Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.

Slides:



Advertisements
Similar presentations
WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Advertisements

TIM MASON RENEWABLE RESOURCE INTEGRATION IEP ASSOCIATION ANNUAL MEETING FALLEN LEAF LAKE 5 October 2011.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
Impact of Variability on Control Performance Metrics James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University 1.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Integrating Renewables Gloria Godson Energy Bar Association December 3,
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Document number DNV KEMA KERMIT Overview ERCOT Joint Regional Planning Group / Long Term Study Task Force Austin, TX October12,
Aaron Townsend National Renewable Energy Laboratory October 28, 2013 Colorado Rural Electric Association Energy Innovations Summit Energy Storage in the.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
Emerging Technologies Integration in ERCOT 2012 ERCOT Operations Seminar Mark Bruce Principal Stratus Energy Group.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Operations Update ERCOT Board Meeting March 18, 2003.
Synchronous Inertial Response
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Aidan Tuohy EPRI Grid Ops and Planning Iowa State University.
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Minnesota Renewable Energy Integration and Transmission
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Overview of New Control Room Desk
Energy and Ancillary Services Design Stream Working Group Meeting 6
penetration of wind power
EU-IPA12/CS02 Development of the Renewable Energy Sector
Key Findings and Resource Strategy
30 Minute Reserves EPFSTF January 4,
EE379K/EE394V Smart Grids: Ancillary Services
RE Grid Integration Study with India
Sandip Sharma ERCOT Manager, Operations Planning
Forecasting and Operations
Presentation transcript:

Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process

2 Motivation ERCOT’s transmission planning processes so far relied on generation expansion tools (Market Power), production cost simulation tools (PROMOD, UPLAN) and tools for AC analysis (PSS/E, PowerWorld). These tools do not capture intra-hourly production variability of the renewables and ability of the future generation fleet to maintain system frequency at all times. Planning scenarios with high share of renewables may require higher operating reserves to achieve acceptable frequency performance. Consideration of higher operating reserves impacts unit commitment and dispatch. It may also impact generation expansion in a scenario. Need for a new tool that would capture: ̶Renewable power production uncertainty and variability; ̶Relevant ERCOT market and operation processes.

3 Integrating Renewables / KERMIT analysis ERCOT procured KEMA’s Renewable Market Integration Tool (KERMIT), for assessment of operating reserves needed to balance generation portfolios with increasing share of renewables. KERMIT is Simulink/Matlab/Excel based platform. Models generation fleet, load and renewable variability, generation and system frequency control actions (governor response, AGC). Simulates second-by-second system operation, for 24 hour horizon. Provides an assessment of a power system’s ability to achieve adequate balancing and maintain system frequency.

4 Relevant ERCOT Processes and Modules in KERMIT Governor response Regulation (AGC) SCED Unit Commitment Inertia response First few seconds seconds 20 seconds to 5 minutes every 5 minutes Every hour KERMIT Modules Separate Module outside of KERMIT

5 Metrics to use for reserve adequacy analysis For planning scenarios, real time operation can be simulated with KERMIT for representative days in a year. The following metrics can be used to assess reserve adequacy of future generation scenario: Sufficiency of available resources to balance renewables and load variability; System frequency second to second; Compliance with NERC’s Control Performance Standard 1, (CPS1 ≥ 100%), If reserve adequacy is not established, higher reserve requirements should be added in production cost simulation and study needs to be re-ran.

6 Scenarios studied in KERMIT as a part of DOE LTS Scenario 3 (S3) – BAU all Tech −18 GW Wind & 2.5 GW Solar −Year 2022 Scenario 8 (S8) Environmental with DR/EE mandates, −50 GW Wind & 1.5 GW Geothermal −Year 2016

7 Results of Reserve Adequacy Study for Planning Scenarios The results from the KERMIT study show: Unit commitment in both scenarios does not have sufficient dispatchable capacity to follow 5-minute to 5-minute net load ramp-ups in spring and autumn months (low load/high wind situations); In both scenarios without additional reserves, NERC Reliability Standard is not fulfilled (CPS1<100%); Hypothetical reserve with 0 start up time and ramping capability of 800MW/5min (S3) and 1300 MW/5min (S8) was added to achieve CPS1 score similar to the current situation; Seldom-occurring high-magnitude net load ramps call for significant increase in deployments of existing quick-start/non-spin reserves. In S8 at low load/high wind conditions, conventional generators are dispatched close to minimum and are not able to follow 5-minute to 5-minute net load ramp-downs. Wind energy curtailment.

8 Results of Reserve Adequacy Study for Planning Scenarios Actual Reserves 2012 Initial KERMIT RunScenario 3Scenario 8 MinMax Spinning/Reg up RRS New 5 min product Non Spin QS (15 Min Product) - 5 min start, 10 min ramp minute product (cold) Total

9 Impact of the assumptions Only normal operation was studied with KERMIT for the future scenarios. Scenarios with large amount of renewable (non-synchronous) generation may lead to unacceptably large frequency deviations during generation outages. This may become a limiting factor on share of renewables that can be reliably integrated in the ERCOT system. The study was based on the assumption that ERCOT electricity market design will remain unchanged. More frequent deployment of non-spinning reserves and intra-day unit commitment compared to current situation may call for changes in market design and/or Ancillary Services products.

