2009 DEPARTMENT OF ENERGY ISM CONFERENCE KNOXVILLE, TENNESSEE AUGUST 26, 2009 Cecil Gibb Manager-Operations C Gibb Consultants.

Slides:



Advertisements
Similar presentations
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
Advertisements

Lisanne Sison Director ERM Bickmore
Course: e-Governance Project Lifecycle Day 1
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
Environmental Management Systems Implementation. CH EMS Experiences CH conducted EMS audits of BNL’s EMS as required by a EPA MOU CH assisted the Yucca.
TEMPUS ME-TEMPUS-JPHES
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
Other Planning Processes: Final Planning Touches
Welcome ISO9001:2000 Foundation Workshop.
Project Human Resource Management
Effective Methods for Software and Systems Integration
ISO Quality management International Organization for Standardization International Organization for Standardization It addresses various aspects.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
Audits & Assessments: What are the Differences and How Do We Learn from the Results? Brown Bag March 12, 2009 Sal Rubano – Director, Office of the Vice.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Basics of OHSAS Occupational Health & Safety Management System
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Setting up an Internal Audit Program By
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
ANSI Z10 (2012): Continual Improvement System for Sustainable HSE Management Z10 as a Framework for Performance Jim Grieger, CIH, CSP, CHMM Associate Director-EH&S,
Formal Methods in Software Engineering
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Responsible Care® Health & Safety Task Force – 06 H&S.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
COBIT®. COBIT® - Control Objectives for Information and related Technology. C OBI T was initially created by the Information Systems Audit & Control Foundation.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
ISO Registration Common Areas of Nonconformances.
The common structure and ISO 9001:2015 additions
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
The following training presentation is for all 1Prospect subcontract employees and is taken upon joining a contract or task order to which 1Prospect is.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
OSHA Safety and Health Program Management Guidelines
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
To the Greater Phoenix Chapter of ASQ January 10, 2013.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
Introduction to Enterprise Risk Management (“ERM”)
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Pipeline Safety Management Systems
Phyllis Lynch, PhD Director, Instruction, Assessment and Curriculum
Project Human Resource Management
Introduction to the Federal Defense Acquisition Regulation
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
DOE Nuclear Safety Research and Development Program
Training Course on Integrated Management System for Regulatory Body
Environmental Health and Safety (EH&S) Supplier Awareness Training
EMS Checklist (ISO model)
Risky Business Standalone ISO9001:2015 Risk-Based Thinking and Integration of Risk Management with ISO9001:2015.
Urban Engineers ISO 9001:2015 General Overview
Project Management Group
Trending Requirements and Results
DOE Review of the LCLS Project 7-9 February 2006
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

2009 DEPARTMENT OF ENERGY ISM CONFERENCE KNOXVILLE, TENNESSEE AUGUST 26, 2009 Cecil Gibb Manager-Operations C Gibb Consultants

Biographical Data Cecil H. Gibb Cecil has over thirty years of experience including quality and safety program development, implementation and management. His career has covered multiple assignments including Quality Manager, Director of Quality and Safety, Regional Director of Quality and Program Manager. His experience includes a diverse number of discipline areas and his employers and clients have included; contractors to the Department of Defense, the National Aeronautics and Space Administration, Department of Energy and EPA. He currently is Operations Manager for C Gibb Consultants, a Knoxville based company providing quality/safety, risk management, process improvement and project support services. He has presented seminars and presentations at numerous technical and civic club meetings, professional society conferences. Cecil is a Senior Member of the American Society for Quality (ASQ), a member of the National Management Association (NMA) and belongs to the International Council on Systems Engineering, (INCOSE). 2

From DOE G ISM SYSTEM GUIDE  “In general, the development and implementation of an ISMS requires an organization to integrate safety into all aspects of work planning and execution …”  “develop and effectively integrate their safety management systems with the business and operational systems throughout their organizations.”  Guide references multiple DOE QA Documents along with ISO 9001, Quality Management Systems—Requirements 3

 Quality Management System (QMS) must be a major contributor.  QMS and ISM have common objective:  Prevention  Objective is achieved with effective:  Risk Management 4

 Rationale for why ISMS and QMS need to complement and supplement each other is apparent: ◦ Failure to have adequate quality controls can result in a safety incident. ◦ Inversely if in the course of a safety analysis a critical item or process is identified, shouldn’t that be a focus or emphasis area for application of the quality management system? 5

 Safety is number one.  Selecting types and levels of control commensurate with the impact of a failure or nonconformance, is important to effective QMS as well as ISM.  QMS application following a graded approach is particularly important in R&D.  Understanding and implementing this approach is very important to integrating the QMS with ISM to achieve effective risk management. 6

 Greater probability of risks being addressed earlier when safety, environment and quality processes are worked together.  Identification and mitigation of risk can be more cost-effective when a team approach is used.  Major standards and regulations have similar requirements. (Many QMS requirements focus on business and operations, i.e. procedures, training, design reviews, etc). 7

 Uses cross functional teams  Improves ability to identify and prioritize critical components, systems, and processes  Minimizes duplication of effort  Helps identify needed resources early  Cost-effective  Leaves more time to focus on improvement 8

NQA-1 NONMANDATORY APPENDIX 2A-2 Guidance on Quality Assurance Programs “To ensure effective risk management, a set of risk evaluation criteria should be established during project design, and carried forward and updated as needed during the life of the project. Risk is a concern that extends beyond ES&H factors; it must be considered in all aspects of work, including business objectives.” 9

Effective application of Quality Management System requirements provide many tools to assist taking ISMS to the next level. A few examples:  Identification and Control of Critical Processes & Components  Procedures/Training  Design Reviews  Control of Suppliers  Control of M & TE  Nonconformance Reporting and Corrective Action (Trending & Lessons Learned) 10

Thank you and remember “No one of us is as smart as all of us” Blanchard and Carew 11 The Heart of a Leader