Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.

Slides:



Advertisements
Similar presentations
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Puyallup IT & Communications Puyallup Services and South Sound 911 TOPICS Summary – Current Direction of IT & Communications South Sound Updates Puyallup.
Striving to exceed customer demands by delivering the best.
MN10 - Managing Wireless Networks Building Large Scale Wireless Water Control Networks Eric Marske Product Manager ESTeem Wireless Modems.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
January 23-26, 2007 Ft. Lauderdale, Florida Designing & Implementing Your IP PBX Success is all in the planning Paul C Cissel, CEO, Internet & Telephone,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
1 Fox Valley Fire & Safety’s Wireless Radio Network Our customers experience reduced monitoring costs; normally 25% or more. Eliminates expensive phone.
Downtown Seattle Transit Tunnel (DSTT)
4th Annual Innovation Challenge Kick-Off and Overview Fall
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Smart Grid Research Consortium Conference Communications: Technologies Systems Future Trends Dr Rick Russell.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Massachusetts Municipal Environmental Stewardship & EMS in Public Schools Grant Programs Massachusetts Department of Environmental Protection April 28,
Overview and Next Steps 8/27/2015.
Strategic Purchasing Division Operation Contracts Cost Reduction Friday March 13, 2009 Presented by Calvin D. Wells, Deputy Director Strategic Purchasing.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
Grantwriting. Types of Grants Foundation Grants HancockREADS Grants Hancock Education Fund Grants.
2 Located within the Naval Petroleum Reserve No.3 (NPR-3), RMOTC –Operates in an oil field environment –Explores solutions to energy issues –Demonstrates.
Valorisation and dissemination of EAF technology
Scott Longhurst CalWA Vice Chairman, Education Committee.
Water System Planning Study
JOINT EFFORTS OF MUNICIPAL CORPORATION FARIDABAD & S.A.S. SERVIZIO PVT. LTD. (formerly known as RAMSONS) MISSION STATEMENT To become ‘partners in progress’
‘Monitoring Solutions for 2001’ Rome, Italy Wednesday 31 st January, 2001.
Pre-Submittal Conference.  Introductions Lori  Procurement Code Requirements Lori  Solicitation Timeline Lori  Scope and Intent of Project Jay  Site.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
Request for Qualifications: Design Consulting Services for Consolidated Rental Car Facility (“CONRAC”)- Airport Transit Center Presented by: Aviation Department.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Topics of presentation
1 Presented to the Simplified Acquisition Committee on August 28, 2013 NIHCATS II electronic Government Ordering System (eGOS): An Overview.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
April 8, 2011Page 1 April 8, 2011 The University of Texas Interdisciplinary Energy Conference Overcoming Barriers to Smart Grid & New Energy Services Panel.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
Enterprise Systems Business Planning & Logistics Site Manufacturing Operations and Control Area Supervisory Control Basic Control Safety- Instrumented.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
State of Idaho RFP02458 RFP issued May 15, 2012 Pre-Proposal Conference May 31, 2012 Questions Due June 4, 2012 Closing Date 5:00 p.m. MT June 21, 2012.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Office of Sponsored Projects & Industry Partnerships eSRA Electronic Sponsored Research Administration Jeff Weiner Office of Sponsored Projects & Industry.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Chapter 12 Implementation and Maintenance
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f Strategic Risk.
Outreach for the On-Call Hazardous Waste Site Investigation and Design Services Contract Caltrans D9 February 17, 2016.
Employment of scada system in water purification and transmission system.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Irvine Ranch Water District Distributed Energy Storage Case Study
View display boards and speak one-on-one with staff
Perris Water Filtration Plant Membrane Upgrade – Phase I
Affordable Energy Production from Renewable Fuel
Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC.
Agenda Introductions Pre-Submittal Topics RFQ Purpose
Introduction Sign attendance sheet Owner: Jeff Ray – Project Engineer
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Automation Committee Workshop Welcome
Pre-Submittal Meeting As Needed Environmental Services RFQ
Presentation transcript:

Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project February 19, 2014 Pre-submittal Conference

February 19, 2014 Page 2 Introduction Sign attendance sheet Owner:  Jeff Ray – Project Engineer SAWS Treatment & Recycle Engineering  Marc Ripley – Contract Administrator SAWS Contracting

February 19, 2014 Page 3 Questions Due February 20, 2014 Answers Posted February 24, 2014 Proposals Due February 28, 2014 Interviews (if necessary) March 2014 Notification March 28, 2014 SAWS Board Award May 2014 RFQ Schedule

February 19, 2014 Page 4 Point of Contact for Questions Marc Ripley – Contract Administrator Fax: Contracting Department 2800 US HWY 281 N. San Antonio, TX Note: SAWS Project Managers and Engineers will not respond to any questions submitted by phone and / or directly to them

February 19, 2014 Page 5 Evaluation Criteria Project Team Resumes and Experience in Similar Projects – 40 Points Project Approach – 30 Points QA / QC and Risk Management – 15 Points SMWB Participation – 15 Points

February 19, 2014 Page 6 SAWS Facilities – Location Map Legend SAWS Facilities Potential Potable Water Sites – This Phase 1 Project Potential Potable Water Sites – Future Phase 2 Project  Other Sites – Not Part of Project ΔOther Sites – Not Part of Project

February 19, 2014 Page 7 Production Site – Typical Radio Panel Marbach PW Primary Pump Station

February 19, 2014 Page 8 Production Site – Typical SCADA Panel Commerce St. EMS – System Status Screen Commerce St. EMS – Trend Screen Market Street PW Primary Pump Station

February 19, 2014 Page 9 Scope Replace radio communication system w/ communication infrastructure that includes high speed, Ethernet IP radios, antennas, communication towers and backup power including emergency generators and / or uninterruptible power supplies Evaluation of recently constructed broadband backhaul network for purpose of optimizing and interfacing new radio and PLC communications infrastructure to provide secure and reliable communications for approx. 100 existing primary water and booster pump stations and approximately 25 District Special Project (DSP) facilities

February 19, 2014 Page 10 Scope, Cont. Radio communication system will allow for future remote calibration of field monitoring and control equipment and reduction of time for signals to be received / transmitted for pump stations Conduct radio path study for each site location, and field verify each site location for acceptable signal strength Conduct radio path study to address and correct any issues, including, but not limited to, instances where signal strength is inadequate for proper operation of transmitting data across radio system Conduct radio path studies that include investigation of redundant / alternate paths for each repeater site

February 19, 2014 Page 11 Scope, Cont. Replacement of radios and PLCs for approximately 100 primary water and booster pump stations, and SCADAPack controllers at approximately 25 District Special Project (DSP) facilities Control Narrative and Performance Spec. may be required Miscellaneous civil site and improvements work Project upgrades to increase efficiency by developing standardized, automated control strategies for starting / stopping pumps based on equipment efficiency, customer demand patterns and energy costs, as well as allow for remote programming of PLCs

February 19, 2014 Page 12 Questions

Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project February 19, 2014 Pre-submittal Conference