U.S. Department of the Interior U.S. Geological Survey DEM Preparation Using the New England Method Streamstats Data Preparation Workshop Pete Steeves.

Slides:



Advertisements
Similar presentations
Hydro Networks in GIS Network model Flow on Networks Hydrologic networks Linear referencing on networks Some slides in this presentation were prepared.
Advertisements

Updating the National Hydrography Data for the Twin Cities with Local Subsurface Drainage Information NHD Stewardship Conference Lakewood, Colorado April.
WRAP Hydro Data Model: Its Structure and application to find Input Parameters for the Water Rights Analysis Package Centre For Research In Water Resources.
U.S. Department of the Interior U.S. Geological Survey Action Plan for the Development of Watershed and Sub-Watershed Boundaries for northwestern Mississippi.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
The National Hydrologic Dataset Brian Brodeur GIS Program Director Mass DEP
Introduction to NHDPlus: A Framework for Advanced Water Applications Cindy McKay Horizon Systems Corporation Cindy McKay Horizon Systems Corporation.
Standard watershed and stream delineation recipe - Vector stream (ex. NHD data) fusion into DEM raster (burning in) - Sink removal - Flow direction - Flow.
Why clip basins with lakes and reservoirs?  Flash floods do not occur in lakes and reservoirs.  Similar to the situation in coastal areas, basins extending.
Indiana 2011 – 2013 Statewide Local-Resolution National Hydrography Dataset (NHD) Project MINI – WORKSHOP Thanks to… Susan Phelps, AECOM ; Jeff Simley,
National Hydrography Data Use and Applications.
1-Degree USGS DEM Control Points Locations National Hydrography Dataset (NHD) Drainage Lines Corrected Stream Lines Filled DEM Burned DEM Flow Area Accumulation.
SPARROW Water- Quality Modeling: Application of the National Hydrography Dataset What is SPARROW? Use of NHD SPARROW results By Craig Johnston and Richard.
NHD Watershed: Tools and Applications
“Flood monitoring and mapping for Emergency Response in San Antonio-Texas” Part I by Silvana Alcoz Source photo Term.
GIS Tools for Watershed Delineation Public Policy Perspectives Teaching Public Policy in the Earth Sciences April 21, 2006 Gary Coutu Department of Geography.
Frank Kenny and Bryce Matthews Ontario Ministry of Natural Resources
Flow Time Time Series Hydro FeaturesHydro Network Channel System Drainage System ArcGIS Hydro Data Model.
Current, Innovative, and Standardized Elevation Data for Flood Modeling in Australia: The Murray-Darling Basin Kea M. Beiningen, CFM, GISP Intermap Technologies.
Building Analytical Applications Using NHDPlusV2 Presented by: Cindy McKay Horizon Systems Corporation Sponsored by: US EPA, Office of Water.
U.S. Department of the Interior U.S. Geological Survey Office of Surface Water Reston, VA StreamStats: By Kernell Ries A Web.
A Simple Drainage Enforcement Procedure for Estimating Catchment Area Using DEM Data David Nagel, John M. Buffington, and Charles Luce U.S. Forest Service,
Digital Elevation Model Based Watershed and Stream Network Delineation Understanding How to use Reading
Introduction National Hydrography Dataset Plus (NHDPlus) Version 2.
StreamStats: A Web- Based Tool for Estimating Streamflow Statistics by Alan Rea and Pete Steeves.
GIS in Watershed Analysis. Why watershed Analysis with GIS? Concepts Important datasets Analysis Tools.
By Pete Steeves Alabama StreamStats Presented at the Alabama Water Resources Conference Perdido Beach Resort, Orange Beach, Alabama September 8, 2011 U.S.
NHD Products and Applications InterMountain GIS 2014 NHD Workshop April 7, 2014.
Indiana National Hydrography Dataset (NHD) Improvement and Application Workshop NHD Local-Resolution Development.
+ Al Rea National Geospatial Program ESRI User Conference 7/22/2015 NHDPlus High-Resolution.
David Nail USGS Geospatial Liaison to Indiana March 13 th, 2007 Update on National Hydrography Data.
Creating Watersheds and Stream Networks
U.S. Department of the Interior U.S. Geological Survey Processing ArcHydro Datasets with NHDPlus Version 2, Emphasizing StreamStats Data Development Webinar.
Vision for the National Geospatial Framework for Surface Water Robert M. Hirsch Associate Director for Water U.S. Department of the Interior U.S. Geological.
