1 Postal Automation: Initiatives, Transitions & Best Practices Postal Automation: Initiatives, Transitions & Best Practices Part II.

Slides:



Advertisements
Similar presentations
® Flats Track for Periodicals, Catalogs & Printers Automating Flat Mail Preparation in the Future Anita Pursley – Worldcolor Brent Raney - USPS National.
Advertisements

New Address Standards for Commercial Flat-Size Mail
Pacific Area Customer Focus Dean J. Granholm Area Vice President Valley San Diego Sierra Coastal San Francisco Bay Santa Ana Los Angeles Honolulu Sacramento.
FSS System Overview ® PCC Workshop-in-a-Box Module 2 PCC Workshop-in-a-Box Module 2.
Mailers+4 The #1 Mailing Software in the Industry.
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
FSS / DPP PROGRAM OVERVIEW Flats Sequencing System & Delivery Point Packaging Status Update February 2005.
Postal Automated Redirection System (PARS) John Keegan Manager, Automation Equipment Engineering Mailers´ Technical Advisory Committee (MTAC) November.
Total Address Quality. Total Address Quality 2 OSV At A Glance OSV produces over 500 Million envelopes every year! OSV processes over 4 Million addresses.
New Address Standards for Commercial Flat-Size Mail.
® Flats Track for Periodicals, Catalogs & Printers Steve Forte Senior Vice President Operations, USPS Rosa Fulton Executive Director, FSS National Postal.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
OVERVIEW FOR 2011 NATIONAL CONVENTION NATIONAL STEWARD SYSTEM.
Background on USPS mail forwarding operations Overview of PARS
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
® TOTAL ADDRESS QUALITY & CASS ™ CYCLE “L” Ed WantaBaltimore PCC Address ManagementJune 1, 2007.
Picture Permit Imprint Indicia
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
National Postal Forum April 12, 2010 National Postal Forum ®
Greater New York Postal Customer Council
Peaking phase Falling phase Rising phase Bottoming phase Q U.S. office clock (overall) Source: Jones Lang LaSalle Los Angeles, Miami Dallas, San.
Improving the Drop Shipment Process MTAC Workgroup #87 Washington, D.C. January 30, 2008.
1 NETWORK STATUS MAILERS’ TECHNICAL ADVISORY COMMITTEE (MTAC) – 2/22/06 Paul Vogel Vice President, Network Operations Management U.S Postal Service.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
USPS New Address Requirements For Automation, Presorted And Carrier Route Flat-Size Mail Launch in Presentation Mode (Hitting F5)
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
New Mailing Services Prices – May 11, 2009 – Updated March 30 Greater Cleveland PCC April 24, 2009.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
U.S. Postal Service Areas By Customer Service Districts Western Great Lakes Northeast New York Metro Capital Metro Eastern Southeast Southwest Pacific.
Flats Sequencing System Update Mailers Technical Advisory Committee MTAC May 16, 2007 Mailers Technical Advisory Committee MTAC May 16, 2007.
Flats Sequencing System Update Mailers Technical Advisory Committee MTAC February 21, 2007 Mailers Technical Advisory Committee MTAC February 21, 2007.
® Flats Sequencing System Update Managers of Delivery Programs Support March 5, 2008.
Intelligent Mail February Vision Provide end-to-end visibility and a seamless process for mail acceptance and delivery, using standardized intelligent.
TECHNOLOGY IN THE U.S. POSTAL SERVICE Tom Day Vice President, Engineering.
MTAC – May 2006 Mailers’ Technical Advisory Committee Address Placement for Flats Sequencing System (FSS) Work Group #101 May 18 th, 2006.
1 Gary Reblin and Jan Caldwell Intelligent Mail & Address Quality Intelligent MAIL ™ in the U. S. Postal Service MTAC February 5, 2004.
POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)
State Mail User’s Forum March 25, Agenda Introductions New Customers New Mail User’s Guide USPS Rate Changes Move Update Full Service IMB Questions.
The Future of Presort MSMA August 15,2007 Alison HallDennis Shults General ManagerOwner Pitney Bowes PSI Presort Services KC Presort.
® Letter Automation History Bill Galligan Senior Vice President, Operations MTAC Meeting January 31, 2008.
New Address Standards for Commercial Flat-Size Mail.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009.
® Flats Sequencing System (FSS) November 20, 2008 Rosa Fulton Phil Fabrizio.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
Mailing Services Prices Mailers’ Technical Advisory Committee February 19, 2009 Maura Robinson VP Pricing.
FSS PREP AND ENTRY (WG #115) MTAC, August FSS Prep and Entry Workgroup #115 August 1, 2007 Joe Schick – Quad Graphics Rod Barbee – USPS Engineering.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
® FSS Update Rosa Fulton Executive Director, FSS MTAC General Session November 18, 2009.
® FSS Update Rosa Fulton Executive Director, FSS MTAC May 20, 2010.
® Intelligent Mail Measurement Readiness June 13, 2007 Full WG Meeting.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
MTAC Flats Sequencing Systems (FSS) New Area of Focus.
® Flats Sequencing System (FSS) February 2009 Cathy MoonPhil Fabrizio FSS Project Office MTAC Meeting.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
1 Operations’ Update Fall and Holiday Periods 2002 Mailers Technical Advisory Committee Meeting August 7, 2002.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Workgroup # 96 Developing An Interface To The AFSM 100 Automatic Induction Process POSTAL CO-CHAIR DAVE WILLIAMS INDUSTRY CO-CHAIR MIKE WINN.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
MTAC – November 2006 Mailers’ Technical Advisory Committee Address Location for FSS Work Group #101 November 1 st, 2006.
USPS Pricing October 24, 2011 | 12:30 – 1:30 pm Eastern Time
Palatine Cardiss Collins Boston Manchester Mid Island South Hackensack
Panel 2: Flats Containerization
New Address Standards for Commercial Flats
Presentation transcript:

