1 MICE Report to the CMPB February 2008 Ken Long, Andy Nichols and Richard Apsimon 22nd Feb 2008 1.Project Manager’s Report 2.Project Status, risks and.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE Video Coference Project Manager Report Contents: Technical organisation of project Target and upstream beamline Muon beamline Infrastructure and.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS 
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, DL, 4 th -7 th June 2008.
1 MICE Report to the Oversight Committee February 2008 Ken Long, Andy Nichols and Richard Apsimon 25th Feb 2008 MICE Phase 1 Status MICE Phase 2 Overview.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
MICE Target Report Video Conference 29/11/07
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 MICE Report to the CMPB February 2008 Ken Long, Andy Nichols and Richard Apsimon 22nd Feb Project Manager’s Report 2.Project Status, risks and schedule 3.Financial status

2 Conclusions and principal issues: Conclusions:  The increase in the pace of the MICE-UK project has now been maintained since June 2007 Technical progress from RA and AN …  The outturn forecast is in excess of the £9.72M envelope A possible de-scope option (magnetic shield wall procurement postponed to Phase II) has been identified Issues:  Phase I resources need to be carried over into financial year 2008/09  Since some magnetic shielding walls are required for Phase II, the best way forward needs to be identified: Noting that the infrastructure project now has gathered momentum, the project teams preference is: –To review rapidly the design with a view to reducing complexity and cost and to identify whether a staged build is possible; and –To push ahead as close to the present schedule as possible  It is urgent to resolve the funding of Phase II

3 MICE Target (in ISIS) Target & Controls. Pre-installation  Stepper motor & interlocks ok.  Target actuated 1000 times ok.  Good vacuum (3.3×10–7 mbar).  Absolute position w.r.t. beam pipe measured. Moved to ISIS and connected Sunday 20th  Several damaged fibres discovered. (Poor installation)  Optics (approximately) set up.  Stepper motor & interlocks checked.  Target raised & lowered several times.  Operation from MICE LCR difficult without network. Some work remaining for Installed Target  Adjustment of optical amplifiers, interlock programming, gate valve to be open, PPS ……….  Stepper motor control under investigation at DL and, of course, permission from ISIS to operate!

4 Secondary MICE Target Actuator & electronics (almost) completed & tested in Sheffield – 50,000 pulses. To RAL 13th February and re-assembled in R78.  Unusual pulse-to-pulse variation.  Failed after ~600 pulses.  One coil (of 24) found shorted to ground & burnt out. Internal ground not connected in Sheffield test!  Spare stator installed  New welded seals at Daresbury last week  Brought back to RAL immediately (untested.) All electronics now at RAL.  Problems still exist so has now be taken back to Sheffield for further investigation.  N.B. Stator currently in ISIS had done >2M pulses ok. Future – investigating better quality insulation (double layer?) with manufacturer. Need new QA procedures for coil insulation.

5 Phase I beamline in MICE Hall Shielding complete & D2 positioned Since then:-  D2 fully connected  PSI Decay solenoid installed With shielding Aligned  Q4,5 & 6 installed  All girder boxes built & installed  Power & interlocks connected  Water being finished  Alignment complete Still to do  Cherenkov mounted Stand required modification  ToF0 delayed. Due early March Install with Cherenkov  Q4-6 water and final tests  Q1 power supply due last week  PPS to be connected – this week Sept 2007 Feb 2008

6 Work in ISIS vault during Xmas shutdown

7 Status of tracker build: schedule Tracker schedule:  Tracker #1 complete in R8  Tracker #2 to be fabricated by end March ’08 (means assembled space frame in coffin)  Cosmic ray test of tracker #1 started before end March ’08  Continuing resolution of installation: Run with cosmics, install in solenoid, run with cosmics? Run with cosmics, install/de-install in Hall, run with beam?

8 Linde refrigeration Spec:- 4K (56W solenoid + 10W transfer )  In November we saw about 51W + 10W Managed to cool decay solenoid to ~20K –Ran out of time, not cooling Problem ‘traced’ to missing insulators  Jan 08, a reduction to 47W + 10W Problem now believed to be turbines –Evidence of carbon / graphite dust –Bearing failure? Turbines due back last week Engineer ready to re-fit & re-test  We trust that this the end of the problem.  Scaffolding built around decay solenoid  Gas rack and piping ready  Need access to DSA and permission to dismantle transfer line.  DeMaCo will return to re-install transfer line into DSA 17 th March.

