Mirror Lake Protective Association (MLPA) Part I REVIEW OF WATER TESTING PROGRAM, THE WOLFEBORO WASTEWATER TREATMENT FACILITY (WWTF) AND MLPA FUNDING EFFORTS.

Slides:



Advertisements
Similar presentations
Stormwater Rulemaking Briefing US Environmental Protection Agency.
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Approach for Including Nutrient Limitations within NDPDES Permits Dallas Grossman Division of Water Quality
Coles Point Wastewater Treatment Plant
Cost Effective Municipal ~ Commercial ~ Industrial ~ Residential Wastewater Treatment Solutions 1 Acti-Zyme.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Lessons Learned USDA Rural Development Funded Alternative Wastewater Systems.
BoRit Superfund Site Timeline
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Implementing A Section 319 Project During a Time of Regulatory Change The Catoma Creek Story Alabama Water Resources Association Conference September 2005.
Whatcom CWP Partnership Whatcom County Planning and Development Whatcom County Health Whatcom County Public Works Whatcom Conservation District Nooksack.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Amy Sheldon Watershed Coordinator February 3, 2004.
Connecticut Department of Energy and Environmental Protection.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
TMDLs on the Clearwater River Fecal Coliform Impairment of the Trout Stream Portion of the Clearwater River By Corey Hanson Water Quality Coordinator Red.
Watershed Planning: Current Status and Next Steps
Comprehensive Wastewater Management Planning (CWMP) Project Update for East Falmouth Watersheds Board of Selectmen Progress Meeting October 22, 2007 Nathan.
Working with Stakeholders in Developing Watershed and Water Quality Models: The Dos and Don’ts Well, at least some of them! Presented by: Brian J. Watson,
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
STATUS OF GREEN LAKE. Status of Green Lake Lake Management Plan Approved Lake Management Plan Approved Three Grants Awarded Three Grants Awarded.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Chesapeake Bay Policy Committee Meeting Bay Program Water Quality Goals: Focus on Funding Presented to COG Board of Directors September 10, 2003.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Great Bay Municipal Coalition New Hampshire Water Pollution Control Association June 13, 2013 Dean Peschel Peschel Consulting
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
Rapid Bioassessment Protocols for low gradient streams) for species richness, composition and pollution tolerance, as well as a composite benthic macroinvertebrate.
TMDLs on the Clearwater River Fecal Coliform Impairment of the Trout Stream Portion of the Clearwater River By Corey Hanson Water Quality Coordinator Red.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
1 Indiana Department of Environmental Management Budget Presentation FY
Northern Virginia Regional Commission MS4 Meeting March 17, 2011 Virginia Phase II Watershed Implementation Plan (WIP) Approach.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
New Mexico’s Nonpoint Source Management Program and Plan Revision.
Watershed Management Plan Summary of 2014 Activities/Progress Presented by: Matthew Bennett, MS December 2014.
New York’s Chesapeake Bay WIP
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Mulberry Watershed Management Plan
River Flow into Chesapeake Bay
Water Quality Improvement Projects and Engineering Planning Grant
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Managing urban watersheds
Indiana Department of Environmental Management Office of Water Quality
Presentation transcript:

Mirror Lake Protective Association (MLPA) Part I REVIEW OF WATER TESTING PROGRAM, THE WOLFEBORO WASTEWATER TREATMENT FACILITY (WWTF) AND MLPA FUNDING EFFORTS

WATER TESTING PROGRAM 1991-Spot Testing –NH Lakes Lay Monitoring Program volunteers began spot testing Mirror Lake’s waters.

September 2007 – Beach and Tributary Testing- Testing of the tributary from the Wolfeboro Wastewater Treatment Facility (WWTF) to Mirror Lake beach began. WATER TESTING PROGRAM (cont.)

August, 2008 –Lake Testing- The “Interim Testing Program” began, with weekly testing, at 6 sites in Mirror WATER TESTING PROGRAM (cont.)