1 Postal Automation: Initiatives, Transitions & Best Practices Postal Automation: Initiatives, Transitions & Best Practices Part II

2 Jack Widener Director, Finishing and Distribution Newsweek Rosa Fulton Executive Director, Flats Sequencing System United States Postal Service Panel Members Postal Automation: Initiatives, Transitions & Best Practices Joe Schick Director, Postal Affairs Quad Graphics Marc McCrery Manager, Operational Requirements & Integration United States Postal Service

3 Agenda  Flats Background  Flat Volume  Current Flat Operations  Delivery Vision  Flats Strategy  Flats Sequencing System (FSS)  Machine deployment and Schedule

4 Flat Volume Periodicals 17% First-Class 8% Standard 75% Standard 75% 53.2 Billion Flats FY 2006 (RPW) FY 06 Revenue From Flats: $16.7 Billion

Flats Processing / Handling Presorted to Carrier Route 58% Needs Processing 42% 53.2 Billion Flats FY 2006 (RPW)

6 Today’s Flats Processing AFSM 100 Automated Tray Handling Systems (ATHS) Automatic Induction (AI) UFSM 1000 Auto Flats Feeder Manual Keying APPS Flat Bundle Sorting

Flat Volume Delivery Unit Handling Saturation80%80% 20% Needs Casing By Carrier

8 Current Flat Operations  Up-the-Distribution Ladder  Carrier Route Processing  Customer Participation / Work-sharing  Increased Productivity  Centralize Distribution Operations  Standardization / Certification  Reduce Flat Mail Preparation / Handling  Substitute Technology for Labor

9 USPS Total Operating Costs: $71.9 Billion Delivery 43% Mail Processing 22% Support 0.9% Other Functions 9% Customer Service 16% Maintenance 6% Vehicle Services 2.4% Compensation 79% of Total Operating Expense

10 Delivery Strategy  Letters and Flats Sorted Separately  DPS Letter Sorting Continues  Flats Sequencing in Delivery Point Order  Saturation Mail Continues  Reengineer Our Processes for Handling “Residue Volumes”