Section 5. New England SPARROW River Reach Network Assembling the stream network Generation of reach catchments Estimation of Stream-flow and velocity.
Esri UC 2014 | Technical Workshop | Creating Watersheds, Stream Networks and Hydrologically Conditioned DEMS Steve Kopp Dean Djokic.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Conflation Lessons In Iowa Using the NHDGeoConflationTool.
National Basin Delineation Project Team: Ken Howard Ami Arthur Gina Cox Dave Slayter Nathan Kuhnert Cooperative Institute for Mesoscale Meteorological.
National Elevation Dataset - Hydrologic Derivatives (NED-H) Kris Verdin EROS Data Center
U.S. Department of the Interior U.S. Geological Survey Processing ArcHydro Datasets with NHDPlus Version 2, Emphasizing StreamStats Data Development Webinar.
U.S. Department of the Interior U.S. Geological Survey NED, NHD and WBD Preparation Using the New England Method Streamstats Data Preparation Workshop.
NHD Tools for the Evaluation of Watershed Condition and Management Performance Authors: William Cooter (presenter) Peter Ilieve. Tim Bondelid Mark Bruhn.
LTHIA and Online Watershed Delineation - Tale of a DEM consumer Larry Theller,Bernie Engel, and Tong Zhai Purdue University Agricultural and Biological.
Processing Elevation Data. Limitations of DEMs for hydro work Dates Static, does not evolve Matching to linear line work due to scale Processing errors.
U.S. Department of the Interior U.S. Geological Survey Processing ArcHydro Datasets with NHDPlus Version 2, Emphasizing StreamStats Data Development Webinar.
Characterization of Watersheds from DEMs using Spatial Analyst/ArcHydro Robert G. Burns, P.G. Engineering Geologist DWR – Division of Safety of Dams Watershed.
U.S. Department of the Interior U.S. Geological Survey StreamStats Data Preparation Workshop October 21-22, Nashville Tennessee Pete Steeves, USGS MA-RI.
U.S. Department of the Interior U.S. Geological Survey Loading Data into ArcHydro Building the Global GeoDatabase.
U.S. Department of the Interior U.S. Geological Survey Idaho District Office (208) Data Requirements for StreamStats December 18,
U.S. Department of the Interior U.S. Geological Survey Idaho District Office (208) Estimating Hydropower Potential Using EDNA Stage.
By Pete Steeves Rainy River and Lake of the Woods (RRLOW) StreamStats Demonstration for the International Joint Commission October 2, 2014 U.S. Geological.
The Future of NHDPlus 2009 NHD Stewardship Conference Denver, CO April 14-17, NHD Stewardship Conference Denver, CO April 14-17, 2009 Tommy Dewald.
StreamStats Training Follow-up New and Updated Documents –StreamStats_Preprocessing_ Steps.doc –Coastlines.doc –PostHydroDEM_batch.doc –ProcessingFlowColor.ppt.
U.S. Department of the Interior U.S. Geological Survey Processing ArcHydro Datasets with NHDPlus Version 2, Emphasizing StreamStats Data Development Webinar.
Watershed Parameters for Water Rights in the Trinity River Basin Melissa Figurski CE 394K.
NHDPlus: A Big PLUS for User Applications ESRI User Conference - July 24, 2005 The NHDPlus Team HorizonSystemsCorporation Sponsored by US EPA.
May 1, 2002 Streamflow and Water Availability Estimates in Ungaged Streams California’s North Coast Region GIS Layers Lorri Peltz-Lewis U.S. Bureau of.
Using the NHDPlus for drainage area delineation and site matching Kirsten Cassingham, NC Water Science Center Silvia Terziotti, NC Water Science Center.
NHDPlusV2 Raster Components: Catchments and Related Raster Components
National Hydro Data Programs
STREAM NETWORK DELINEATION USING ARC HYDRO AND TauDEM: A comparison of approaches using The Upper Sevier and the Little Bear River Basins Alphonce C. Guzha.
Digital Elevation Model Based Watershed and Stream Network Delineation
Digital Elevation Model Based Watershed and Stream Network Delineation
Calculating Hydrologic Parameters for Estimating Surface Water Flow at Ungaged Locations Richard Hoffpauir Water Resources Engineering.
Provo River Watershed Modeling with WMS Ryan Murdock.
Rainfall Runoff in the Guadalupe River Basin
Data Sources for GIS in Water Resources
Development of a Hydrologic Model for the Wichita Falls District
Creating Watersheds and Stream Networks
IGIC Waters Workgroup Update
Presentation transcript:

