Planner Module – September 20, 2005 Planners Training Exercise Afternoon Session: 1:30 pm to 4:00 pm TRAINING AGENDA.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Project Background and Objectives
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
Upper Providence Township Stormwater Management MS4 Program.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Low Impact Development Best Management Practices
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: I. Planners Training Exercise Review Marie Headquarters Case Study II. Complete.
Better Site Design Sustainability & Stormwater
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: 1:30 pm to 4:00 pm Planners Training Exercise I.Review Marie Headquarters Case Study:
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Low Impact Development Guidebook Kent Gylfe
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Integrating LID Into the Development Planning Process.
Navy and MIDLANT LID Presented by: The Low Impact Development Center, Inc. A non-profit water resources and sustainable design organization
LID Cost Considerations “ALL Technologies” Project Life Cycle Planning Design Construction Operation Maintenance Recapitalization Decommission.
Jason R. Vogel, Ph.D., P.E. Stormwater Specialist Biosystem and Agricultural Engineering Oklahoma State University.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: I. Planners Training Exercise Review Marine Headquarters Case Study II. Complete.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Background and Overview Stormwater NPDES Compliance For New Developments.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
Peter Lowitt Devens Enterprise Commission. Green Infrastructure Policy in the Development of Devens Regional Enterprise Zone Peter Lowitt, FAICP Director:
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: I. Planners Training Exercise Review Marie Headquarters Case Study II. Complete.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Implementing Post-Construction Stormwater Controls Greg Davis, EPA Region 8.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Low Impact Development (LID)
Environmental Toolbox. Technical Module Introduction.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
Low Impact Development Training: Planning Exercise Presented by: The Low Impact Development Center, Inc. A non-profit water resources and sustainable design.
TRAINING AGENDA Engineer Module – September 21, 2005 Afternoon Session: 1:30 pm to 4:00 pm Engineers Training Exercise Break: 2:15 – 2:30pm.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
Land Use. How We Use Land Urbanization of areas is becoming a problem. Thousands of acres of open space just in Pennsylvania have been lost to development.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Comprehensive Thinking and Planning
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Fort Stanwix National Monument Energy Audit Contract
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Sacramento County Stormwater Quality Program
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Sacramento County Stormwater Quality Program
Presentation transcript:

Planner Module – September 20, 2005 Planners Training Exercise Afternoon Session: 1:30 pm to 4:00 pm TRAINING AGENDA

Review Marine Hq Case Study: Overview: –Master Planning Process –Discuss Traditional Site Plan vs. LID Approach –Benefits of LID –Discuss LID Integration in regards to: Objectives Site Analysis Benefit Analysis Site Design Selection Plan Development

DoD Watershed Management Approach Promotes LID Solutions Phase 1 Quick Screening Analysis for Protocol use Phase 2 Assess the Receiving Watershed(s) Conditions, Impairments, and Key Restoration Goals Phase 3 Assess Potential Installation Impacts A. Document baseline land features B. Create baseline compliance site inventory C. Score baseline burden for each activity Phase 4 Identify Cost-Effective Solutions to Mitigate High Priority Impacts Phase 5 Identify Partnerships & Funding Sources Phase 6 Implement Solutions, Track Progress& Reassess on a Regular Basis DoD focus is on implementing LID solutions Partnerships are key The DoD Installation Watershed Impact Protocol available on (DENIX) at

LID important Tool for DoD Planners DoD planners must comply with a myriad of watershed- based laws and regulations –Executive Orders –Clean Water Act and Safe Drinking Water Act NPDES storm water permits for construction, Phase II storm water MS4 permits EPA watershed rule for NDPES Permits (2003) –Local zoning ordinances DoD goal to be sustainable steward of its buildings, lands, and infrastructure in accordance with E.O.s and various voluntary agreements (e.g. Chesapeake Bay Agreement) LID in new construction and retrofits helps DoD managers achieve sustainable facility goals and cost- effectively minimize impacts on impaired watersheds!

Executive Orders Directing Sustainable Approaches EO 13327, Federal Real Property Asset Management, Feb 2004 –Use life-cycle costs for decisions –Incorporate environmental costs EO 13148, Greening the Government Through Leadership in Environmental Management, Apr 2000 –EMS by 2005 –Incorporate Beneficial Landscape Practices into Agency landscaping policies by Apr 01 EO 13123, Greening The Government Through Efficient Energy Management, Jun 1999 –Requires sustainable design principles be applied to the siting, design, and construction of new facilities. EO 13101, Greening The Government Through Waste Prevention, Recycling, And Federal Acquisition, Sep 1998 –Agencies should incorporate EO requirements into contracts, including real property acquisition and management.

How LID Is More Sustainable Grade to encourage sheet flow and lengthen flow paths. Maintain natural drainage divides to keep flow paths dispersed. Disconnect impervious areas such as pavement and roofs from the storm drain network. Preserve the naturally vegetated areas and soil types that slow runoff, filter out pollutants, and facilitate infiltration. Direct runoff into or across vegetated areas to help filter runoff and encourage recharge. Treat pollutant loads where they are generated, or prevent their generation.