9 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS  Now have a clearer picture of tasks and responsibilities  Led to better understanding of the project  Technical detail and information flow was not obvious  Engineering content of Infrastructure WP had been grossly underestimated  New Hall Manager, together with re-structured meetings, is a vital link in the project  Some very good progress has been made in the Hall build-up, but there have been a few technical problems… Clear that we have to plan better for Phase Two

10 Technical Co-ordination, Phase One Delay to target running:  Ideally, management of design and manufacture should have been in one place  Mechanical design of the bearings and shaft could have been improved to mitigate dust problems delays and QA problems  On & Offline targets should have had parallel working  One Project Engineer identified at Daresbury for target, effective, but rather too late to make big difference If there is a limited target programme in Phase Two:  Mechanical re-design, bearings, shaft (important)  Single engineering oversight  Should ISIS take responsibility for installation? Start up of Q4,5,6  Has been delayed as they are not connected to water  Result was we missed completing before ISIS started and lost access to DSA All services and ancillaries must be captured on installation drawings with parts lists –  simple stuff, but surprisingly difficult to implement

11 Technical Co-ordination The Infrastructure project:  Magnetic Shield walls  Rolling platforms  False floor  Concrete floor removal  Excavation of ISIS mound  DSA Roofing  Air Conditioning  Water  Electrical The engineering content was seriously under-estimated, what have we done?  We now understand it (Don’t like what we’ve found though!)  Broken it into more digestible chunks, i.e. North, South, etc  Appointed new WP1 Manager (Tim Hayler)  Limited de-scope possibility (rolling platforms)  Tenders, orders, etc underway, see Richard’s slides

12 Technical Co-ordination Infrastructure technical status:  Following big-ticket items are committed: South shield wall support structure Air conditioning units Concrete floor removal  Design work almost complete for: False floor North wall shield support structure DSA roofing and walkways  Four sensible offers received for ALL magnetic shield plates (£150k – £200k)  Remaining design work: MICE Hall roof layout (not yet started) & check the roof’s structural rating –Fence between MICE roof and Injection Hall Installation drawings for CDM records (hopefully a collating exercise)

13 Technical Co-ordination  We have been asked to provide these but have no funds to do so –Fence (or hand rails ) around the entire perimeter of the MICE roof –Permanent stairway giving access to roof So the Infrastructure will over-run Phase One….  Three main effects: Will delay Step II & III of MICE Stack-up of deadlines means Heavy civil work will be concurrent with tracker/solenoid integration – cannot be allowed Spending on infrastructure (manpower & capital) carried into Phase II  Open questions: We can stage the build of the magnetic wall, not a cost saving, in fact probable cost increase, but we can tailor to meet Phase II beamline build schedule better? –Direct cost saving from change of rolling platforms 2-6 for off-shelf slides Carry on as we are option: basically the infrastructure work dominates the Hall until mid July 2008

14 Technical Planning for Phase Two We have to plan better:  The Phase One Infrastructure Work Package should convert into Integration & Services for Phase II:  It’s very important that this is understood and properly resourced, because the risks are greater: More diversity in the beamline elements Safety, technical, financial and collaborative issues The Hall will be full of equipment – less space than we think  The current WP1 Manager can do it, but must be backed up by suitable, technical person  Better use to be made of the Technical Board Integration & compatibility issues will become more important Currently the Hall baseline layout is a huge 2D CAD drawing ‘owned’ by one person. We will fail if we carry on like this  The drawing is too large and crowded  It has no dimensions or datums for beamline items  No services detail shown  All technical integration decisions are on the critical path at the mercy of one overloaded person

15 Technical Planning for Phase Two We will convert it to 3D CAD assembly – partly done already:  Access by multiple controlled users possible  Engineering decisions can be made in parallel  CAD models more easily shared among collaborators  Dimensioned plans can be extracted A couple of worries:  The RF and LH2 projects both have the potential for large unforeseen expansions of engineering effort: The RF power distribution is currently ill-defined The LH2 is an R&D project at present and the lead engineer left last year (replacement identified – Mike Courthold)  Interaction with the rest of MICE for both these activities will not be straightforward  The Phase II effort profile estimate is taking shape, but it must allow sufficient margin for the above and identify the right person – discussions underway with EID  Integration & services must be identified as a discrete Work Package.