U.S. Department of the Interior U.S. Geological Survey DEM Preparation Using the New England Method Streamstats Data Preparation Workshop Pete Steeves and Alan Rea MA-RI and ID Districts USGS

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-2 NHD Watershed DEM preparation using the New England method was also used to create a watershed tool for NHD. For areas that were prepared for NHD Watershed, the resulting datasets can be used in StreamStats. Several overlapping objectives include: –Delineate a watershed from any point location on NHD reaches quickly, reliably, and accurately –Relate the resulting watershed to the reach and measure of the selected point (in essence, create a “polygon event”) –Horizontally integrate 3 earth-surface-based physiographic datasets (hydrography, basin boundaries, and elevation data) through a series of pre-processing steps

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-3 Overview Projections Tiling scheme (database design) Developing datasets in neighboring states Preparing NHD and WBD Preparing DEM data –Topogrid –Walling and Burning

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-4 Projections The Streamstats team has decided to go with a multi-projection environment. Every state will decide it’s own projection(s) This requires some upfront GIS planning for a given state: –Basemaps –DEM preparation –Basin characteristics

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-5 Tiling Scheme Streamstats has adopted the 8-digit Hydrologic Unit as it’s tiling scheme This tiling scheme is also being used for NHD, WBD, and EDNA The ‘single outlet’ standard for hydrologic unit tiles is ideal for the ArcHydro/Streamstats environment

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-6

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-7 Developing Datasets in Neighboring States Define your study area Study areas are 2 tiered –Tier 1 includes full or partial 8-digit Hydrologic Units (HUCs) where a complete set of archydro datasets need to be produced –Tier 2 includes full HUCs upstream of your state and not overlapping your state

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-8 Tier 1 Consideration for Massachusetts

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-9 Tier 2 Consideration for Massachusetts

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-10 Developing Datasets in Neighboring States Tier 1 data needs to be developed in your State projection Tier 2 data can be developed in any projection. The final vector Global datasets can be projected without complications

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-11

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-12

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-13

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-14

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-15

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-16 Preparation of NHD NHD acts as the backbone, upon which the other datasets are structured Keep in mind that the optimal goal is to have a dendrite network Only the centerline route features are used when preparing the NHD

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-17 Preparation of NHD (cont) Determine if you have hi-resolution NHD for a given HUC Copy the NHD coverage out of the NHD workspace Convert the route.rch table to an Arc coverage Project the NHD coverage to your state projection

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-18 Preparation of NHD (cont) Remove all isolated networks that are not part of the main network Flip all remaining arcs. NHD route features are oriented upstream by default, and they need to be oriented downstream for this procedure Extend the outlet arc

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-19

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-20

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-21 Preparation of NHD (cont) A final step involves making a dendrite of the NHD A consequence of skipping this step may be incorrect watershed delineations for points on the braided section of a network Canals and other man made structures must be dealt with on a case by case basis

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-22

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-23

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-24 Preparation of WBD WBD boundaries act as retainer walls for DEM preparation. By including WBD in the preprocessing, watershed delineations are forced to recognize these boundaries as truth

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-25 Preparation of WBD (cont) Boundaries may need to be modified to make certain that they cross NHD in a single location for a given basin polygon. Boundaries can be added to WBD (i.e. basin boundaries delineated to gage station locations).

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-26

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-27

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-28

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-29

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-30

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-31

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-32 Preparation of WBD (cont) For dense basin boundary datasets weed out any boundaries that do not work well with NHD, particularly in areas with man- modified structures (i.e. canals) This work needs to be done in coordination with NHD preparation. At times it may be more appropriate to weed out NHD features (i.e. canals)

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-33

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-34

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-35

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-36

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-37

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-38 Preparation of NED Topogrid is a computation intensive step that enforces NED to recognize NHD as drainage truth. Subsequent walling and burning steps further enforce the Topogrid process by exaggerating elevation values along NHD and WBD features

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-39 Preparation of NED (cont) Several preliminary steps include: –Projecting –Clipping the NED to a 4000 meter buffer area around the basin –Converting zunits to centimeters –If your HUC has partial areas with 10 meter DEMs (and you want to use them), this data needs to be developed separately from the NED for these preliminary steps –Converting DEM values to points

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-40 Topogrid The Topogrid command is an interpolation method specifically designed for the creation of hydrologically correct digital elevation models (DEMs) from comparatively small, but well selected elevation and stream coverages. It is based upon the ANUDEM program developed by Michael Hutchinson (1988, 1989).

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-41 Topogrid Represents the ‘Intermediate Step’

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-42 Topogrid Resample cell size to 10 meters Set your origin coordinates using the subcommand ‘XYZlimits’ Buffer your HUC boundary 50 meters and use for subcommand ‘Boundary’ Input layers include dendrite steams and NED points Save the resulting dataset after post Topogrid processing

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-43 Topogrid For most HUCs, breaking up your watershed may be necessary prior to running TopoGrid –The key factor is GridAllocation –Be sure to buffer each subset 4000 meters (hence, overlap) for input NED points –Be sure to buffer each subset 50 meters (hence overlap) for the subcommand ‘Boundary’ –Use the full dendrite layer for each subset

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-44

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-45 Walling and Burning Exaggerate the depth of the dendrite and height of the WBD boundaries Simply run the nedprocessing.aml (which runs the agree.aml as well) Agree.aml is used for burning: d98/quality/agree/agree.htm#Part1

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-46

StreamStats Data Prep Workshop Oct 21-22, 2003Page 1-47