2008 ITRS Public Conference San Francisco, USA 1 DRAFT – DO NOT PUBLISH ITRS Factory Integration Shige Kobayashi, Tom Jefferson July 2008 San Francisco,

Slides:



Advertisements
Similar presentations
The 4 T’s of Test Automation:
Advertisements

2009 Litho ITRS Spring Meeting
1 Feb19, 2003 ITRS 2003, Sunnyvale, Ca ITRS Conference April 3-4, 2003 Amsterdam, Netherlands ITRS 2003 Yield Enhancement TWG Attendees: Mike Retersdorf.
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented.
ITRS Winter Conference 2006 The Ambassador Hotel Hsin Chu Taiwan 1 ITRS IRC/ITWG Meetings HsinChu December 4, 2006 UPDATED Linda Wilson
ITRS Summer Conference 2010 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2010 Hans-Peter.
More than Moore ITRS Summer Meeting 2008 July 14, 2008 San Francisco, CA.
4 December 2002, ITRS 2002 Update Conference 2002 ITRS Factory Integration ITWG Michio Honma, NEC Jeff Pettinato, Intel.
ITRS 2001 ESH Thrust. ESH 2001 Objective Maintain a balance between: 1)Solutions to ESH requirements driven by external elements such as regulations and.
Slide ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics.
The International Technology Roadmap for Semiconductors
Michael Lercel And the rest of the Litho TWG’s
International Technology Roadmap for Semiconductors
ITRS Winter Conference 2008 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2009 Hans-Peter.
1 PIDS 7/1/01 18 July 2001 Work In Progress – Not for Publication P. Zeitzoff Contributors: J. Hutchby, P. Fang, G. Bourianoff, J. Chung, Y. Hokari, J.
International Technology Roadmap for Semiconductors
2001 ITRS Factory Integration ITWG
Work in progress Do not publish or distribute ITRS Factory Integration (FI) Update Public Conference Gopal Rao Factory Integration Chair July 2011 San.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference ITRS 2004 Environmental, Safety and Health Chapter ITRS Conference, San Francisco, CA.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference The 2004 ITRS Assembly and Packaging Roadmap Joe Adam TWG Co-Chair.
Summer Public Conference ORTC 2010 Update Messages
ITRS Factory Integation TWG
International Technology Roadmap for Semiconductors
1 DRAFT - NOT FOR PUBLICATION April 5-7, 2006, Maastricht ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006 Lothar Pfitzner, ,
July 13, 2010ITRS public conference – San Francisco1 More-than-Moore Roadmapping Update.
ITRS Factory Integation TWG
ITRS Design ITWG Design and System Drivers Worldwide Design ITWG Key messages: 1.- Software is now part of semiconductor technology roadmap 2.-
International Technology Roadmap for Semiconductors 2001
International Technology Roadmap for Semiconductors
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
ITRS Factory Integration (FI) Update
ITRS Design + System Drivers July, 2010 Design ITWG Juan-Antonio Carballo Tamotsu Hiwatashi William Joyner Andrew Kahng Noel Menezes Shireesh Verma.
Assembly and Packaging TWG
Litho ITRS Update Lithography iTWG December 2008.
Accelerating Manufacturing Productivity Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference ITRS FEP Challenges Continued scaling will require the introduction of new materials.
Factory Integration Update to IRC April 23, 2012 Gopal Rao / Factory Integration Gopal Rao, Peter Csatary, Richard Oechsner, Reiner Missale, Leo.
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Describing Complex Products as Configurations using APL Arrays.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
ITRS Factory Integration Presentation
1 Noordwijk April 23-/ April 2012 Summary for Plenary Abraham Arceo (Sematech) Arnaud Favre (adixen) Herve Fontaine (CEA Leti) Guillaume Gallet.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
Oliver Rose Dresden University of Technology Department of Computer Science Chair for Modeling and Simulation Benefits and Drawbacks of Simple Models for.
T h e Y i e l d M a n a g e m e n t C o m p a n y Service Business Rich Ruiz Director, Global Provisioning GSS Service Supply Chain Mgmt.
Supply Chain Management
ITRS-2001 Design ITWG Plan December 6, 2000 Bill Joyner, SRC/IBM.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Capacity analysis of complex materials handling systems.
9/14/2012ISC329 Isabelle Bichindaritz1 Database System Life Cycle.
ITRS Factory Integration Difficult Challenges Last Updated: 30 May 2003.
Merger Integration, Process Improvement, Increased Collections And Cost Reduction within a Pharmaceutical Firm BackgroundBackground The client is a major.
1 Yield Analysis and Increasing Engineering Efficiency Spotfire Users Conference 10/15/2003 William Pressnall, Scott Lacey.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Supply Chain Performance Measurement “The more you measure, the more you know!” M.Tariq Yousafzai Innovator and Business Creator (ILSCM)
July 11, 2016 Run-to-Run Control of Linewidth and Overlay in Semiconductor Manufacturing Christopher Allen Bode Dr. Thomas F. Edgar, Advisor University.
Shashank Pawnarkar, TCS
ITRS AMC Roadmap Project Plan : AMC Integrated Concept
ITRS 2003 Factory Integration Chapter Backup Material
Details and Assumptions for Technology Requirements
ITRS 2001 Factory Integration Chapter Model Information
North America Physical Interfaces & Carriers Committee
Process Wind Tunnel for Improving Business Processes
Technical Guidelines for the Development of International Standards for Small Hydropower Plants   DONG Guofeng ICSHP  7 November, 2018.
Presentation transcript:

