Work breakdown structure https://store.theartofservice.com/the-work-breakdown-structure-toolkit.html.

Slides:



Advertisements
Similar presentations
Work Breakdown Structures
Advertisements

PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Software Quality Assurance Plan
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
Presented by Heorot.net.  Understand the need for a PenTest Methodology  Identify the most-used methodologies  Understand Advantages and Limitations.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Work Breakdown Structure.
Project Scope Management
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Work Breakdown Structures (WBS) Current: 14 January 2015.
Chapter 5: Project Scope Management
Project Management Session 7
Chapter 5: Project Scope Management
Engineering Design Development. Turner College and Career High School.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Gantt Chart Engineering Design Development. Turner College and Career High School.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Software Project Management Course Instructor Samana Zehra (Assistant Professor)
Project Management Lecture 5+6 MS Saba Sahar.
PS Introduction: What Is a Project ?
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Project Management. The Project Management Institute
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Chapter 5: Project Scope Management Information Technology Project Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
05/19/08 PM Boot Camp I International Sign Association Risk/Regulatory Compliance Department Las Vegas Division.
Project Life Cycle.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Work Breakdown Structure Use and Demo
Applied Software Project Management
Strengthening Partnerships: Shaping the Future Portland, OR June 6 th – 10 th, 2004 Planning for Success Implementing the California EDRS.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SOFTWARE PROJECT MANAGEMENT
IT-301 Project Management I: Unit 4: Cost Management.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
WEEK 3 Project Planning.
The Project Management Process Groups
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
Process and customizations
Process 4 Hours.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Popular Frameworks and Methodologies
By Wilmer Arellano Spring 2010
Popular Frameworks and Methodologies
Work Breakdown Structure
Work Breakdown Structures (WBS)
Defining the Activities
Popular Frameworks and Methodologies
Project Management Process Groups
Work Breakdown Structure
Project Management Chapter 11.
Some Practical Considerations for Systems Engineers in a Lean-Agile Airborne Weapons System Program June 12, 2018 Ken Garlington.
SD5953 Successful Project Management Work Breakdown Structure
PLANNING & SCHEDULING (First Part)
Software System Integration
Introduction to Project Management
Presentation transcript:

work breakdown structure

Project management Work breakdown structure 1 The work breakdown structure (WBS) is a tree structure that shows a subdivision of effort required to achieve an objective—for example a program, project, and contract. The WBS may be hardware-, product-, service-, or process-oriented.

Project management Work breakdown structure 1 The work breakdown structure provides a common framework for the natural development of the overall planning and control of a contract and is the basis for dividing work into definable increments from which the statement of work can be developed and technical, schedule, cost, and labor hour reporting can be established.

Systems development life-cycle - Work breakdown structured organization 1 The upper section of the work breakdown structure (WBS) should identify the major phases and milestones of the project in a summary fashion

Work breakdown structure 1 A 'work breakdown structure (WBS)', in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components.

Work breakdown structure 1 A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.Booz, Allen Hamilton [ point/Final_Module_2.ppt Earned Value Management Tutorial Module 2: Work Breakdown Structure], [ management/tools-and-resources/ Office of Science, Tools Resources for Project Management], science.energy.gov

Work breakdown structure - Overview 1 For each element of the work breakdown structure, a description of the task to be performed is generated.Electronic Industries Alliance Standard Systems Engineering Capability Model EIA This technique (sometimes called a system breakdown structure Institute of Electrical and Electronics Engineers Standard for Application and Management of the Systems Engineering Process IEEE Std ) is used to define and organize the total Scope (project management)|scope of a project.

Work breakdown structure - History 1 Koppelman Earned Value Project Management CROSSTALK: The Journal of Defense Software Engineering July 1998, p 20] While the term work breakdown structure was not used, this first implementation of PERT did organize the tasks into product-oriented categories.Haugan, Gregory T., Effective Work Breakdown Structures, pp7-8

Work breakdown structure - History 1 L., [ Study of Methods for Evaluation of the PERT/Cost Management System], MITRE Corporation, June 1964 In 1968, the DoD issued Work Breakdown Structures for Defense Materiel Items (MIL-STD-881), a military standard requiring the use of work breakdown structures across the DoD.MIL-STD-881, 1 November

Work breakdown structure - History 1 The document has been revised several times, most recently in The current version of this document can be found in Work Breakdown Structures for Defense Materiel Items (MIL-STD- 881C).MIL-STD-881C, [ e.cfm?ident_number=36026 Work Breakdown Structures for Defense Materiel Items], 3 October 2011 It includes WBS definitions for specific defense material commodity systems, and addresses WBS elements that are common to all systems.

Work breakdown structure - History 1 In 1987, the Project Management Institute (PMI) documented the expansion of these techniques across non-defense organizations. The Project Management Body of Knowledge (PMBOK) Guide provides an overview of the WBS concept, while the Practice Standard for Work Breakdown Structures is comparable to the DoD handbook, but is intended for more general application.Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN

Work breakdown structure - 100% rule 1 An important design principle for work breakdown structures is called the 100% rule.Effective Work Breakdown Structures By Gregory T. Haugan, Published by Management Concepts, 2001, ISBN , p.17 It has been defined as follows:

Work breakdown structure - 100% rule 1 The work represented by the activities in each work package must add up to 100% of the work necessary to complete the work package.Practice Standard for Work Breakdown Structures (Second Edition), published by the Project Management Institute, ISBN , page 8

Work breakdown structure - Mutually exclusive elements 1 Mutually exclusive: In addition to the 100% rule, it is important that there is no overlap in scope definition between different elements of a work breakdown structure

Work breakdown structure - Plan outcomes, not actions 1 Work breakdown structures that subdivide work by project phases (e.g

Work breakdown structure - Coding scheme 1 The purpose for the numbering is to provide a consistent approach to identifying and managing the WBS across like systems regardless of vendor or service.MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶4.3 For example '1.1.2 Propulsion' (in the example below) identifies this item as a Level 3 WBS element, since there are three numbers separated by a Decimal separator|decimal point

Work breakdown structure - Coding scheme 1 A practical example of the WBS coding scheme isMIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011 Appendix A, ¶A.3

Work breakdown structure - Terminal element 1 Three levels are the minimum recommended, with additional levels for and only for items of high cost or high risk,MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶1.4.1 and two levels of detail at cases such as systems engineering or program management,MIL- STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶ with the standard showing examples of WBS with varying depth such as software development at points going to 5 levelsMIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-6 or fire-control system to 7 levels.MIL-STD- 881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Fig.3-1

Work breakdown structure - Consistent to Norms 1 Navy must respect that the nautical terms and their hierarchy structure put into MIL- STDMIL-STD-881C, Work Breakdown Structures for Defense Materiel Items, 3 October 2011, ¶Appendix E are embedded in Naval Architecture and that matching Navy offices and procedures have been built to match this naval architecture structure, so any significant change of WBS element numbering or naming in the hierarchy would be unacceptable.

Work breakdown structure - Example 1 The figure on the left shows a work breakdown structure construction technique that demonstrates the 100% rule and the progressive elaboration technique. At WBS Level 1 it shows 100 units of work as the total scope of a project to design and build a custom bicycle. At WBS Level 2, the 100 units are divided into seven elements. The number of units allocated to each element of work can be based on effort or cost; it is not an estimate of task duration.

Systems Development Life Cycle - Work breakdown structured organization 1 The upper section of the work breakdown structure (WBS) should identify the major phases and milestones of the project in a summary fashion