THE MILESTONES OF MASS TRANSIT CS 410 Blue Group communicate 2Me.

Slides:



Advertisements
Similar presentations
IntelliDrive for Safety, Mobility, and User Fee Project Cory Johnson Mn/DOT IntelliDrive Program Engineer.
Advertisements

Presented by: Chakman Choi, Baradhwaj Hariharan, Uday Sankar Kandolath Date: 4/3/07.
School Management Tracking Solutions
GBA 573 Final Presentation Jonathan Stone Summer 2003.
ONE STOP THE TOTAL SERVICE SOLUTION FOR REMOTE DEVICE MANAGMENT.
T RANSPORTATION D ISADVANTAGED B EST P RACTICES & T RAINING W ORKSHOP “ Maximizing ITS investments to reduce operating costs and provide the best possible.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
1 This document and its contents are the property of The University of Iowa’s Public Policy Center National Evaluation of a Mileage- Based Road User Charge.
Network Design and Implementation
Mobile Resource Manager v2. Core Pillars  Engine - High fuel costs, vehicle maintenance  Productivity - Customers expect increasing levels of service.
Where’s My Shuttle? (.com) By David Mora and Matt Russell.
Rafiki Airways Online Booking and Check-in system.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Chapel Hill Transit Want to know where your bus is?
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Idea Execution Document for Making the Elevator Pitch
Xora GPS TimeTrack™ Take charge of your mobile workforce.
CS410 - BLUE GROUP Final Presentation communicate2Me.
Web Development Process Description
1 CS410 – Professional Workforce Development Orange Team Telephone Management System Final Presentation, 6 th May 2008 Presented by Benjamin Leyland Final.
Server Virtualization: Navy Network Operations Centers
Leveraging Technology to Increase Ridership and The Passenger Experience Jeff Lougheed Regional Manager Trapeze Group Mississauga, Ontario - Canada.
CS 410 – Blue Team.  Team Blue Staff Chart  Societal Problem  Problem Details  Traffic Data  Customer Identification  Market Analysis  Competition.
DiriPark Parking Guidance System Milestone Presentation Red Team — CS 410 Spring 2009 April 9, 2009.
Understanding the Do’s and Don'ts of Customer Relations Scott Wisner Customer Service Manager Valley Metro RPTA.
IPv4 TO IPv6 TRANSITION AND INTEROPERABILITY FOR TELECOM SERVICE PROVIDER Business Problem In today’s environment of growing connectivity where almost.
Copyright 2005 Agilis Systems, Inc. All rights reserved. intelligent Business Integration System Agilis Systems, Inc. Phone: (314) Fax: (314)
October 3, 2015 SILENCER 1 October 3, 2015 SILENCER 1 The Silencer Milestone Old Dominion University CS 410 Red Group.
Intelligent Transportation System (ITS) Project Update TAC - July 21, 2015 Nick Perfili, FCDOT Department of Transportation.
BusTracker: SmartPhone- based Mass Transit Tracking Steve Kopman 4/27/2011.
1 April 10, 2008 iSa – iTouch Speech assistant CS 410 Blue Team Brad Travalgio Dominic Eldridge Mark Mahn Matthew Salyer Scott Seto Scott Wood CS410 Blue.
Ensure your children's safety.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Redesigning the Website Matt “The Cat” Pittner Dr. Carl “Arizona” Rebman MSIT 573 Summer 2005.
U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012 Case Study LeeTran – Lee County, FL Mike Horsting, AICP 1.
1 05/05/08 iSa – intelligent Speech assistant CS 410 Blue Team Brad Travalgio Dominic Eldridge Mark Mahn Matthew Salyer Scott Seto Scott Wood CS410 Blue.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Abstract Traffic accidents often occur when a major athletic event or concert is held at Iowa State University. This is a result of drivers not being able.
Our goal is to make a web based multi-user organizer that can be accessed via cellular devices. There are three main component for this project: A main.
PRE-PROPOSAL MEETING RFTA Solicitation No Automated Vehicle Locator (AVL) & Computer-Aided Dispatch (CAD) System and Related Services.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Milestone Presentation CS 410 Red Team Presenters: Olga Stubbs, Adrian Clark 7 April 2005.
Bus Detection Device For The Passenger Using GPS And Gsm Application Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Camden County Travel Management Coordination Center Project Update Camden County WIB Board Meeting – March 26, 2008.
Traffic Management System Status Update February, 2008.
Chapter 12 The Network Development Life Cycle
Making Headways Smart Card Fare Payment and Bus Dwell Time in Los Angeles Daniel Shockley Fehr & Peers Julia Salinas Los Angeles Metropolitan Transportation.
Brian Cronin Federal Transit Administration ITSA Annual Conference May 4, 2005 Mobility Services for All Americans (MSAA) Foundation Research and Next.
GIS-Based Support System for On-Demand Flexroute Transit Service Brian Smith Priya Durvasula Stephen Brich Center for Transportation Studies University.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
DiriPark Parking Guidance System Project Approval Presentation Red Team — CS 410 Spring 2009 May 5, 2009.
December 13, G raphical A symmetric P rocessing Prototype Presentation December 13, 2004.
Thepul Ginige Lecture-5 Implementation of Information System Part - I Thepul Ginige.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
About Blacksburg Transit Started in 1983 Grown from 8 buses to 46 Grown from 3 routes to 12 Operator staff has increased from 26 part-time operators to.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Systems Analysis and Design in a Changing World, 4th Edition
Building Information Systems
TPF-5(181) Research Management Database Business Analysis
RTC RIDE Service Improvement Recommendations
CS 4360 Software Engineering
Presentation transcript:

