Subcommittee On Pressure Relief Systems API CRE Update Clark Shepard Spring 2010.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

ISO ESP Systems Task Group Leader, Shauna Noonan
Fundamentals of Pressure Relief Devices
BS EN ISO Cleanrooms & associated controlled environments- Part 3: Metrology and test methods DIS.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Tank Standards Update
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
INSTRUMENTATION AND CONTROLS FOR SAFETY
BakerRisk also has the ability to utilize other software tools to complete a full flare system analysis: ChemCad® Dynamic flare header hydraulics Flare.
ISO / API-2000 Deflagration Venting/Mitigation Brad Otis April 28, API Spring Refining and Equipment Standards Meeting.
Differences Between API th and 6 th Editions Brad Otis April 26, API Spring Refining and Equipment Standards Meeting.
Skilled Trades 1201 Residential Plumbing.
Introduction to Safety Relief Systems
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
111 API Tank Standards Update The National Petroleum Management Association PETRO 2013 Hilton Alexandria Mark Center Alexandria, Virginia November 20,
ISO 9001:2015 Revision overview - General users
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Committee on Refinery Equipment May 2011 Update to the Refining Subcommittee Kelly Smith, ConocoPhillips, Chair, CRE.
Relieve system design problems and DIERS activity
ISO 9001:2015 Revision overview - General users
Committee on Refinery Equipment 2007 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
File Name – Date - Owner of File Welcome! TANK BLANKETING Its Theory and Purpose, The Process and Its Setup.
ISCC Report Spring Refining Meeting 2007 Seattle, Washington.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
OTC Attainment Planning Update SIP Steering Committee April 13, 2011.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
Process Department.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
API Subcommittee 6 Winter meeting 2015 – TG1 Pipeline and Valves Standards Report Rick Faircloth January 4 th, 2014.
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Supplementary Guidance on the Reporting of Hydrocarbon Release, Issue 3 January 2016.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
API SPRING MEETING April , 2015 Seattle, Washington
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
Update on CTAC VCS Subcommittee
API FALL MEETING November , 2014 Denver, Colorado
API S64 Summer Conference Update.
2016 Exploration & Production Standards Conference Subcommittee 10
ISO TC64/SC4/WG2 May 2011 status
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 17H TASK GROUP January 15, 2013.
Committee on Refinery Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Specification on float equipment
Review plan of the nature reporting – update 6
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2015 January February March April May June July August September
Presentation transcript:

Subcommittee On Pressure Relief Systems API CRE Update Clark Shepard Spring 2010

1 Standard/RPTitleCurrent Edition Date Notes or Comments Expected Publication Date Std 520 Part 1Sizing, Selection, and Installation of Pressure- relieving Devices in Refineries Part I—Sizing and Selection 8th Edition, December 2008 Work items beginning in Spring th Edition 2013 RP 520 Part 2Sizing, Selection, and Installation of Pressure- relieving Devices in Refineries Part II— Installation 5th Edition, August 2003 Ballot 1Q106th Edition 2010 Std 521 (ISO 23251) Pressure-relieving and Depressuring Systems 5th Edition, January 2007 Ballot August 2011 (DIS) 6th Edition November 2012 (FDIS) Std 526Flanged Steel Pressure Relief Valves 6th Edition, May th Edition 2Q14 Std 527Seat Tightness of Pressure Relief Valves 3rd Edition, July 1991 Re-affirmed July Std 2000 (ISO 28300) Venting Atmospheric and Low-Pressure Storage Tanks Nonrefrigerated and Refrigerated 6th Edition, November 2009 (API adopt back); ISO release 2008 DIS June 2011December 2012

Standard/RPIssuesCost/Reliability Issues Std 520 Part ITask Force focused on RP 520 Part II None identified RP 520 Part IIWork on inlet pressure drop section Potential Cost Improvement - Potential revision and inclusion of 5% into inlet pressure drop criteria Std 521 (ISO 23251) Challenge to heat flux equations Potential Additional Cost – Work nearing completion where detailed equations based on CFD and test data can be used to validate existing simple methodology Std 526/527No issuesNone identified Std 2000 (ISO 28300) 1. In/Out Breathing – Working with SCAST with regards to equation revisions 2. Documenting the basis of the heat flux equations for sizing emergency venting 3. Deflagration venting 1. Potential Additional Cost – Clarifying text when to use equations in Annex A (past API 2000 equations) 2. Cost neutral - Work continues on heat flux basis 3. Potential Additional Cost – Working with SCAST to define when frangible roofs can be acceptable for venting vapors during internal deflagration

Projects 1.PERF PRV Stability Project evaluating multiple factors that could lead to instability (chattering) including inlet pressure drop –Plans to complete during 4Q10 –Data reviewed this week appeared random although not all test information has been analyzed 2.Heat Recovery Steam Generators (Waste Heat Boiler) in Sulfur Recovery Units –Breakout team – PRS working with HTE and Sulfur Expert –Focus is on pressure relief requirements to address tube failure