JPNIC Update Toshiyuki Hosaka Japan Network Information Center (JPNIC) 2007.2.28 NIR SIG APNIC Indonesia.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
2 Casa 15m Perspectiva Lateral Izquierda.
1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Copyright © 2007 JPNIC All Rights Reserved. IPv4 Countdown Policy Proposal (LAC ) Toshiyuki Hosaka Working Group on the policy for IPv4 address.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Copyright (c) 2002 Japan Network Information Center Introduction of JPNICs New Registry System Izumi Okutani IP Address Section Japan Network Information.
Major Activities in JPNIC Since APNIC17 Izumi Okutani Japan Network Information Center NIR 18, Fiji 31 August – 3 September, 2004.
ALGEBRA Number Walls
David Burdett May 11, 2004 Package Binding for WS CDL.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Welcome Youth Conference – Monday 19 th March 2007.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 22 November 2012.
| Slide 1 of 63 April 2007 Training Workshop on Pharmaceutical Development with focus on Paediatric Formulations Protea Hotel Victoria Junction, Waterfront.
TESOL International Convention Presentation- ESL Instruction: Developing Your Skills to Become a Master Conductor by Beth Clifton Crumpler by.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Artificial Intelligence
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 9 TCP/IP Protocol Suite and IP Addressing.
PSSA Preparation.
& dding ubtracting ractions.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
JPNIC Open Policy Meeting Update Yuka Suzuki IP Department Japan Network Information Center (JPNIC) NIR Meeting Aug. 21st, 2003.
Izumi Okutani JPNIC IP Department NIR Meeting Feb 2004 JPNIC Open Policy Meeting Update.
Presentation transcript:

JPNIC Update Toshiyuki Hosaka Japan Network Information Center (JPNIC) NIR SIG APNIC Indonesia

2 JPNIC Open Policy Meetings (1) JPOPM10 (2006/7/7) –Revision of JPNIC Policy Development Process (P) Consensus reached –Changing WHOIS registration requirement (P) Consensus reached partially –Lame Delegation cleanup (P) Continue discussion –Reclaiming unused historical address (P) Continue discussion

3 JPOPM10

4 JPNIC Open Policy Meetings (2) JPOPM11 (2006/12/7) –Lame Delegation cleanup (P) Consensus reached –Reclaiming unused historical address (P) Consensus reached –IPv6 portable assignment (P) Consensus reached –Panel discussion – Toward IPv4 address exhaustion (I)

5 JPOPM11

6 Policy Implementation 4-byte AS Number assignment –March, 2007 IPv6 portable assignment for multihoming network –June, 2007 Reclaiming unused historical address –July, 2007

7 Participation Workshop JPNIC Showcase –Back-to-back meeting with JANOG –Introducing the process JPOPM BoF –JPOPM11 eve –Introducing the process, and background behind coming proposals at JPOPM11

8 IPv4 Address Exhaustion Discussion agenda for both JPOPM10 & JPOPM11 WG established to discuss what can be done from policy perspective Sharing the issue within operational & address policy community in JP Proposal coming up at Policy SIG

9 Other Topics Launched official JPIRR service –Mirroring with bogon route detection system –August, 2006 LIR Satisfaction Survey –First Survey in JPNIC –December 2006 Resource Authorization Mechanism –New development project derived from JPNIC CA –Work in progress...

10 LIR Survey Results AAB B Good Not Good x o x o o

11 Questions?