2008 ITRS Public Conference San Francisco, USA 1 DRAFT – DO NOT PUBLISH ITRS Factory Integration Shige Kobayashi, Tom Jefferson July 2008 San Francisco, USA Global Co-Chairs: Europe: Arieh Greenberg Japan: Shige Kobayashi, Michio Honma Korea: S. H. Park Taiwan: Thomas Chen US: Tom Jefferson 2008 Contributors: Terry Francis, Gopal Rao, Al Chasey, Les Marshall, Todd Lasater, Brad van Eck, Kenjiro Nawa, Daniel Babbs, Dave Eggleston, Mutaz Haddadin, Gavin Rider, Andreas Neuber, Eric Englhardt, Peter Csatary, Adrian Pyke, Mikio Otani, Bill Fosnight, Richard Oeschner Junji Iwasaki, Mazafumi Fukushima, Tomoyuki Masui

2008 ITRS Public Conference San Francisco, USA 2 DRAFT – DO NOT PUBLISH Factory Integration Scope and Drivers Wafer Mfg Chip Mfg Product Mfg Distribution FEOL BEOL Probe/Test Singulation Packaging Test Si Substrate Mfg Reticle Mfg Increasing cost & Cycle time implications Factory is driven by Cost, Quality, Productivity, Speed, and Flexibility Reduce factory capital and operating costs per function Faster delivery of new and volume products to the end customer Efficient/Effective volume/mix production, high reliability, & high equipment reuse Enable rapid process technology shrinks and wafer size changes Factory Operations Production Equipment AMHS Factory Information & Control Systems Facilities UI

2008 ITRS Public Conference San Francisco, USA 3 DRAFT – DO NOT PUBLISH Key Technologies that will Impact Factory Design 2008 and future years are targeted to meet productivity and capture technology requirements Key process & device technology intercepts that will impact the factory design are Extreme Ultraviolet Litho (EUVL), new materials, 450mm conversion, significant productivity improvements, and waste (inefficiencies) reduction Economic and business challenges are equal to our manufacturing and process technology challenges in scope and breadth to attain efficiency and effectiveness Year Technology trend (nm) Wafer Size (mm)300 Near Term Years Long Term Years Year Technology trend (nm) Wafer Size (mm) mm ? NGF ? Planning for NGF/450mm EUVL in Production?

2008 ITRS Public Conference San Francisco, USA 4 DRAFT – DO NOT PUBLISH FI 2008 Focus Enable the Transition to NGF / 450mm for cost, cycle time & productivity improvement 2008 TopicsResult 1Incorporate waste (inefficiency) reduction as part of FI roadmap -Defined initial factory integration high level metrics for creation of a waste reduction roadmap -Equipment Output Waste -Wait Time Waste -Completed initial draft of package to communicate waste reduction roadmap approach 2Improve data quality, & time to information - Defined strategy for integrating time synchronization and data handling requirements between production equipment and factory information and control systems. 3 Develop Facilities modeling methodology - Initial development of a modeling methodology for evaluating factory size and cost relationship 4FOUP Airborne Molecular Contamination (AMC) requirements - In conjunction with the Yield Enhancement TWG, reached consensus on monitoring and control methods, and developed initial requirements

2008 ITRS Public Conference San Francisco, USA 5 DRAFT – DO NOT PUBLISH FI 2009 Focus Enable the Transition to NGF / 450mm for cost, cycle time & productivity improvement Focus Areas2009 Goals 1Incorporate waste reduction as part of FI roadmap Inclusion of initial high level Waste Reduction metrics and roadmap in FI Technical Requirements tables 2Improve data quality, & time to information Definition of requirements for equipment and factory data handling rates to improve equipment and productivity monitoring 3Airborne Molecular Contamination Requirements Incorporate AMC limits for wafer carriers into technical roadmaps and document potential solutions 4Facility Modeling Methodology Completion of a functional model validated against benchmarked data 5Address FI Cross-cut issues Address NGF/450mm and identify common areas of waste reduction needs and challenges. Address FI key issues with FEP (Carrier Purging), Litho (Reticle Electrostatic Field, Double Patterning), ESH (Energy conservation), YE (AMC, PCS for Yield) and Metrology (Wafer map standards). Other Focus Areas will be Addressed as Required

