1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/01/20111 PHENIX WEEKLY PLANNING 12/01/2011 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
10/6/20111 PHENIX WEEKLY PLANNING 10/2011 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
11/3/20111 PHENIX WEEKLY PLANNING 11/3/2011 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
10/13/20111 PHENIX WEEKLY PLANNING 10/13/2011 Don Lynch.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
11/17/20111 PHENIX WEEKLY PLANNING 11/17/2011 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Presentation transcript:

1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch

1/12/20122 This Week Continue RPC1 N & S commissioning Complete VTX/FVTX LV, HV, signal, fiber and thermocouple installation and plumbing Complete White/Blue sheets (Pink finished last week) Continue prep for run 12 Shielding in RPC3 area (install rails and extended shield) Prep for Cosmic Ray Tests Move shield wall to test fit then park in near closed position MuTr S flowmeter upgrade Install MPC electronics Racks Start PHENIX run 12 shifts Start flammable gas flow

1/12/20123 Next Week Martin Luther King Day – lab holiday, lab closed (Monday 1/16/12) Continue RPC1 N & S commissioning VTX/FVTX LV, HV, signal, fiber and thermocouple installation and plumbing verification and commissioning Cosmic Ray Tests MuTr S flowmeter upgrade Install MPC electronics Racks ???? Close shield wall – IR access limited Run 12 cooldown End of shutdown/start of run party Friday 1/20/12 noon-2:00

1/12/ Shutdown CM alignment stopsDone Upgrade AH craneAfter 1/17/2012 MPC electronics rack upgrade installationIn Progress IR run prep, Pink/Blue/White sheetsDone ?? New and upgraded full detector commissioningIn progress to 1/16/2012 Run 12 cooldown 1/17/2012 General Tasks

1/12/20125 VTX/FVTX Tasks 2011 Shutdown FVTX/VTX cable routing, plumbing, QA testsIn progress FVTX/VTX final electrical/fiber/plumbing/monitoring installationIn progress FVTX connector restraintDone and tested successfully

1/12/20126 RPC1 north and south commissioning In progress RPC3 ShieldingLarge Blocks placed Rail extensions for garage in progress RPC HodoscopeDone except controls 2011 Shutdown RPC Tasks

1/12/20127 MuTr Tasks 2011 Shutdown Commissioning

1/12/20128 Window Washer Safety Pins: Remote insertion/retraction

1/12/20129 Electronics Group Tasks 2011 Shutdown MPC electronics replacement Build racksDone Install & wire racks In Progress Test1/31/12 RPC hodoscope installation Run cables Done Controls/Test1/31/12 Run 12 restoration of detectors Pink/White/Blue SheetsDone?? VTX restoration Reinstall cables, fiber, cooling, monitoringDone FVTX installation and cabling Racks: assemble, test, install on bridgeDone Fiber: install, terminate and connectDone LV sensor and wedge: fabricate, install, terminate and connect Done?? Test connections and controls1/31/12 Other ???1/17/2012

1/12/ Replace MuTr flowmeters (north and south) north done, south postponed to 2012 shutdown Replace tygon lines (80 lines) from the cooling manifolds to the detector with 1/4" ID teflon tubing.Done Insulate whatever Big Wheel chiller lines in the IR that we can get to to reduce sweating in the IR. Done except distribution lines: to be insulated after leak checks Build a system to clean the Novec during the run. System Built Needs to be integrated into NOVEC system Pixel cooling upgrade for 10 º C without impacting strip-pixel cooling. Done Replace all cooling RTD transmitters Done MuID panel circulation. Class one div 2 fans. Done? Other??? 2011 Shutdown Miscellaneous Gas & Cooling System Tasks

1/12/201211

1/12/201212

1/12/ MPC new electronics racks

1/12/ Looking Ahead to the 2012 Shutdown Major Projects: Remove VTX/FVTX Repair upgrade, test, reinstall VTX/FVTX Remove/Repair/Upgrade MuTr Station 1 South Station 2 South (north side) upgrade Station 3 North and South (upper half) re-capacitation and air manifold upgrades RPC stations 1 and 3, north and south maintenance Other detector maintenance as required Infrastructure maintenance as required TBD prototype tasks

1/12/ Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall, over door between control room and elect. ass ’ y room, southeast corner of IR and laser room. Flooding in AH/ Driveway heaving Electronics test/assembly room- to-parking lot door (does not open/close/lock properly – needs to be replaced) Infrastructure Issues

1/12/ Safety, Security, Etc. 1. Annual PHENIX Safety Review Action Items: Consult with Levesque and Kretschmann about the vertex detectors fiber optics bundles from the fire loading perspective (Kretschmann Jan 15, 2012) ??? Review to assure all power supplies are NRTL equivalent compliant and affix respective labels (Giannotti Jan 15, 2012) Provide the new flammable gases leak rates (Pisani, Jan 15, 2012) Done Provide the updated gas usage quantities (Pisani Jan 15, 2012) Done Consult with Phillips whether the FR134 is likely to be sucked into the gas mixing house should a leak develop in the shed Done Carry out the Blue Sheeting Done Provide the calculations for the gas shed (Lynch, Pisani Jan 19, 2012) Provide updated sweep procedures (Sampson Jan 15, 2012) ??? Carry out an inspection of the installed platform gates (Cirnigliaro Jan 10, 2012) ??? Phillips

1/12/ Safety, Security, Etc. 2. Annual PHENIX Safety Review Additional General Action Items: Update the PHENIX ECR. (Craner, Jan 15, 2012) ??? Update the PHENIX work plan (Cirnigliaro Jan 10, 2012) ??? Carry out a magnetic safety review (Phillips Jan 15, 2012) ??? A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi / Etkin et al Jan 10, 2012) Update the documented work procedures. (Lynch Continuing from last year) Establish trained PHENIX watch shifts. (O’Brien Jan 10, 2012) (Done) Review and update the PHENIX emergency procedure if necessary (Makdisi Jan 10, 2012) 3.Post shutdown project review (PHENIX Engineers & Techs): to be scheduled 4.Tunnels now posted ODH0 – ODH web course needed to enter tunnels. Will become ODH1 on Jan.17 – will need ODH1 web course, medical clearance and survival pak hands on training after Jan Safety Solution Proposals (S2) for FY2012 due by 1/30/12

1/12/ Safety, Security, Etc.

1/12/201219

1/12/ Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: Go Giants! (much as it pains me to say it) MLK Holiday Monday 1/16/12 No work I have a dream, that all detectors will work in harmony with each other and run 12 will be a complete success!