1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
1 FNPB “Common Magnet” Design Introduction Geoff Greene UT/ORNL.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Date Instrument Systems ORNL SEQUOIA Overview Garrett Granroth (Instrument Scientist) David Vandergriff (Lead Engineer) ARCS/SEQUOIA IDT meeting March.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
Department of Energy Review of the SNS Instruments –Next Generation (SING) Project HYSPEC Instrument: Status and Performance Mark Hagen Instrument Scientist.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
Patrick Thornton, SNS/FPE June 9, 2008
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
What happened to our shutter? and a brief description of our upstream beamline for those who were not around when it was built.
May Status of FCAL Issues to be addressed at the detector review.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Projected performance of NPDGamma and new systematics introduced by SM polarizer Christopher Crawford University of Kentucky NPDGamma Collaboration Meeting.
Overview of the GlueX Tagger and Photon Beamline..
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
The NPD  Experiment David Bowman IScientific goals IIStatus.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
Neutron Scattering Group February, 2001 A High Performance Instrument for the Single Crystal Spectroscopy at the Pulsed SNS. n What is the spectrometer.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Status of n_TOF Facility
HYSPEC IDT Introduction to HYSPEC: Overview of the Conceptual Design and Top Level Specifications. Outline Overview of the HYSPEC layout and principal.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
Fundamental Neutron Physics BL-13
Vashek Vylet RadCon Manager UITF Internal Safety Review May 10, 2016
The NPDGamma Experiment at the SNS FnPB
Experimental equipment Edgar L. Black February 17, 2019
Operations, Risks & Hazards
X-Ray Transport, Optics, and Diagnostics WBS Alan J
The Bunker Project Overview Zvonko Lazic
Monte Carlo simulations for the ODIN shielding at ESS
Bunker Project Integration/Interfaces
Test Beamline System Requirements and Charge to PDR Committee
Supermirror polarizer and beam simulations
Presentation transcript:

1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL

2 Overview FNPB Beamline NPDGamma Experimental Layout Radiological Shielding Magnetic Shielding Issues and Concerns

3 Preliminary Design Review Charge Have the hazards been completely identified and accurately classified? Is the design reasonable and does it adequately address identified hazards? In particular, is the conceptual design for the liquid hydrogen system (target, control system, vent stack) capable of leading to an acceptable final design of the system? Are the proposed operational parameters and physical characteristics of the hydrogen target system appropriate for safe operation? Are other aspects of the experiment reasonable and amenable to safe operation?

4 FNPB “ Upstream ” Beamline Components Shutter Insert Core Vessel Insert Shutter Gate Core Vessel Flange STARTING POINT neutrons

5 Cold Beamline –Guide from 5.5 m to 15 m –Bender out to 7.5 m (R=117 m) Line of sight ends before 2 nd ary shutter –4 chopper housings –Monochromator housing –Secondary Shutter –Beam Monitor & Beam Stop FNPB Cold Neutron Beamline

6 Monolith Shielding FNPB Cold Neutron Beamline

7 FNP DESIGN OVERVIEW

8 FNPB Construction Status 6/07 Project is currently on schedule

9 FNPB Shield Wall

10 The FNPB Cold Beamline design is essentially complete. Remaining tasks are completion of shielding enclosure detailed design, PPS, and utilities layout. We are NOT explicitly asking for a review of these components. FNPB Cold Beamline Status

11 The NPDGamma Experiment Supermirror polarizer FNPB guide CsI Detector Array Liquid H 2 Target H 2 Vent Line Beam Stop Magnetic Field Coils Magnetic Shielding H 2 Manifold Enclosure

12 The NPDGamma Experiment – Vent System

13 The NPDGamma Experiment – Shield Roof and Mezzanine

14 The NPDGamma Experiment – Vent Line Routing

15 Radiological Shielding NOTE: Because of curved guide and use of 6 Li collimation, dose rates are totally dominated by photons by cold neutron capture.* Shielding enclosure: 18” Concrete shared wall with FP 12 9” Concrete wall on FP 14 side 9” Concrete roof Enclosure is lined with Steel (up to 2” in places) Additional “temporary” shielding blocks are placed on FP14 of Wall *This is validated by MCNPX simulaltions.

16 MCNPX Radiation Simulations

17 MCNPX Radiation Simulations

18 Magnetic Fields The NPDGamma magnetic field is low (10 Gauss) but occupies a large volume. The shielding enclosure is lined with 0.25”-0.75” of 1010 steel to act as a flux return. This also serves to provide magnetic shielding and to confine stray magnetic fields. We used commercial magnetic FEA software (OPERA3D) to model our magnetic field arrangement. Facility requirements call for magnetic field to be less than 50mGauss at the boundary of adjacent beamlines

19 Stray Magnetic Fields -Summary The NPDGamma external magnetic field is below the facility required level at the FP12 boundary and the FP15 boundary. It slightly exceeds the required level at the FP14 boundary. This is acceptable to FP14 beamline responsibles. E F CoilsCoils Magnetic shield Z Concrete wall 1 X A B FP 12 side FP 14 side

20 Other Issues A detailed hazard screening (next presentation) has identified the liquid Hydrogen target as the only “exceptional” operational issue. All other hazards are similar to those encountered on other SNS instruments. The details of the LH2 target and vent system are the subject of the third presentation.

21 The NPDGamma Experiment Supermirror polarizer FNPB guide CsI Detector Array Liquid H 2 Target H 2 Vent Line Beam Stop Magnetic Field Coils Magnetic Shielding H 2 Manifold Enclosure

22 End of Presentation