Civil Works Progress ADB Loan No. 2373-CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak)

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

Metro Muncipal Agreement Program
PRESENTATION ON TURNKEY CONSTRUCTION.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Hubbard County, Minn. Classification and Compensation Study Update GREG MANGOLD| AUGUST 5, 2014.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Presentation on NR3 Road Maintenance Contract
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
PowerPoint Presentation by Charlie Cook Part III Formulation of the Entrepreneurial Plan C h a p t e r 12 Introduction to Entrepreneurship, Ninth Edition.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
GMS: Southern Coastal Corridor Project HIV/AIDS and Trafficking Awareness and Prevention Program ADB- LOAN No.2373-CAM (SF) Implemented by SP: Supervised.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Constructionsite Roles in Construction Ron Gatepain.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Progress of Environment Safeguards ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP.
PLANNING AND SCHEDULING
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2014 till March 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Specification & Quantities Estimating
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
Administration Update Nicola Webb Hertfordshire County Council Hertfordshire County Council HERTFORDSHIRE PENSION FUND.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
North-East Northamptonshire Project Highlight Report No. 5 Period January 2015 Thursday February 5 th 2014.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2013 till March 2014.
Demolition Management and Monitoring Contract Update December 13,
Overview of Grant Agreements - Agreement Process - Roadmap to the Agreement Document - Agreement Requirements/ Compliance Issues - Timelines for Reporting.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Periodic Reporting Europe and North America Progress report and future strategy 11 March 2004 Information Meeting UNESCO Headquarters.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Boulder Junction Town Road Improvement Project
Pre-contract Planning and Practice
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Welcome! Hodgson Middle School Parent Information Night
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Manajemen Konstruksi Bidding & Award
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
doc.: IEEE <doc#>
State Aid Construction
Richland Creek Water Supply Program Program Update
Provision of HR Services, UNOPS Nepal
BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

Civil Works Progress ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak) Development of CBF (4.02 Ha Lork-Kampot)

MPWT/PMU3 Mr. Chhin Kong Hean Project Coordinator Mr. Pheng Sovicheano Project Director Mr. Sar Vutha Project Manger Egis International CS Consultant Mr. Andre Drockur Project Manager Mr. Khagnh Sitnarit Highway Engineer/NTL Lim Sarin & SWEE JV CW1 Contractor Mr. Ung Kotaro Project Manager CDOH (SP) Mr. Bun Meng Communication Specialist Kuy Leang Ky CW2 Contractor Mr. Khoun Chamroeun Project Manager

Table of Content 1.Project Location MapProject Location Map 2.Overall Project Completion RateOverall Project Completion Rate 3.Summary of Civil Work Progress of NR33 (CW1)Summary of Civil Work Progress of NR33 (CW1) 4.Summary of Civil Work Progress of CBF (CW2)Summary of Civil Work Progress of CBF (CW2) 5.Summary Civil Work Progress of NR3 (CW3)Summary Civil Work Progress of NR3 (CW3) 6.Summary of Progress Activities of the CSCSummary of Progress Activities of the CSC 7.Detailed Information of NR33 – CW1Detailed Information of NR33 – CW General Contract DataGeneral Contract Data 7.2. Physical Work Progress up to March 2012Physical Work Progress up to March Payment and disbursement up to March 2012Payment and disbursement up to March Contractor’s Cash Flow Forecast up to March 2012Contractor’s Cash Flow Forecast up to March Contractor’s Work Program and Progress up to March 2012Contractor’s Work Program and Progress up to March Progress Feature up to March 2012Progress Feature up to March Detailed Information of CBF – CW2Detailed Information of CBF – CW General Contract DataGeneral Contract Data 8.2. Physical Work Progress up to March 2012Physical Work Progress up to March Payment and disbursement up to March 2012Payment and disbursement up to March Contractor’s Cash Flow Forecast up to March 2012Contractor’s Cash Flow Forecast up to March Contractor’s Work Program and Progress up to March 2012Contractor’s Work Program and Progress up to March 2012

1. Project Location Map

2. Overall Project Completion Rate

3. Summary of Civil Work Progress of NR33 (CW1) -Contract for Civil Works A.1-Improvements of NR33 (Contract No. SCCP-CW1) with Contractor Lim Sarin Co., Ltd and SWEE Construction & Transport Co., Ltd, Joint Venture and the MPWT has been signed on 20 May 2011.The Contractor’s Project Director and Contractor’s Project Manager have been appointed and approved by PMU3 and the CSC. -Physical accomplishment during the reporting month was 6.3 %, which is behind the Contractor’s schedule which was 6.73 % (Variance: %), with an overall accumulated accomplishment of % against scheduled % (Variance: %). -(i) Re-survey by CSC’s and Contractor’s survey teams completed 100%, (ii) UXO and demining works completed 100%, (iii) Renovation/refurbishing of Site camp for the Engineer 100% completed, (iv) Maintenance of existing road completed 40%, (v) Clearing & grubbing completed 93%, road way excavation completed 90%, embankment completed 77%, sub-grade completed 41% and overall structures works completed 16%.