THE MILESTONES OF MASS TRANSIT CS 410 Blue Group communicate 2Me

A Brief Overview The Problem Our Solution Evaluation Plan Four Phases o Staffing o Costs What is being provided and what is not Risks and their mitigation Funding/Budget Conclusion 2 April 9th, 2009 CS 410 Blue Group Spring 2009

Meet the Team April 9th, CS 410 Blue Group Spring 2009

Overarching Problem Passenger needs are not addressed by mass transportation systems. 4 April 9th, 2009 CS 410 Blue Group Spring 2009

The Wait Hampton Roads Transit (HRT) routes can have passengers wait anywhere from 30 minutes to an hour in suburban areas such as Chesapeake or Virginia Beach. Source: April 9th, 2009 CS 410 Blue Group Spring 2009

Inclement Weather & The Chase On average there is precipitation 115 days a year in Virginia. Source: Passengers not waiting in the designated bus stop areas are often overlooked by the bus driver. 6 April 9th, 2009 CS 410 Blue Group Spring 2009

Heavy Passenger Loads & Bus Bunching CS 410 Blue Group Spring 2009 In July, there are currently at least 55 festival events in Norfolk. Source: events/ events/ Routes like the Net in Norfolk and the Wave in Virginia Beach have buses running as close as 6 minutes apart. April 9th,

Missing the Bus Causes: Bus is Off Schedule Passenger Late Arrival to Stop Unaware of Real-time Schedules Driver Unaware of Awaiting Customers Effects: Schedule Problems Lower Passenger Appreciation Less Passengers Less Revenue 8 April 9th, 2009 CS 410 Blue Group Spring 2009

Regional Transit Need is Increasing CS 410 Blue Group Spring 2009 Hampton Roads has a population of 1.5 million By 2025, Hampton Roads is projected for 2.5 million Annual Ridership on HRT: 18.5 million Buses in the HRT System: 343 Average bus capacity is currently only at 15% Severe congestion is expected on 1,221 lane miles in Hampton Roads in 2026 Source: April 9th,

A Proposed Solution: communicate 2Me CS 410 Blue Group Spring 2009 Increase coordination of passengers and drivers by providing real time bi-directional information April 9th,

The Solution Real-time information for the driver such as:  Prioritization of stops  Number of commuters waiting at the next stop for their route Accessible and convenient to end users Reasonable cost for transportation companies 11 April 9th, 2009 CS 410 Blue Group Spring 2009

communicate2Me - The Solution April 9th, CS 410 Blue Group Spring 2009

A Feasible Implementation Passengers will be provided with methods to: Allow Stop Reservations via: o Personal Computer and Web Site o Cellular Phone / Short Message Service(SMS) Texting Have notifications of changes in schedule o SMS notification service o Result: Increases Coordination between driver and passenger 13 April 9th, 2009 CS 410 Blue Group Spring 2009

April 9th, 2009 Benefits CS 410 Blue Group Spring 2009 Passengers: Better Service More Interaction Greater Satisfaction Bus Drivers: Warning of Waiting Passengers Increased Awareness of Future Loads More Efficient Routes 14

Evaluation Plan Time o Measured against baseline project plan Cost o Measured against budget plan per phase Scope o Measured against requirements document Quality o Measured by customer and end user satisfaction April 9th, CS 410 Blue Group Spring 2009

{phase 0} - concept (60 days) Milestones Problem Area Development Feasibility Research Milestone Scheduling Website Development SBIR Proposals Acceptance Criteria Review Board Acceptance April 9th, CS 410 Blue Group Spring 2009

