MICE MICE Magnet Modelling - Presentation to the Daresbury Magnetics Group Daresbury Laboratory 31 st January 2013 P J Smith University of Sheffield.

Slides:



Advertisements
Similar presentations
MICO Meeting Magnetic Field Shielding Issues 11 th July 2012 Mike Courthold 1.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
1 26 Nov 2010 SOLID ABSORBERS Solid absorbers will provide first cooling demonstration –This is important for a number of reasons! Can use only solids.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Year 7 Independent Learning Task 1
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE CM30 Magnetic Shielding Update Mike Courthold 6 th July
The first question Why do you really want to make this film?
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE CM32 8 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
MICE Specification of the Stray Field Issue and the MICE Hall Model P J Smith 23 rd September 2013.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
MICE input beam weighting Dr Chris Rogers Analysis PC 05/09/2007.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Online Reconstruction 1M.Ellis - CM th October 2008.
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
MICE Magnetic Modelling CM 35 RAL 14 th – 16 th February 2013 P. J. Smith.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
(one of the) Request from MPB
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
MICE Magnetic Modelling CM 36 IIT 17 th – 19 th June 2013 P. J. Smith.
Muon Ionisation Cooling Experiment Overview
Status of the MICE Construction Project
Why do we need to know the fields / map the magnets?
Specification of the Stray Field Issue and the MICE Hall Model
CM 34 RAL 17th – 19th October 2012 P. J. Smith
Using MICE to verify simulation codes?
Controls & Monitoring in MICE
The Detector System of the MICE Experiment
Presentation transcript:

MICE MICE Magnet Modelling - Presentation to the Daresbury Magnetics Group Daresbury Laboratory 31 st January 2013 P J Smith University of Sheffield

MICE 31/01/20132 Overview of MICE

MICE 31/01/20133 Overview of MICE The MICE experiment uses a beam of low energy muons to test the feasibility of ionization cooling. The goal of the MICE experiment is to construct a section of cooling channel long enough to demonstrate a measurable cooling effect. This is achieved by reducing the transverse emittance of a muon beam by the order of 10%. Several different particle detectors will be used to measure the cooling effect particle by particle with high precision, the aim being to achieve an absolute accuracy on the measurement of emittance of 0.1% or better. The emittance measurements will be performed with muon beams of different momenta within the range of 140 to 240 MeV/c and a variety of beam optics and absorber materials will be tried. Much of the primary beamline for the experiment has been constructed and commissioned and work is now focusing on installing the major components of the cooling channel.

MICE 31/01/20134 Overview of MICE We have a beamline to ‘feed’ the experiment: Target 3 Quad Triplets 2 Dipoles 1 Superconducting ‘Decay Solenoid’ MICE itself: Step VI contains 16 superconducting solenoids Plus additional detectors, and considerable infrastructure to support the experiment.

MICE 31/01/20135

MICE 6

MICE 7 Overview of MICE- Step VI

MICE 31/01/20138 Overview of MICE Illustration showing a completed step IV cooling channel. None of the external detectors and surrounding infrastructure are shown

MICE 31/01/20139 Magnets

MICE 31/01/ The MICE Magnets

MICE 31/01/ The MICE Magnets Solenoid Mode Values taken from Technical Reference Document which is slightly out of date

MICE 31/01/ The MICE Magnets Flip Mode Values taken from Technical Reference Document which is slightly out of date

MICE 31/01/ The MICE Magnets The MICE superconducting magnets were designed without return yokes. (circa 2000~2004?) Reasons for these not having return yokes... (some speculation here as no-one is really holding their hand up) - Cost - Non distortion of magnetic field within MICE? - Simulation results at the time showed that external field generated from these magnets was not going to be a problem. - Others? At this stage the reason is irrelevant. It’s a problem that we have whatever the reason and it’s a problem that we urgently need to solve...

MICE 31/01/ Initial Simulation Work About a year ago Mike Courthold and Vicky Bayliss (RAL) started to run some simulations that challenged the next-to-last assertation that I made on the previous slide. INSERT LINK TO CM talks? etc It appears that the air fields produced by the MICE magnets were of sufficient magnitude to be of concern. There is a clear risk to the reliable functioning of a significant amount of equipment within the MICE hall and beyond the experimental hall’s walls.

MICE 31/01/ Defining the Problem Since then much of the work done has to been to try and ascertain: Do we really have a problem and if so how big is it? What areas of the experimental hall are particularly affected? What items are particularly affected? Are there areas of the experimental hall that are not so badly affected by stray field and is it ok to put equipment in those areas? Where equipment can’t be moved, what is the effect of the field on that equipment and if necessary can it be mitigated? Can the field be mitigated with a retrofitted return yoke?

MICE 31/01/ Defining the Problem Our starting assumption was that everything in the Hall, and some way beyond the Hall walls will be affected by the MICE magnetic fields. A catalogue of potentially affected systems was then made – it’s a huge list and I won’t show it here – but is available on-line. This was only starting assumption, and I think we are already someway towards showing that some areas of the Hall are now safe for Step IV of the project.