Overview: –Master Planning Process –Discuss Traditional Site Plan vs. LID Approach –Benefits of LID –Discuss LID Integration in regards to: Objectives Site Analysis Benefit Analysis Site Design Selection Plan Development

Costs of LID Practices and Methods Type of LID for half Installation Costs O&M Costs (annualized) Bioretention Cell $10,000$925 / year Bioswale $10,000$600 / year Tree box $19,000$950 / year Sand Filter $30,000$2,800 / year Rain barrel $12,500$900 / year Green Roof $250,000$11,600 / year * Infiltration Device $8,000$1,125 / year Permeable Pavement $12,000$950 / year Time of Concentration $8,000$750 / year Landscaping $5,000$575 / year Assumptions: ½ impervious acre. first 0.5” of rainfall is captured. * Excluding replacement: $1,600 / year All costs in 2005 dollars includes replacement in year 25

LID Benefits ENVIRONMENTAL Reduces pollutant loads by volume reduction and filtering. Bioretention and green roof systems provide superior filtering of oil and grease, TPH, thermal pollutant reduction, atmospheric nitrogen deposition WATER CONSERVATION Reduces potable water consumption by minimizing irrigation requirements. Opportunities for cisterns for other non-potable uses. ENERGY MANAGEMENT Shading of parking areas. Vegetation orientation reduces energy consumption. Green roof provides energy benefits. MAINTENANCE Minimizes maintenance requirements through the utilization of water-efficient, native, adaptable, climate-tolerant plant material AESTHETICS Integration of natural landscape design with native plants and additional vegetation in bioretention cells. Green roof may be viewed from building.

Overview: –Master Planning Process –Discuss Traditional Site Plan vs. LID Approach –Benefits of LID –Discuss LID Integration in regards to: Objectives Site Analysis Benefit Analysis Site Design Selection Plan Development

Traditional Site Plan vs. LID Approach Conventional large capital investments in complex and costly engineering strategies pipes water to low spots as quickly as possible LID Design Integrates, green space, native landscape, natural hydrology functions to generate less runoff. Uses micro-scale techniques to manage precipitation as close to where it hits the ground as possible

Traditional Site Plan vs. LID Approach

Conventional vs. LID: Military Housing Development UFC

Conventional vs. LID Stormwater Management ConditionCNTcTc Peak Dischar ge (CFS) 2-year Storm 3” Depth Peak Dischar ge (CFS) 10-year Storm 5” Depth Volume (Depth in Inches) 2-Year Storm Event Volume (Depth in Inches) 10-Year Storm Event Proposed Condition – conventional CN Proposed Condition using LID Design Existing Condition Table Summary of Graphical Peak Discharge Results

Overview: –Master Planning Process –Discuss Traditional Site Plan vs. LID Approach –Benefits of LID –Discuss LID Integration in regards to: Objectives Site Analysis Benefit Analysis Site Design Selection Plan Development

LID Integration: Objectives Identify the LID objectives for the project. Consider these four fundamental aspects of stormwater control: Runoff Volume Peak Runoff Rate Flow Frequency and Duration Water Quality Determine the goals and feasibility for runoff volume, flow frequency and duration, water quality and on-site use of stormwater (e.g. irrigation). Define hydrologic controls required to meet objectives

LID Integration: Site Analysis Evaluate the site design for the best and most appropriate site design strategies Stormwater management controls should be located as close as possible to the sources of potential impacts. The objective is to consider the potential of every part of the landscape, building(s), and infrastructure Preference should be given to those that use natural systems, processes, and materials.

LID Integration: Benefit Analysis The cost-effectiveness of LID-based projects may affect DoD approval. LID projects that incorporate newer technology may involve higher design and construction costs and may take more time to receive approval depends on the level of experience that the project managers, engineers, and contractors have with LID techniques, and on the receptiveness of permitting authorities to LID practices. the cost of implementing LID will decrease as institutional experience increases and the benefits of using LID are realized in practice.

LID Integration: Site Design Selection A site evaluation will facilitate LID design development by providing site details that will assist in the development of an LID program. Conduct a detailed investigation of the site using available documents, such as drainage maps, utilities information, soils maps, land use plans, and aerial photographs. Perform an on-site evaluation highlighting opportunities, such as pollutant-generating areas, potential disconnects from CSOs, and potential green corridors. Evaluate site constraints, such as available space, soil infiltration characteristics, water table, slope, drainage patterns, sunlight, shade, wind, critical habitat, circulation and underground utilities.

LID Integration: Plan Development Identify protected areas, setbacks, easements, topographic features, subdrainage divides, and other site features that should be protected (i.e. floodplains, steep slopes and wetlands) Delineate the watershed and microwatershed areas. Take into account previously modified drainage patterns, roads, and stormwater conveyance systems. Locate baseline hydrologic and water quality data. In order of preference, try to locate: –Local stream gage data and site water quality sampling data –Data from a similar area within region –Local averages –Modeling results Identify applicable local regulations or codes.

