1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 12/10/2009 PHENIX WEEKLY PLANNING 12/10/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 3/4/2010 PHENIX WEEKLY PLANNING 3/4/2010 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
1 10/15/2009 PHENIX WEEKLY PLANNING 10/15/2009 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
1 2/25/2010 PHENIX WEEKLY PLANNING 2/25/2010 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
1 2/18/2010 PHENIX WEEKLY PLANNING 2/18/2010 Don Lynch.
1 1/14/2010 PHENIX WEEKLY PLANNING 1/14/2010 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch

2 2/11/2010 Install rack components in RPC3 N racksin progress2/28/2010 Attach cables to RPC3 N racks and to Detector ½ octantsin progress2/28/2010 Install blower for RPC3N thermal controlin progress2/28/2010 Send mass flowmeters out for recalibration (DC/PC, MuID, TOF.W)In Progress? AH Crane 110 switch for lockoutIn Progress6/30/09 Ongoing Tasks for Run 10 Task Start Date End Date Item Responsibility Status Item 1: ESRC relevant items completed Wood StairsPhillipsPost Start Update Work proceduresCirnigliaro,LynchPost Start Item 4: HBD Mock UpLynchAfter Run 10 Item 11: Fire Pull BoxPhilipsPost Start Item 12: Dumb WaiterLynch Waiting For LSC Response PHENIX Startup Checklist Status

3 2/11/2010 This Week Snow Maintenance Access postponed from snowy Wednesday to Friday: fix emCal FEM, if not fixed before then muon tracker FEM fixes and HVZ fixes change muTrg TLD's on south station-1 fix west carriage light HBD rack work Continue RPC3N electronics installation RPC3N blower test install RPC3S above MuID supports measurements Other DAQ work RPC3S drawings ready for CS Run 10 Tech support as necessary Continuing Preparation for 2010 Shutdown Continuing support for future upgrades

4 2/11/2010 Next Week: Lab Holiday 2/15 No Scheduled Maintenance Run 10 tech support as necessary 2010 summer shutdown prep continues Future upgrade support as necessary Prep for beampipe installation review

5 2/11/2010 CM central BP supports (2 req’d)

6 2/11/2010 South Flowerpot BP support

7 2/11/2010 North MPC Cavity BP support

8 2/11/ DOF (Y & Z) 1 DOF (Z) 0 DOF Kinematic mounts for mating east and west detector halves 6 interface points w/ HYTEC VTX Installation Plan

9 2/11/2010 VTX Support Structure Base Assembly Design In Progress

10 2/11/2010 RPC3 South Installation Plan

11 2/11/2010 Installing HO7E and HO5E RPC3 North

12 2/11/2010 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall and over door between control room and elect. ass’y room. General maintenance for Trailer Offices (in progress) Trailer Office Modifications planning in progress 2009 Building Maintenance Issues

13 2/11/2010 Run 10In progress6/1 VTX Fabrication and Installation Plan (1st Draft)Done RPC3 South Fabrication and Installation Plan (1 st Draft)Done Receive New BeampipeOn Order2/28 Design Beam pipe supportsIn progress1/29 Update RPC3 N design for RPC3 SIn progress2/26 RPC Factory Annual Safety ReviewDone Design support structure, alignment scheme for VTXIn progress2/12 Fabricate beam pipe supports2/195/1 Beampipe NEG coating (CERN)2/15/1 Fabricate/procure parts for RPC3 S installation3/15/1 Fabricate/procure parts for VTX installation3/16/1 End of run 106/1 Prep IR for shutdown6/17/1 Complete unfinished business for MuTrgr FEE & RPC3 North6/18/1 Install Beam pipe7/110/1 Install VTX8/110/1 Install RPC3 South6/110/ Shutdown Other Tasks6/111/ Tasks Start Date End Date

14 2/11/2010 PHENIX Procedure Review Current Status: 147 Procedures Identified 82 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 12 CAD procedures relevant to PHENIX, all are current and up-to- date. All currently under review, 3 to be de-activated 40 PHENIX approved procedures. 1 is currently under review 39 are current and up-to-date 13 Proposed/Draft Procedures (never previously formalized) New Spreadsheet Tracking Application to keep track of Procedure revisions and updates - Done and Working Web retrieval of latest procedures now available from PHENIX Internal:

15 2/11/2010 New Argon Dewar and Empty Gas Bottle Storage Area Pad for argon Dewar Pad for Empty Gas Bottles

16 2/11/2010 Safety, Security, etc. 1.CAD ES&H Group Safety Feedback Meeting- Snowed out CAD is holding meetings with various groups within CAD to get candid feedback of safety concerns and the implementation of safety policy Yesterday (Wed) Physics Support Group was Targeted PHENIX was invited. Reschedule date TBD 2.RPC Factory Annual Safety Review – last week - review went well waiting for action items (all minor) 3.Melted snow will refreeze tonight. Be careful driving and walking 4.JTA’s: some training that used to be one time (e.g. compressed gas safety) is now 3 year training. If this is or any other training is on your JTA and you feel it unnecessary let me know. 5. Traffic Safety: Year Accidents Injuries Total in parking lot, 5 weather related, 8 wildlife related: 19 multi-car collisions? 0.79 per month

17 2/11/2010 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: Monday is a Federal and New York State Holiday: George Washington’s Birthday Actual date: 2/11/1731 (Julian Calendar, but in 1752 Britain and all its colonies adopted the Gregorian calendar which moved his birthday to 2/22.) Made a fedreral holiday in 1879 [2/22] Celebrated: third Monday of February, since Can no longer land on 2/22. Sometimes referred to as Presidents’ Day this is technically incorrect unless you are in a state that so observe’s (e.g. MA, CT, AL, NJ). Which presidents are honored depends on the state. Anyway you look at it, the lab has it as a holiday and lab calls it President’s Day. (NY State celebrates Washington’s Birthday and Lincoln’s Birthday 2/12)