August 24, 2007 – Cyanobacteria blooms were identified in waters at Lang Pond Road beach. August 12, 2008 – NHDES issues a cyanobacteria warning for Mirror Lake and cyanobacteria blooms continued throughout Mirror Lake beyond the summer swimming season

Conclusions: Mirror Lake has a serious cyanobacteria problem. A good deal of water testing data has been collected and professional guidance is needed to tell us how to address the cyanobacteria problem.

WOLFEBORO WASTEWATER TREATMENT FACILITY 1978 – NHDES issued permit to Wolfeboro for the WWTF, a slow-rate effluent system, which functions by spraying wastewater onto fields which then percolates into the ground April NHDES issued an Administrative Order citing Wolfeboro for violations of environmental regulations by “increasing the amount of phosphorus and nitrogen that is discharged into Mirror Lake.”

September 2007 –February 2008: In meetings and correspondence, MLPA requested that Wolfeboro: –Cease spraying effluent at the WWTF onto the fields that run into the tributary that feeds into Mirror Lake; and –Treat the effluent for the removal of phosphorus and nitrogen; and –Treat the high levels of phosphorus and nutrients in Abenaki Pond.

In numerous letters Wolfeboro responded to the MLPA: Admitting that parts of the spray field are in the Mirror Lake Watershed, but stating that only a small portion runs off the site and noting that the site is over 1.7 miles from Mirror Lake; and Stating that it had reduced the effluent spray onto the fields that run off the Abenaki ski area; and Stating that it had begun treating the effluent and that the phosphorus in the effluent had been reduced from about 4.0mg/l to 0.6mg/l [4000 ppb to 600 ppb]; and Denying that the WWTF is the cause of cyanobacteria in Mirror Lake; and Suggesting that septic system loads from the Mirror Lake Watershed and lake residences are a major contributor to the nutrient loads in Mirror Lake; and Stating that there are many potential sources of nutrients with in the Mirror Lake Watershed, including septic systems (old and new), logging operations, road construction, landscapes, etc.; and Stating that it has no intention of treating Abenaki Pond. In February 2009 WWTF, the spray fields were replaced by the Wolfeboro RIS. The effects of the new system on 19 Mile Brook is being monitored by the Tuftonboro Conservation Commission (the TCC”).

CONCLUSIONS/CONCERNS: Mirror Lake’s pollution problem is contributed to by the WWTF. The WWTF denies that it is cause of cyanobacteria in Mirror Lake. The soil at the WWTF site is saturated from years of spraying with excess nutrients. Therefore, it could continue to be a source of excess nutrients flowing into Mirror Lake. How do we convince Wolfeboro to assist us in remediation and restoration efforts

FUNDING EFFORTS August 2008-The MLPA applied to NHDES for a 2009 Watershed Restoration Grant for Impaired Waters and requested funding of $30,000 to hire an outside contractor to undertake an 18 month study of the causes and sources of pollution in Mirror Lake. October 2008 – NHDES rejected MLPA’s grant application because it failed to focus on a “watershed based plan” and provide “ specific milestones and performance targets”, NHDES suggested that we file again in 2009 for a 2010 grant under the “watershed-based plan for high-quality waters”. November 2008 –Meredith Village Savings Bank awarded MLPA a grant of $2,478 for the laboratory costs of the 2008/2009 Interim Testing Program.

FUNDING EFFORTS (cont.) February 2009 –MLPA, TCC and the Town of Tuftonboro applied to the Clean Water State Revolving Fund under the Stimulus Package for $464,200 to fund the: –Preparation of a diagnostic report and engineering analysis of the scope and sources of phosphorus overload in Mirror Lake; –Implementation of remedial efforts, including soil incineration at the site of the WWTF; and –the application of alum to Abenaki Pond and the stream that discharges into Mirror Lake. March 2009 – The DES advised us that the funding for the Stimulus Fund, if awarded, would available in the form of a 50% grant and a 50% loan, as well as other restrictions that did not seem attainable. The MLPA withdrew the application.

CONCLUSION: Notwithstanding our failure to obtain a grant from NHDES, they are still probably our best source for funds. If NHDES funding is sought, professional assistance is necessary to prepare the grant applications.