LID Integration: Plan Development (continued) Use hydrology as a design element to minimize the runoff potential of the development. –open drainage systems can help to integrate the site with its natural features, creating a more aesthetically pleasing landscape. Determine design storm(s). Regulatory requirements for design storms may also be stipulated in local ordinances, and these may limit or constrain the use of LID techniques or necessitate that structural controls be employed in conjunction with LID techniques. Define modeling technique(s) to be employed. –The model selected will depend on the type of watershed, complexity of the site planning considerations, familiarity of the agency with the model, and level of detail desired. Evaluate current conditions.

LID Integration: Plan Development (continued) Implement non-structural site planning techniques: –Minimize total site impervious area –Use alternative roadway layouts that minimize imperviousness –Reduce road widths –Limit sidewalks to one side of roads –Reduce on-street parking –Use permeable paving materials, such as permeable pavers or porous asphalt. Minimize directly connected impervious areas Modify drainage flow paths to increase time of concentration (Tc) Define development envelope.

LID Integration: Plan Development (continued) Evaluate site planning benefits and compare with baseline values. The modeling analysis is used to evaluate the cumulative hydrologic benefit of the site planning process in terms of the four evaluation measures. Evaluate the need for Integrated Management Practices (IMPs). If site planning is not sufficient to meet site LID objectives, additional hydrologic control needs may be addressed through the use of IMPs. Evaluate supplemental needs. If after use of IMPs supplemental control for either volume or peak flow is still needed, selection and listing of additional management techniques should be considered.

LID Integration: Plan Development (continued) Design LID Site or Master Plan Sketch a design concept that distributes the LID practices appropriately around the project site. Develop a master plan that identifies all key control issues (water quality, water quantity, water conservation) and implementation areas. Specify specific LID technologies and any connections they have to stormwater overflow units and sub-surface detention facilities.

Break: 2:15 – 2:30pm II.Complete 1391 for Integration of LID Approach into New Construction of Stormwater System Projects: 2:30 - 4:00pm –Funding Aspects –Development of Planning Objectives, NEPA & Performance Indicators –1391 Process/Completion

Funding Recommendations Optimize Funding Sources through Integrated Program Management Coordinate Planning, Engineering & Environmental Installation Efforts Tie Project Justification to Environmental Management System Requirements, Sustainability & Environmental Compliance Requirements

DOD Budget Process-PPBS (Planning, Programming, & Budgeting System) Installations Budget Requirements over 6 Year Period for Future Year Defense Plan (FYDP) Based on Legal Requirements and Program Goals. Program Budget Projections are Submitted & Reviewed by Each DOD Component’s Major Commands/Regions & HQ Component HQs Submit to DOD.

Tools for Meeting DOD Project Justification & Design Requirements LID Center Design & Cost Criteria DOD United Facilities Criteria (UFC) LID Design Manual DOD and Service HQs EPR Guidance & Example Projects DOD Sustainability Programs Army Corps 1391, Economic Analysis, & Cost Estimate Development Tools Naval Facilities Engineering Command – Unified Facilities Criteria (Design: Low Impact Development Manual – still in Draft) Air Force- AFCEE OFEE (Federal projects, Installation Lessons Learned etc) State Regulatory Office – Storm Water Management Manuals

DOD Funding Sources for LID (Site Design, Construction & Maintenance) Military Construction (MILCON) Environmental (Compliance, Conservation, P2) Operations & Maintenance (O & M) Research, Development, Testing and Evaluation (RDT & E) Legacy ITAM- Funds for Sustaining Military Training Areas Army Corps of Engineer Funding Sources Partnerships & Grants

Maintaining Funding Select Low Cost & Low Maintenance Design Ensure Design Incorporates SOP for Proper Maintenance On a Regular Basis: Quantify, Inspect & Document Best Business Practice Results for Funds for Future Modifications Program Recurring Funding for Maintenance & Documented Need for Modification Document Reduction of Program Requirements & Environmental Liabilities due to Low Impact Design

Contracting & Estimating Avenues Low Impact Development Center Army Corps GSA contentType=GSA_OVERVIEW contentType=GSA_OVERVIEW DLA SOWs & Cost Estimate Documents DLA Contract Site AFCEE

Installation Examples Fort Bragg Sustainability Plan Goals 1 and 2: Water Resources Reduce the amount of water taken from the Little River by 70% by Water discharged from Fort Bragg will meet or exceed North Carolina High Quality Water (HQW) Standards by –Objective 2: Design/upgrade facilities to protect and enhance water quality and quantity. Goal 4: Sustainable Design Meet minimum platinum standard for all construction by 2929, Renovate 25% of all existing structures to at least a bronze standard by 2020, using the Sustainable Project Rating Tool (SPiRiT) standard –Objective 1: Develop strong organizational management system that institutionalizes sustainable design concepts –Objective 2: Improve site selection process and development for major military construction and small construction projects –Objective 5: Optimize Materials and Resources Web site:

DOD Funding Sources for LID (Site Design, Construction & Maintenance) Military Construction (MILCON) Environmental (Compliance, Conservation, P2) Operations & Maintenance (O & M) Research, Development, Testing and Evaluation (RDT & E) Legacy ITAM- Funds for Sustaining Military Training Areas Army Corps of Engineer Funding Sources Partnerships & Grants