10 Conclusions ERCOT has recently improved the planning process to include the impact of high renewables on the system. In both studied scenarios the system needs more reserves through a new 5 min AS product or increase in Regulation Reserve requirement. There are a few but highly impactful high magnitude ramps caused by renewables Curtailments will be necessary to maintain system reliability in low load/high wind situations Simulation of generator outages in KERMIT may put additional restrictions on amount of renewables in ERCOT system and will be studied in the future work.

11 Appendix: Planning Process Yes No Future generation mix scenario Production Cost Simulation (PROMOD) Is solution feasible? Transm. violations? Results Transm. upgrades Yes No New sub-process in a Long Term Study

12 Appendix: Unit Commitment -> SCED Module -> KERMIT Load 5-min Wind, 5-min Hourly Gen. Dispatch 5-min Dispatch Wind Curtail. KERMIT (Inertia, Gov. resp. AGC) Load, 1-sec Wind, 1-sec Gen. Outputs Frequency UC SCED Varia- bility Hourly Load Varia- bility Hourly Wind 1 hour resolution 5 minute resolution 1 second resolution

13 Appendix: KERMIT Load (1-sec) AGC Freq. change Conv. Plants Renewables Load RRS  ΔfΔf ΔP Reg ΔfΔf ΔfΔf P BP P Renew PGPG P RRS P Gen P BP Renew. (1-sec) P Load P Renew. SCED (5-min) P BP ΔfΔf Storage ΔfΔf P Storage

14 Appendix: DOE LTS Scenario Examples Economic assessments performed as part of the DOE study suggested increasing proportions of wind generation on the ERCOT system. We needed to assess the adequacy of operational reserves for increasing proportions of wind and solar generation. S3, 2022, 7GW of new wind, 2.5 GW solar S8, 2016, 39 GW of new wind

15 Appendix: Scenario 3 (BAU All Tech with New Wind profiles) DescriptionUnits CC AddsMW 1,600 2,000 CT AddsMW 1,190 1,700 1,360 1,700 Coal AddsMW Nuclear AddsMW CAES AddsMW Geothermal AddsMW Gravity Power AddsMW Solar AddsMW 1,500 1,000 2,000 1,000 2,500 Wind AddsMW 300 1,886 4,782 2,291 3,818 3,778 Annual Capacity AdditionsMW 1,490 4,986 8,972 5,991 6,178 9,978 Cumulative Capacity AdditionsMW 1,490 6,476 15,448 21,439 27,617 37,595 RetirementsMW Residential Demand ResponseMW Industrial Demand ResponseMW Reserve Margin%0.00(0.80)(2.37)(1.95)(4.00)(4.35) Coincident PeakMW 80,104 83,588 88,083 90,677 94, ,744 Average LMP$/MWh Natural Gas Price$/mmbtu Average Market Heat RateMMbtu/MWh Natural Gas Generation% Coal Generation% Wind Generation% Solar Generation% Scarcity HoursHRS Unserved EnergyGWhs SO2Tons 356, , , , , ,409 CO2(k) Tons 246, , , , , ,536 NOxTons 276, , , , , ,963

16 Appendix: Scenario 8 (Environmental Base) DescriptionUnits CC AddsMW CT AddsMW ,210 Coal AddsMW Nuclear AddsMW CAES AddsMW Geothermal AddsMW 1, Gravity Power AddsMW Solar AddsMW , ,500 Wind AddsMW 38,901 8,768 5,260 8,167 3,523 5,845 Annual Capacity AdditionsMW 40,401 10,268 21,360 8,667 4,703 9,555 Cumulative Capacity AdditionsMW 40,401 50,669 72,029 80,696 85,399 94,954 RetirementsMW - 6,938 14, Residential Demand ResponseMW Industrial Demand ResponseMW Reserve Margin% 5.07 (5.10) (16.05) (16.95) (18.91) (19.86) Administrative UnitsMW , ,970 Coincident PeakMW 80,104 83,588 88,083 90,677 94, ,744 Average LMP$/MWh Natural Gas Price$/mmbtu Average Market Heat RateMMbtu/MWh Natural Gas Generation% Coal Generation% Wind Generation% Solar Generation% Scarcity HoursHRS Unserved EnergyGWhs SO2Tons 217, ,720 23,108 23,003 21,436 21,696 CO2(k) Tons 148, ,939 86,273 83,035 86,014 90,442 NOxTons 171, ,730 83,051 80,534 83,277 86,848

17 Appendix, new wind projects in S8 (2016) ZoneMW NORTH NORTH CE 766 WEST SOUTH CE 200 SOUTH Austin 601 Dallas 776 Total38 900

18 Appendix, new wind projects in S3 (2022) ZoneMW NORTH 4792 NORTH CE 205 WEST Total Wind (7 GW) Solar (2.5 GW) Gas (17.9 GW)

19 Studied scenarios, S3 and S8 S3, 2022 (18 GW wind & 2.5 GW solar) Renewable Production, MW Renewable contrib. of load, % Load, MW Date, Time Max renew. hour % /08, 11 am Min load hour % /28, 2 am Max renew. contrib. hour % /08 4am S8, 2016 (50 GW wind & 1.5 GW geoth.) Renewable Production, MW Renewable contrib. of load, % Load, MW Date, Time Max renew. hour % /2, 3 pm Min load hour % /15, 5 am Max renew. contrib. hour % /22, 2am

20 Appendix: Integrating Renewables / KERMIT Study May 21, 2013

21 Appendix: Integrating Renewables / KERMIT Study May 21, 2013

22 Appendix: Results of Reserve Adequacy Study for a Planning Scenario May 21, 2013