4. Summary of Civil Work Progress of CBF (CW2) -Contract for Civil Works A.2-Development of Cross Border Facilities (Contract No. SCCP-CW2) with Contractor Kuy Leang Ky Co., Ltd Construction Trading Group Co., Ltd and the MPWT has been signed on 25 November Physical accomplishment during the reporting month was 1.46 %, which is behind the Contractor’s schedule which was 4.01 % (Variance: %), with an overall accumulated accomplishment of 6.2 % against scheduled 8.79 % (Variance: %). -(i) Possession of Site and Notice to Commence the Works have been issued to CBF Contractor on 13 December 2011 and 23 January 2012, (ii) Re-survey by CSC’s and Contractor’s survey teams completed 100%, (iii) UXO and demining works completed 100%, (iv) Renovation/refurbishing of Site camp for the Engineer completed 100% and Preliminary works completed 48%, (v) Perimeter security fence completed 52%, clearing and grubbing completed 75%, removal of unsuitable materials completed 30% and RC piles completed 40%.

5. Summary Civil Work Progress of NR3 (CW3) Contract No.SCCP – CW3 Contract NameMaintenance of NR3, Kampot to Veal Rinh Type of works, Section and Length  Quantity and unit-priced maintenance works on road section Km to Km (22.55km).  Performance/output based routine maintenance for two years on two sections: Km to Km (12.3km) and Km to Km (21.45km). CSC Consultant Egis International in association with KACE, KCC, KCEC, SBK and VIDO. Draft Bidding Documents submitted to MPWT 04 November 2011 ADB comments on the Draft Bidding Documents 06 January 2012 Response to ADB regarding their comments 17 January 2012 ADB approval on the response20 January 2012 Bidding procedureNational Competitive Bidding Invitation for Bids advertised25 January 2012 Deadline for Bids submission16 March 2012 Pre-bid meeting08 February 2012 Bid evaluation to PMU320 April 2012 Expected Award/sign Contract15 June 2012

6. Summary of Progress Activities of the CSC -Consulting Services C.1- Construction Supervision Consultant (CSC) commenced on 23 May CSC’s Project Manager (Andre Drockur) has been appointed and approved by PMU3. -(i) Conducted several joint site inspections and coordination meetings (Monthly Coordination Site Meetings were conducted regularly for both CBF project and NR33) and (ii) CSC has re- activated and continues updating the project website and finalized forty four (44) deliverable reports and up-loaded to the project web site, (iii) Attended and monitored all activities related to Social Safeguard Compliance, (iv) Review/Evaluation/Approval of NR33 and CBF Contractor’s documents, (v) Reviewed Contractor’s claims of NR33 and CBF (prepared V.O. No.2 for NR33), (vi) Continued working on the budget and cost estimate of proposed SCCP’s additional projects: 1- Revised cost of all buildings for SCCP-CW2, 2- Revised cost estimate for Covered Walkway and building N0. 10, 3- Office Furniture and Equipment for Cross Border Facilities, (vii) CSC just completed the bid evaluation report for the Maintenance of NR3 Kampot-Veal Rinh, etc.

7. Detailed Information of NR33 – CW General Contract Data

7. Detailed Information of NR33 – CW Physical Work Progress up to March 2012

7. Detailed Information of NR33 – CW Physical Work Progress up to March 2012 (Continue)

7. Detailed Information of NR33 – CW Payment and disbursement up to March 2012

7. Detailed Information of NR33 – CW Contractor’s Cash Flow Forecast up to March 2012 (including proposed Contract Variation Order No. 2)

7. Detailed Information of NR33 – CW Contractor’s Work Program and Progress up to March 2012

7. Detailed Information of NR33 – CW Progress Feature up to March 2012

8. Detailed Information of CBF – CW General Contract Data

8. Detailed Information of CBF – CW Physical Work Progress up to March 2012

8. Detailed Information of CBF – CW Physical Work Progress up to March 2012 (Continue)

8. Detailed Information of CBF – CW Payment and disbursement up to March 2012

8. Detailed Information of CBF – CW Contractor’s Cash Flow Forecast up to March 2012

8. Detailed Information of CBF – CW Contractor’s Work Program and Progress up to March 2012

THANK YOU