constitute a collection of all incidents observed in German plants, which might be relevant to safety.  The German Association for Plant and Reactor Safety (GRS) considers all events which must be reported, either in Germany or world-wide. All events which are significant in the opinion of GRS, are distributed to the operators of all German nuclear power plants, in the form of so-called "GRS Information Notices".  Notifiable Events as well as the GRS Information Notices are examined by the Utilities' experts regarding their relevance for the EPR.

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - System design Avoidance of Sump Clogging  Trash racks above the heavy floor openings Heavy floor openings

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - System design Retaining basket CHRS strainer SIS stainer Retaining basket SIS stainer Avoidance of Sump Clogging  Large retention baskets, sump strainers

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - System design IRWST

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - System design Mitigation of SGTR - design features of the EPR :  The delivery head of the Medium Head Safety Injection System (MHSI) is below the secondary safety valves set point  Detection of the affected steam generator on a straightforward symptom (water level measurement in the affected SG)  Increase of t he steam generator secondary volume The safety demonstration based on this design allows for demonstrating that the radiological criteria are met with high margins.

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - Component design and material N4 EPR Steam Generators

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - Component design and material N4 EPR Pressurizer »s»s

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - Component design and material Reactor Coolant Pumps  The primary coolant pumps are a development of the model N24 that are used in N4. They are equipped with standstill seals in order to ensure complete tightness of the pump sealing after stop of the pump. Reactor Pressure Vessel Internals  The design of the internals of the RPV is very close to those of N4 with some geometrical adaptations (241 assemblies 17x17 instead of 205 assemblies 17x17 for N4). Adaptations were taken from Konvoi plants, e.g. the control rod guides. Thermal sleeves  In several operating plants there is a thermal sleeves. On the EPR there are no thermal sleeves on the nozzles connecting the MCL and the RHRS.

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - Radiation Protection  The annual collective dose will be restricted to 0.5 man Sv per 1 GW net electric power.  In parallel to optimization of works, design evolutions which have an impact on radiation protection, have been identified.  Optimization of the source term  Reduction of dose rate  Reduction of exposure time under radiation field

Cologne, Typical Examples and Countermeasures introduced in the EPR Design - I&C  Improvement of the elaboration of the functional diagrams with appropriate tools and organizational measures  The definition of requirements for design and qualification of equipment has been undertaken through the work on I&C.  Testing and validation on site of level 1 and 2 I&C will be improved and easier with the implementation of a tester for the verification of the software equations and of a simulator for the verification of the images, alarm sheets, operating procedures.  Also with regard to the grounding concept, the experience gained from past experience will be taken by improvements in the EPR design.