16 Organisation Project management team established:  A.N. Other PPD: P. Flower, in place from October Took responsibility for testing completed Q35s and D2 (and other things!)  MOM team now in place: Past: Blondel, Long, Zisman Present: Gianninni (present MOM) Future: Apollonio, Kyberd, Ellis, Grauhlich, Long, Bross, Zisman, Kaplan, Blondel Project on much better footing, but:  PM (R.Apsimon) has applied for early retirement Consultation over successor has started  P.Flower has applied for early retirement  Other staff have applied for redundancy/retirement Uncertain times! WBS: change in infrastructue work package manager:  T.Hayler replaced C.Nelson from January 2008 Preparation of reports:  Much better, but still some work to do …  For Phase II plan to set up a data-base (in common with UKNF) …

17 Phase I finances:

18 Phase I finances: infrastructure

19 Phase I finances: over-run:

20 Phase I: possible re-definition of scope Outturn forecast in excess of allocation +WM + contingency  Therefore seek a re-scope that will bring the total spend within the £9.72 envelope Option:  Move procurement/installation of magnetic shield walls out of Phase I  Undertake redesign with a view to simplification of design and reduction of cost as part of Phase II Technical details from Andy Nichols Magnetic shielding will be required in Phase II  Possibilities for cost reduction: Simplify support Reduction in quantity of steel –Thickness –Perhaps north (linac side) wall need not be as thick »Extreme possibility: north wall is not needed (unlikely)

21 Phase I: possible re-definition of scope Present schedule for build of magnetic shielding:  Start April; complete end of June  Heavy civil construction in conflict with running MICE with tracker: Concrete dust/metal swarf incompatible with tracker electronics Agreement with FNAL precludes heavy construction work in vicinity of VLPC cryostats (VLPC cassettes are D0 live spares)  Significant schedule issue Delay/redesign magnetic shielding: pros and cons:  Pros: Design for a cost saving: reduce capital cost and perhaps a staged build Staged build: –Would allow ‘just enough’ steel to be installed for each stage in MICE build up Staged build –May allow data-taking to be scheduled in between sections of build  Cons: Redesign implies delay to installation start and increase in staff effort required Staged build likely to result in an overall increase in cost: –Though the spend profile may be more easily managed

22 Phase II finances: MICE-UK Phase II deliverables: STFC funding cuts likely to imply a significant reduction in resources …

23 Phase II finances: guidelines from J.Womersley Seek to defend a continuing accelerator R&D programme at the level of ~£10M / year Guidelines for the MICE-UK and UKNF programmes:

24 Phase II finances: consequences: Significant (and unrecoverable) delay:  Above assumes contract for focus-coil modules is let on the 29Feb08 Implies first payment this financial year  To get close to requested profile, had to introduce arbitrary 3 month delay to start of manufacture of second set of coils Moves payments into financial year 2010/ months +14 months Urgent action is required!

25 Phase II finances: consequences: risk Risk: loss of post. doc. Staff:  Significant damage to expert UK team established in Phase I  Implies significant reduction in potential for UK impact in analysis/exploitation phase Tragic! Urgent action is required!

26 Reputation risk: STFC RAL is the host laboratory:  Over the past year, the international collaboration (the US in particular) has increased its investment in MICE Phase II  For the UK to delay the schedule of the experiment risks not only the timely inward investment, but the UK reputation as a reliable collaborator and host

27 Project Milestones – progress since last OsC Total # milestones % Complete at 9/ % Therefore # remaining % Of these 49.7% we have…….. Completed by 2/ % Not complete but unchanged 149.5% Milestone now within 30 days 21.4% Milestone past and not complete %

28 Project Milestones – progress since last OsC

29 Project Milestones – progress since last OsC Not complete but unchanged (14) 7 will finish by 31/3/08 3 due to finish at end of Phase I infrastructure 4 are part of Phase II Milestone now within 30 days (2) Linde refrigeration – before 31/3/08 Milestone past and not complete (16) 1 finished since writing paper 6 will finish by 31/3/08 8 due to finish at end of Phase I infrastructure 1 is part of Phase II