Copyright © 2010ZPM Solutions. All rights reserved. Maintenance Plan Optimisation.

Slides:



Advertisements
Similar presentations
DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Advertisements

Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Maintenance At Your WWTP August 2010
Reliability and Safety Lessons Learned. Ways to Prevent Problems Good computer systems Good computer systems Good training Good training Accountability.
2002 Conference & 8th Annual General Meeting Maintenance System with DeviceNet Presented by Tai Tateishi for OMRON Maintenance System with DeviceNet Masaru.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Internal Control & Cash Chapter 8.
Project Management Presented by:
Project plan for ITIL implementation
WP Inc. Case STUDY 3.1 Problem Solving Jonathan Stanley & Kari Eddings
©2015, College for Financial Planning, all rights reserved. Session 17 & 18 Peer Support in Building Your Plan CERTIFIED FINANCIAL PLANNER CERTIFICATION.
Project plan for ISO implementation Subtitle or presenter.
Top 10 Tips To Keep Parents Sane ! Designed by Cena Block “ The Mom-Preneur Clarity Catalyst” Owner of Sane Spaces Organizing & Productivity Consulting.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Managing Material Demand for Preventive Maintenance.
Collecting, processing and using… The Importance of Data.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Establishing an Effective Maintenance Program The Mechanics Need Your Help.
Ch 1: The Scope of Software Engineering
Copyright © 2010ZPM Solutions. All rights reserved. Shop Paper Attachment Printing.
Copyright © 2013 Kaeppel Consulting LLC. All Rights Reserved Benefits of Project Management Discipline Applied to Your Work Scott Kaeppel Owner, Kaeppel.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Chapter 4 Performance Management and Appraisal
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Web: tel: +44 (0) IEB Asset Maintenance System.
Web: tel: +44 (0) IEB Asset Maintenance System.
Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench.
Gain control and visibility of your utility usage with smart metering. Our scalable solutions and services enable the advanced monitoring and optimisation.
Right First Time 1 Method 1 on the Shop Floor. Right First Time 2 When should we use Method 1? Excellent starting point for most investigations. When.
Copyright 2014 © W. Seth Hunter ConsumerMath.org L2.1 Payments, Rents, and Utilities I get paid weekly, but pay bills monthly. How can I be sure I am not.
Copyright © 2011 Pearson Education, Inc. All rights reserved. Changing the Control of a Behavior with Fading Chapter 9.
Copyright © 2010ZPM Solutions. All rights reserved. Annual Estimate Review.
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Data Processing & Data Quality. A virtuous cycle The implicit assumptions underlying information systems are twofold: first, that good data, once available,
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Chapter 12 Implementation and Maintenance
Copyright © 2008 First Steps Training & Development, Inc. All rights reserved. Coaching for Results Confrontation Skills Presented by:
TIME CARDS & APPROVAL. Timecard Approval Daily approval Do not approval future dates Review leave balances & timecards before approving Review the timecard.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
Economic Justification. Good Enough Quality Time to market Time to market Time to profit Time to profit.
Best in Class 15 % 5 % 80 % 100 % Reactive / Deviation work Too little, too late 60 % 20 % 100 % Industry Average Non-value added Too much, too early Base.
Copyright © 2012 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Chapter 13: Systems Analysis and Design Steps in programming.
Google Search Appliance (GSA) & HIP Feasibility Review October 29, 2008.
System Analysis and Design Copyright © Genetic Computer School 2007 SAD14-1 CHAPTER OVERVIEW  Overview Of System Maintenance  Tasks Performed During.
Copyright © 2011 Pearson Education, Inc. All rights reserved. Getting a New Behavior to Occur with Shaping Chapter 10.
Added Value manufacturing  Neil Towers. Market winners and qualifiers 
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Copyright © 2007, Decision Support Solutions. All rights reserved. 1 SAS ® Resources (Trying to find what you want) Alan Tsuji Consultant: Decision Support.
Study Habits That Work for You Lesson 3, Chapter 3 SAI.
Multiplication Timed Tests.
CPMGT 300 Week 2 DQ 2 Check this A+ tutorial guideline at 300/CPMGT-300-Week-2-DQ-2 What types of risk planning,
BIG DATA Initiative SMART SubstationBig Data Solution.
Maintenance strategies
Symptoms of a Bad or Malfunctioning Throttle Body
Copyrights apply.
Project plan for ISO 14001:2015 implementation
SDLC Model A framework that describes the activities performed at each stage of a software development project.
توكيد الذات.
Fifalde Blueprint for Success
Project plan for ISO 9001 implementation
Reducing costs, optimising availability
Two methods to observe tutorial
copyright ALL RIGHTS RESERVED. 4/12/2019 copyright ALL RIGHTS RESERVED.
Martin Shaw – Reliability Solutions
Warmup Chapter P Review
Unit 1 Fundamentals of IT
The Database Development Process
Presentation transcript:

Copyright © 2010ZPM Solutions. All rights reserved. Maintenance Plan Optimisation

Are you Scheduling your Preventive Maintenance at the right time? Do you how to? Stop wasting money by Over-Servicing Stop risking reliability by Under-Servicing Annual Estimates inaccurate Not enough Measurement Documents Copyright © 2010ZPM Solutions. All rights reserved. Call Horizon too big or too small Do you know the pitfalls? Deadline Monitoring Variants set up incorrectly Or are you just avoiding using Counter Based Maintenance Plans? Not confirming your last PMs correctly Structuring your PMs incorrectly Not using Shift Factors

ZPMSolutions has the Solutions!!! Consulting Services Training Materials Reporting Solutions Documented and Working Examples Copyright © 2010ZPM Solutions. All rights reserved. Enhancements to catch errors Measurement Document Reality Checks Block TECO when no recent Measurement Documents exist Includes for Measurement Documents on Shop Papers Business Processes