{phase 0} - organizational chart April 9th, CS 410 Blue Group Spring 2009

{phase i} - prototype (130 days) Milestones Prototype Specifications Test Plan User Manuals Proposal Prototype Construction Demonstration Acceptance Criteria Review Board Acceptance April 9th, CS 410 Blue Group Spring 2009

{phase i} - prototype components April 9th, CS 410 Blue Group Spring 2009

{phase i} - financials April 9th, CS 410 Blue Group Spring 2009

{phase i} - hardware requirements hardwareqty total SMS & Web Server1 $1,500 Software Development Workstation1 $2,000 Cellular Phones2 $800 overall hardware costs $4,300 April 9th, CS 410 Blue Group Spring 2009

{phase ii} - critical design (1 year) Milestones Web Interface Web Message Algorithm SMS Gateway Development Algorithm Development Algorithm Testing Transit Interface Interface Test Acceptance Criteria Interfaces with Google Transit Receives SMS Messages Passes Tests Connects with Transit Authority's Systems April 9th, CS 410 Blue Group Spring 2009

{phase ii} - organizational chart April 9th, CS 410 Blue Group Spring 2009

{phase ii} - major components April 9th, CS 410 Blue Group Spring 2009

{phase ii} - financials April 9th, CS 410 Blue Group Spring 2009

{phase ii} - hardware requirements hardwareqtycost Total SMS Server2$1000. $2,000 Web Server1$2000.$2,000 Algorithm Server2$2000.$4,000 SMS Service / Credits (yearly)1$36,000 overall hardware costs $44,000 April 9th, CS 410 Blue Group Spring 2009

{phase iii} - production & beyond Milestones Support Current Installations Improvement: Modifications to Interface Improvements to Algorithm Acceptance Criteria Market Penetration Market Acceptance Profitability April 9th, CS 410 Blue Group Spring 2009

{phase iii} - organizational chart April 9th, CS 410 Blue Group Spring 2009

{phase iii} - financials April 9th, CS 410 Blue Group Spring 2009

in the box Service to set up and maintain: o Short Messaging Service gateways o Web servers o Application servers Algorithm to communicate between end users and bus drivers April 9th, CS 410 Blue Group Spring 2009

not in the box Buses Wireless communication between buses and Transit Center Tracking system for buses (GPS, RFID) April 9th, CS 410 Blue Group Spring 2009

who is the customer? Initial customers: Transportation Hampton Roads Transit (HRT) Metropolitan Transportation Authorities Future customers (Phase III+) Shipping United States Postal Service (USPS) United Parcel Service (UPS) Other Services Cable Utilities April 9th, CS 410 Blue Group Spring 2009

price point April 9th, CS 410 Blue Group Spring 2009 Costs: Yearly Cost to Customer: $400,000 Customer ROI: Increases fuel mileage by 3%, saving $200,000 a year Increases choice ridership, leading to more customers

April 9th, 2009 current competition CS 410 Blue Group Spring

risks & pitfalls 1.Interoperability problems 2.Latency Issues 3.Abuse of the system 4.SMS message costs 5.Phone incompatibility 6.Transit operator ignoring system 7.Down Time April 9th, CS 410 Blue Group Spring 2009

risk mitigation Interoperability: Direct Communication with each Transit Authority's technicians Latency: Optimize Incoming SMS Processing Time Synchronize Driver Updates based on Position Abuse of the System: No way to mitigate without tracking passengers Transit Operator Ignoring System: Education Tracking of Requests to Pickups April 9th, CS 410 Blue Group Spring 2009

budget Funding Source: Department of Transportation o SBIR – Phase 1: $100,000 o SBIR – Phase 2 : $650,000 o SBIR –Phase 3: Small Business Loan/Venture Capatilists ! ?oppId=46140&flag2006=false&mode=VIEW April 9th, CS 410 Blue Group Spring 2009

cost to develop Phase 0: o Free Phase 1: o Hardware Resources - $4, o Personnel Resources - $14, Phase 2: o Hardware Resources - $44, o Personnel Resources - $443, Phase 3: o Hardware Resources - $37, o Personnel Resources - $286, Total - $829, April 9th, CS 410 Blue Group Spring 2009

breaking even April 9th, CS 410 Blue Group Spring 2009

closing statements Current Systems are One-Way: Informing the passengers, not Interacting with them. communicate 2Me promises to: Connect Passengers with Drivers, and Vice Versa Each phase is feasible in terms of: Cost Requirements Staffing let's do it! communicate 2Me April 9th, CS 410 Blue Group Spring 2009

Any questions? April 9th, CS 410 Blue Group Spring 2009