11 Delivery Vision  Minimize Carrier In-office Time  Substitute Technology for Manual Carrier Casing Sequence Letters and Flats  Benefit from Street Opportunities  Carriers Start Street Delivery Earlier  Consistent Delivery Times  Manage Growth  Optimize Routes  Other Benefits  Delivery Day Visibility  Capture Real Estate Opportunities  Manage Vehicle Fleet

12 Flats Sequencing System (FSS) Automatic High Speed Feeders Dolly Induction Subsystem Carousel-style Sorter Tray Staging Integrated Tray Converters Mail Prep Subsystem

13

14 Increase Customer Applied Delivery Point Barcodes 11-digit 60% 9-digit 33% No Barcode 7% 5-digit <1% 2007 Flat Barcode Analysis Barcode sampling results - January 2007 ● Transition from 9-Digit to 11-Digit ● Move From 11-Digit to Intelligent Mail Barcode ● Intelligent Mail Barcode Available for Flats in Spring 2007

15 Improve Address and Barcode Readability  Standard Destination Address Block  Address Construction Improvements  Font Size, Horizontal and Vertical Character Spacing, and Extraneous Information  Barcode Location  Reduce OCR Return Address Reading Conflicts  CASS Certification™  DPV™

16 Standard Address Placement  Orient Address Location for Carrier Street Handling This could represent the front cover or back cover of the mail piece. Customer address and optional delivery endorsement can appear anywhere in the address zone (top third above the dotted line) when the bound edge is aligned to the right. Customer number, source code and messaging can appear anywhere on catalogs. John Doe 123 Main St Anywhere, USA John Doe 123 Main St Anywhere, USA Can face left or right John Doe 123 Main St Anywhere, USA Can be left or right justified, or centered. Bound edge on right John Doe 123 Main St Anywhere, USA Address orientation restrictions will be determined by the USPS (e.g., cannot read upside down when at the top) based on the needs of delivery. Implement MTAC Workgroup 101 Results

17 Maximizing Machine Efficiency  Match Mail Preparation Requirements to Processing Needs  Packaging, package and container make-up  Structure Rates to Support Sortation / Handling

18 Multi-phase Development / Deployment  Prototype – Indianapolis INApril 2006  BOG Approval of 100 FSS MachinesDec 2006  Pre-production Install – Dulles P & DCApril 2007  Pre-production – Live OperationsSept 2007  Production First ArticleJune 2008  Phase 1 Deployment BeginSept 2008  Phase 1 Deployment EndSept 2010

19 Phase 1 Deployment  100 FSS Systems  29 Districts  32 FSS Processing Facilities 26 Existing Processing Centers 7 New Facilities / Locations  1403 Zones  Systems per Facility

20 Phase 1 Deployment AreaDistricts # FSS Plants / Facility NYM Northern NJ Long Island NY Central NJ NJ BMC Mid Island NY P & DC Trenton NJ P & DC NE Boston Massachusetts Connecticut SE New England Northwest Boston P & DC Middlesex Essex P & DC Springfield BMC Providence RI P & DC EAColumbus3Former Columbus P & DC SE South Florida Atlanta Central Florida New Miami Facility Project Atlanta AMC North Metro GA P & DC Orlando P & DC WE Colorado / Wyoming Arizona Mid America Denver P & DC New West Valley (Phoenix) Facility Project Kansas City P & DC

21 Phase 1 Deployment AreaDistricts # FSS Plants / Facility PA Los Angeles Sacramento Bay-Valley/San Francisco Sierra Coastal Santa Ana San Diego Herb Peck Annex Sacramento P & DC San Jose P & DC Van Nuys Main Office New Aliso Viejo Facility Project New Perris DPC Facility Project CM Greensboro Northern VA Richmond Capital Raleigh P & DC Greensboro P & DC Dulles P & DC New Richmond Facility Project Curseen-Morris P & DC GL Greater Indiana Northern IL Central IL Southeast MI Indianapolis MPA Palatine P & DC Carol Stream P & DC Fox Valley P & DC South Suburban P & DC New Royal Oak Facility Project

22