2008 ITRS Public Conference San Francisco, USA 6 DRAFT – DO NOT PUBLISH Supporting Materials For ITRS Factory Integration 2008 and 2009 Focus Areas

2008 ITRS Public Conference San Francisco, USA 7 DRAFT – DO NOT PUBLISH NGF/450mm Fab Guidelines 300mm JEITA Guidelines Equipment maker Inputs ISMI Guidelines NG Factory Guidelines combined with ITRS TR & PS Source XTime Dest XTime Source STK Wait Time Dest STK Wait Time Inter-Bay XTime Source Tool Wait Time Dest Tool Wait Time Seasoning etc Wafer by wafer Process Start Speed etc Tool STK Wafer Point Of View ITRS FI TWG will synchronize with NGF and 450mm guidelines to address FI challenges, technology requirements and potential solutions ? Carrier & lot-size determination Direct Transport Standards Production Equipment Standards Factory Control System Standards Interoperability Testing & Reliability Verification 450mm wafer Standards Courtesy: JEITA/ISMI 300mm Classic Today Next several years 450 Productivity Axis 450mm Era Time axis 300mm Prime Driven by productivity & cost improvements (Cycle time & cost/cm 2 ) Cycle time &Cost/Cm 2 reduction

2008 ITRS Public Conference San Francisco, USA 8 DRAFT – DO NOT PUBLISH More Detailed Representation of Factory Waste Wafer Equipment Factory Integration Working Group Focus People Unit View Silicon Waste Equipment Resource Waste People Capability Waste Factory View Wait time Waste Equipment Output Waste in Factory People Output Waste in Factory

2008 ITRS Public Conference San Francisco, USA 9 DRAFT – DO NOT PUBLISH Waste Reduction Activity Time Table JulyAug-OctNovDecJanFebMarAprilMayJunJuly ITRS Events 2008 Focus Area manuscript Winter meeting preparation Material for IRC consideration Spring meeting preparation Finalizing 09 ITRS Summer Mtg Winter Mtg Spring Mtg Manuscript Summer Mtg Working with Other TWGs W/R Write Up for 2009 ITRS Work with other TWGs to pilot W/R Review of W/R approach FI W/R TR tables development

2008 ITRS Public Conference San Francisco, USA 10 DRAFT – DO NOT PUBLISH Facility Resource View Wait Time (WTW) and Equipment (EOW) Output Waste Cycle Time WTWReference Wait Time Product View Bottleneck Resource Operation Efficiency Losses Availability Efficiency Losses Assignable Quality Losses Rate Efficiency Losses E79 1 Theoretical Production Time Operation View Lot Size Batch Size Dandori Hot Lot Dispatch Rule Trade-Off X-Factor Metrics 2 N AMHS Raw Process Time by Process Steps Operators Issue: Comprehensive data collection of factory resource activities Addition of related factory resource activity data(; equipment, AMHS, operators, facility) Standardization of data definition Data collection automation by Lot by Wafer W/R:Waste Reduction WTW:Wait Time Waste EOW:Eqp Output Waste W/R Plan Do Check KPI Structured Information Action EOWReference OEE Metrics Waste Reduction Cycle

2008 ITRS Public Conference San Francisco, USA 11 DRAFT – DO NOT PUBLISH Applying Waste Reduction to Drive The Industry in the Proper Direction Wait Time Waste Baseline = time to process a single wafer in an un-loaded tool = CTmin Actual performance = cycle time of wafer when processed in production with large lot Waste = (actual CT-CTmin)/CTmin Equipment Output Waste Baseline = designed equipment output capability (wph) Actual performance = actual good production wafer output of the equipment in production Waste = (capacity-actual good wfrs)/capacity * 100

2008 ITRS Public Conference San Francisco, USA 12 DRAFT – DO NOT PUBLISH Factory Integration - AMHS Sub-team June 18, Data Collection Roadmap FICSPE Tool Sensor Host Software EDA E148 (NTPv3) Factory Time Server Data Frequency Time Synchronization

2008 ITRS Public Conference San Francisco, USA 13 DRAFT – DO NOT PUBLISH Process Mask Layers Metal Layers Process Steps Process Mask Layers Metal Layers Process Steps Process Tools Physical Characteristic s (LxWxH, Weight, etc) Process Materials (New Technology Impact) Facility (SF,M2) Clean space, Admin Space, Non-clean space Construction Impact Design/Build Time Schedule Methodology for Future Facility Modeling High Level Approach HIGH LEVEL First Draft Average Tool Size Tool Scaling Factor Admin Scaling Factor Support Space Scaling Factor Cost per square foot

2008 ITRS Public Conference San Francisco, USA 14 DRAFT – DO NOT PUBLISH Total AMC Concept YE Interface