1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.

Slides:



Advertisements
Similar presentations
Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Plan For Tests of PA/tube at 2 nd Harmonic Frequencies Robyn Madrak C. Y. Tan.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Electrical & Control Power Supplies Trevor Hartnett.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LIU-SPS RF Power upgrade | 09 December 2015.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
MICE RF System Power Supplies, Control and Monitoring Status report
Overview of the RFCC Module and 201-MHz Cavity Design
MICE Target Report Video Conference 29/11/07
Status of the Front End Test Stand April 2007.
12 GHz High Power RF components requirements for CEA activities
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Y. Irie, KEK for the LOI collaboration
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC

2 Personnel Daresbury Laboratory RF and Diagnostics Group will provide three members to support the MICE Project; Andrew Moss – Senior RF engineer Joe Orrett – RF engineer Peter Corlett – RF engineer

3 RF System Discussions between the DL staff, Paul Drumm and Roy Church on the 6,7 th October agreed the initial thoughts on development of the MICE RF test stand The brief is to rebuild one 2MW amplifier to test the feasibility of the system to power the MICE RF system

4 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module LBNL CERN 300 kW Amplifier HT Supplies Los Alamos HT Supplies Daresbury

5

6

7 DL Support Areas Modelling –Extensive simulation tools Refurbishment –equipment from LBNL, CERN Design –Low level control electronics Recommissioning –Loaned equipment into a test stand

8 Modelling DL RF and Diagnostic Group has the capability to model RF systems using Microwave Studio and HFSS Aspects of the proposed RF system can be simulated and potential problems identified –A 2MW test load made from 4 50KW loads is a prime candidate for this process –Hybrid power splitters/circulators will also be modelled

9 Modelling example 1.3GHz power combining/splitting cavity modelled Low power test cavity manufactured at DL Simulation and testing agreed 99% Courtesy of Emma Wooldridge, ASTeC

10 Refurbishment We will be receiving equipment from various labs which, in most cases has not been in service for a considerable length of time. Upon arrival the following actions will be carried out; Inspection, each item will dismantled and inspected for mechanical and electrical integrity. Any remedial action required will be identified.

11 Mechanical/electrical refurbishment Refurbishment, mechanical items will be refurbished to an acceptable standard using the DL Workshop Facilities. Modification, it is likely that much of the electrical equipment will require some modification:- –Heater power supplies and controls –Cathode modulation system –HT supplies

12 Testing Testing, if practical, discrete components will be independently tested before being assembled into the RF System. –Coax sections –Matching devices –HT supplies –Low level electronic components

13 Design of Low Level RF electronics DL mainly works at 500MHz CW Many Interesting RF devices could be tested as part of the MICE program Hope to build and collaborate with RAL experience –Copy existing designs for time critical components –Use test stand to develop new ideas and solutions

14 Recommissioning Recommissioning is likely to be a challenging process! Old, out of service equipments being reassembled in a new system are bound to cause problems.

Circuit LBNL sending 4616 test stand Need to find one more driver for MICE

16 Electrical plant room location 415V plant room Large cooling supplies under floor area The area to be cleared Make use of Bund area? Overhead crane Large access doors

17 MICE equipment LBNL circuits should be arriving very soon CERN modulator for 2MW circuit, discussions continue 4616 LANL PSU, MOU under construction

18 2.5MW HT –A modulator from the CERN test stand has become available; this will provide 150A at 32KV at 1Hz 200uS. Discussions are in progress to see if this can be brought to DL I think the conclusion is that this will be useful to the MICE RF & DL will …

19 Heater –The heater runs at 17V 450 amps, the psu should come with the equipment, but might need to be refurbished. RAL have a new design for this. Running the heater to high will result in a considerable reduction in lifetime for the tube. Back heating of the tube heater may occur from the RF drive!

20 Ion pumps –The circuits use 5KV varian Ion pumps, which are used on site at DL Safety issues –At RAL no X Ray problems have been found in running the tubes, –Tests at DL will need to be carried out by Heath Physics as soon as HT is applied to the tubes.

21 Test Load –a coaxial 4-way splitter and four 50KW loads: model various arrangements and purchase commercially available equipment. TH170 –If the TH116 proves an unsuccessful candidate, CERN use TH 170 tubes for a similar power level, however the input impedance of these tubes is dramatically different and the 170 needs a tuning stub, CERN will be able to help with this. –Anode dissipation of the tubes is 50KW and 10KW for the 116 & 170 respectively. –Conditioning of these tubes could take up to a day. Reduced HT and low drive levels are needed to slowly bring tube up to full power. Resonance effects can be cured by using ferrite absorbers in the output cavity and resistor/capacitor networks on the drive connections Drivers –Manufactured by Burle industries a test stand for the 4616 will be included in the shipment from Berkley as well as 3 circuits (a forth will be needed), Burle are supposed to be finding drawings of the circuits used at Berkley. –The tubes should come with all the systems ready to drive them, heater, grid and HT psu’s, and input/output matching sections, but extensive refurbishment will be needed. HT –The 18KV psu for the HT is currently at LANL, PD is liaising with John Lyles over an MOU. The tube is operated with DC HT and pulsing the screen grid, JL has a design using mosfets to do this. Screen grid psu information is available from Burle.

22 As yet there is no news of the shipment –Hope to know before end of week –and hopefully, tomorrow!