MICE 31/01/ Magnetic Modelling I shall take a look at all of these in more detail over the forthcoming slides: 1) I’ve built a magnetic FEA model of the whole experimental Hall – This provides a guide as a to a first feel of the what the field level is likely to be like in particular areas. 2) There has been a lot of effort put into designing a retro-fitted return yoke for step IV (and step VI) - Holger Witte – BNL If it can be implemented this looks like the obvious solution but in parallel we have to consider the possibility of running the experiment and the ramifications of not having a return yoke. Even with a return yoke there are certain systems that will still be in high field and so the return yoke does not mitigate the need for some analysis work.

MICE 31/01/ Magnetic Modelling 3) Sub Modelling. Areas of the hall that need particular attention and cannot be modelled in a ‘Hall Model’. As this will be the thrust of our discussion I will return to this later.

MICE 31/01/ Model Verification There is a clear desire to have some form of independent validation of these models! R9 Testing We’re currently having an AFC magnet tested in R9 at RAL. The setup in R9 is being modelled by Vicky Baylliss (RAL) and extensive field measurements of equipment in situ (racks/compressors) will be taken. The aim here is to tally the field measurements to the model and then to link this back to other models/sub-models. I’m lead to understand that this is no easy task.

MICE 31/01/ AFC Magnet in R9 Cryomech Compressors and Controls in R9

MICE 31/01/ Model Verification Holger’s Models Holger Witte has built some independent models (OPERA FEA, OPERA Biot-Savart, COMSOL) that have demonstrated that the fields predicted at the West End of the MICE Hall by the Hall Model seem to be reasonable. Holger has indicated that the meshing resolution in the Hall model is probably not good enough to give accurate results if we were to include finer levels of detail in the model. I won’t cover the details of his findings here as this would be another presentation in itself but I can provide you with copies of these presentations later if desired.

MICE 31/01/ Model Verification DL: How do you verify your magnetic models?

MICE 31/01/ (1) Hall Model There is a clear need understand what is happening in various locations of the MICE hall in good detail (accuracy) but without knowing the local field it is difficult to generate localised models. The primary aim of the Hall model was to: Give an indication of what the field is in a particular area of the MICE Hall. Tell us whether the field is uniform in that area. If the field is not uniform then the Hall model can provide us with a data set of boundary fields that can be plugged into various local sub-models. The last point has been shown in principle but not yet put into practice.

MICE 31/01/ (1) Hall Model The MICE Hall model contains a reasonably realistic representation of the structural iron contained within the MICE Hall itself. Other structures that are not made of iron but provide useful reference structures (i.e. walls and floors etc have also been added) The structural iron in the MICE Hall has no symmetry and so a full 3D model is required. In terms of the code itself it was fairly clear from the outset that a Hall model was going to be a big task and writing one long piece of.comi script was going to end in tears... The Hall model is component based, so components can be turned on and off at will in the.comi code and in principle it should still mesh and run. This significantly speeds up coding/debugging. At the moment no studies on what the effect of turning individual components off has on the field, so I tend to only run models with all of the components turned on. In light of recent findings it’s not clear that such a study would be productive.

MICE 31/01/ (1) Hall Model After the iron was added to the hall there was a great temptation on my behalf to push the model to see what meshing resolution I could achieve whilst keeping the solve time tractable. (Call this inexperience and no data yet on the model’s validity.) Our first ‘study’ with the Hall model involved placing some racks in the Hall model and increased the meshing resolution in those areas to see how those racks affected the fields. Interesting results but... Later, independent studies by Holger indicated that the meshing resolution in the Hall model is not high enough to give accurate results at the level of detail that was being modelled. At this point it is probably fair to say that the Hall model is now serving its purpose – subject to model validation - it is providing us with first estimates of background fields given realistic estimates of iron content within the Hall. We need sub-models of areas of interest to continue developing the modelling work.

MICE 31/01/ (1) Hall Model - Website The development of the Hall model has been reasonably well documented (at least by my standards) and a lot of information can be found at Notes Drawings comi Script (Results) This might be a useful source of information to those involved in the modelling.

MICE 31/01/ (1) Hall Model – Model 52 This is one of the latest models – if we can view this model in OPERA then I can zoom in and give you a virtual tour... Also a good point to visit the modelling website

MICE 31/01/ (2) Return Yoke Holger Witte (BNL) has been working on the design of a retro-fitted return yoke to the cooling channel for step IV. We now have an outline magnetic solution for step IV – the devil is in the engineering detail which is now being worked upon. These example slides have been taken from Holger’s presentations to illustrate the principle – details may change. Early development of idea Return yoke connected to end plates and with addition of vertical ‘flanges’

MICE 31/01/ (3) Sub Modelling The areas of particular interest include: Tracker Sub station Quads Better Rack model Transformer in Trench Racks behind North Shield Wall. From our point of view one great aspect about the sub-modelling is that (in addition to drawing upon the experience of the people who have done modelling work before!) the sub-modelling will allow us to parallelise our progress.

MICE 31/01/ (3) Sub Modelling - Tracker The tracker is a major component of the MICE cooling channel. The external infrastructure for the tracker contains many magnetically sensitive components and many of these components cannot be moved. Managing this, with or without a return yoke, is going to be a challenge. Craig will now give his presentation on the tracker as he his much more knowledgeable than I am about this. It is our hope that this problem will pique your interest as it is in this area that we urgently require some assistance with the sub-modelling.