Part II NEEDS ASSESSMENT AND TIMELINE

NEEDS ASSESSMENT The following efforts will be required to restore Mirror Lake: a)Review MLPA’s existing testing data; b)Obtain and review water and soil testing data, permit violations data, discharge flows and other information collected by the NHDES and the Town of Wolfeboro at the site of the WWTF, and at various sites in the Mirror Lake Watershed, including the tributary that flows into Mirror Lake, to the extent possible; c)Develop and implement a site specific sampling plan to supplement the current water sampling programs, including field sampling in the Mirror Lake Watershed and its inlets; d)Identify the loading sources of nutrients in the Mirror Lake Watershed and quantify these sources;

NEEDS ASSESSMENT (cont.) e)Prepare a risk based analysis report assessing the ecological and human health risks and the extent of natural resource degradation and monetary damages to Mirror Lake stakeholders, and, allocate responsibility for same to the WWTF, as well as any other major contributors to Mirror Lake’s nutrient overload; f)Apply for one of two grants to NHDES to develop a Plan for Mirror Lake Watershed Restoration, which funding would include the costs of (a) through (e) above. The application would also include funding for the costs of determining appropriate source control, remediation and restoration actions; g)Apply for the second grant to NHDES for a Mirror Lake Watershed Management Plan, which would include a NHDES required Comprehensive Lake Inventory and Lake Management Plan, to fund the actual costs of implementing the source control, restoration and remediation action(s); and h)Attend meetings with the NHDES, Towns of Tuftonboro and Wolfeboro, as well community and lake residents, to inform, educate, advocate and seek cooperation and support, including, funding.

TIMELINE This timeline contemplates that a major funding source for Mirror Lake’s clean up will be the NHDES. The grant funding process dictates, to a large extent, the time line. Pre-Application is in August of each year and, if approved, supplemental information is filed in the winter with funding in the spring. NHDES grants are based on a 60/40 allocation, 60% is an outright grant and 40% must be matched by the residents. The 40% matching funds requirement can be met with monitory contributions, and with work performed by volunteers carrying out pollution prevention activities, education, fact finding, water testing etc. There is no guarantee that MLPA will receive the grant. All grant recipients have had professional guidance in the preparation of their applications and plans.

PLAN FOR SOURCE CONTROL, REMEDIATION AND RESTORATION The NEEDS ASSESSMENT can be accomplished in Four Phases.

PLAN FOR SOURCE CONTROL, REMEDIATION AND RESTORATION (cont.) Phase I: Summer 2009/Winter 2010 GOALS: Hire a local consultant to review existing data; identify additional data needs and prepare a Request for Proposal (RFP) in order to engage environmental consulting firm(s) to collect additional data and develop risk-based analysis report; and apply for first of two NHDES grants to fund cost of this fact finding and risk analysis

PLAN FOR SOURCE CONTROL, REMEDIATION AND RESTORATION (cont.) Phase II: Summer 2010/Winter 2011 GOALS: Environmental firms to undertake additional analysis of Mirror Lake and surrounding tributaries and sources MLPA members to undertake volunteer contributions including completion of the NHDES Comprehensive Lake Inventory and Lake Management Plan Environmental consultants to develop risk- based analysis report Apply for a second grant to NHDES, for a Mirror Lake Watershed Management Plan, which includes the Comprehensive Lake Inventory and Lake Management Plan, to fund the costs of implementing the source control, restoration and remediation action alternatives Meet with DES, Tuftonboro and Wolfeboro to review environmental firms findings and risk based analysis report Select and agree upon remedial/restoration alternatives

PLAN FOR SOURCE CONTROL, REMEDIATION AND RESTORATION (cont.) Phase III: Summer 2011/Winter 2012 GOALS: Apply for permits as required Implement restoration and remediation plans as outlined in the Lake Management Plan, including activities by Mirror Lake Watershed residents Phase IV: Summer 2012/Winter 2013 GOALS: Complete restoration and remediation plans Continue monitoring to gauge effectiveness of remedial action

Thank you