Status of ESA’s Mars Activities MEPAG meeting Washington DC, May 2014

Slides:



Advertisements
Similar presentations
The BepiColombo Mission
Advertisements

Mars Invasion: Spirit, Opportunity, Mars Express Meghan McGovern.
Modern Exploration Global Surveyor.  Objectives:  High resolution imaging of the surface  Study the topography and gravity  Study the role of water.
The ExoMars Program Marcello Coradini Head, Exploration Office and Coordinator Solar System Missions ESA NOTE ADDED BY JPL WEBMASTER: This document was.
Instrument Adron-RM for ExoMars 2018
Russian contribution to ExoMars and the outline of further Mars Exploration programme NPOL TEAM IKI TEAMS COORDINATOR DANIIL RODIONOV
1 16 June 2011, Lisbon (P) MEPAG J. L. Vago, Michael Meyer, and iJSWG Team 2018 Joint Rover Objectives NOTE ADDED BY JPL WEBMASTER: This content has not.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
Mars Exploration By Jacob Stinar. Water on Mars.
Ken Farley, Project Scientist Ken Williford, Deputy Project Scientist
1 ExoMars Programmatic situation December 2014 Rolf de Groot Head of Robotic Exploration Coordination Office ESWT#7 meeting, 9-10 December 2014, Altec,
Modern Exploration Mars Pathfinder  “NASA’s Mars Pathfinder mission – the first spacecraft to land on Mars in more than 20 years and the first ever to.
Mars Express Status 27-Nov-09 Olivier Witasse, ESA.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
M.C. De Sanctis, F. Altieri, E. Ammannito, T. Di Iorio, S. De Angelis, A. Frigeri, P. Cerroni and the Ma_Miss team Istituto di Astrofisica Spaziale e Planetologia,
Solar System Physics Group Open Day Manuel Grande Aberystwyth in Space – the Moon ExoMars Chandrayaan STEREO Bepi VEX Solar B SDO LoFAR IHY.
Design of a Science Operations Centre for the ExoMars 2016 Trace Gas Orbiter Mission A. Cardesin Moinelo, D. Frew, L. Metcalfe, P. Martin, N. Manaud, A.
Mars Exploration Directorate National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California.
Intelligent Robotics Group NASA Ames Research Center Intelligent Robotics Group NASA Ames Research Center Planning for the Mapping and Exploration of Human.
Understand how space organizations use concepts of operations and system integration plan to ensure the success of their program Space Concept of Operations.
ExoMars LSEC 2018 Landing Site Engineering Constraints LSSWS# December 2014 L. Lorenzoni and ExoMars Project.
Preliminary model payloads for the Ganymede Lander and the Relay orbiter 7 March, 2013 Laplace-Ganymede lander mission Oleg Korablev,
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Overview of the MELOS-1, Mars exploration program in Japan MEPAG meeting 2014 Hirdy Miyamoto (U of Tokyo) on behalf of Takehiko Satoh (MELOS-1 working.
MEPAG in Lisbon, Portugal (16-17 June 2011) MELOS Mars Exploration MELOS : Japan’s Mar Exploration Plan for 2020’s T. Satoh (JAXA) and MELOS Working Group.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California Mars Exploration Directorate.
DOC-TAS-EN-002 ALTEC Auditorium - Torino - Italy December 9-10, 2014 Bruno MUSETTI ESWT#7 – ESWT#7.
Mars Exploration Rovers (MER) Entry, Descent, Landing, and Deployment.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
1 Science and Robotic Exploration (SRE) ESA’s planetary probes 10 th International Planetary Probe Workshop David Agnolon & Peter Falkner, Solar System.
NETwork studies of MARS climate and interior A.V.Rodin, V.M.Linkin, A.N.Lipatov, V.N.Zharkov, T.V.Gudkova, R.O.Kuzmin.
Planetary Motion By Carol Greco. Why do planets move the around the sun the way they do? First you need to understand that scientists have discovered.
CURIOSITY Antoine Henderson Fiona Ward. Launch and Landing  Launched:  November 26, 2011  Cape Canaveral, Florida  Landed: August 6, 2012  August.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
Modern Exploration Mars Odyssey  NASA’s theme for Mars exploration, “Follow the Water”, began with the 2001 Mars Odyssey mission  Odyssey, and every.
The ESA Science Program for the progress of European society Luigi Colangeli Head, ESA Solar System Missions Division and Coordinator, ESA Solar System.
ESWT # Rover operations concept
PHOBOS - GRUNT Phobos Sample Return Mission 1. Basis for choice, goals and methods of study.
Mars Geochemistry and Future Experiment Needs Mark A. Bullock August 7, 2002.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
Workshop on Martian Phyllosilicates: Recorders of Aqueous Processes? MEPAG, March 4, 2009 J-Pierre Bibring IAS Orsay, France ias.fr NOTE ADDED.
Evaluating New Candidate Landing Sites on Mars: Current orbital assets have set the new standard for data required for identifying and qualifying new Mars.
Laplace Meeting - Frascati, April 2008 MSSL/UCL UK Penetrators for Europa MSSL/UCL UK Professor Andrew Coates on behalf of UK Penetrator Consortium.
By: Kiana Gathers. Objectives  To study the climate, the planet’s structure, its geology, and to search for traces of water.  To take global surveys.
The Third Moscow Solar System Symposium 8 – 12 October 2012, Moscow, Russia First Data from DAN Instrument onboard MSL Curiosity Rover M. Litvak and I.
Turin. ALTEC. DESCENT MODULE AND SURFACE PLATFORM ExoMars Science Working Team
Interlude  Viking mission operations ended in the early 1980s  Viking missions gave scientists the most complete picture of Mars to date. What does this.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
Science investigations in the framework of expedition to Europa
Enabling Capabilities A Robotic Field Geologist Access to a site mapped from orbit Long life, mobility, capability to explore a local region Remote sensing.
July 29, MEPAG Goals Committee Update Jeffrey R. Johnson Chair, MEPAG Goals Committee USGS Astrogeology Science Center Flagstaff,
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Robotics and Autonomy Test Facility - Hardware Verification needs Elie Allouis HRAF Workshop – 28/02/2012.
MEPAG: Action Items, Forward Planning Jack Mustard, MEPAG Chair MRO HiRISE / U. Arizona / JPL / NASA NOTE ADDED BY JPL WEBMASTER: This document was prepared.
Modern Exploration Mars Global Surveyor  “The mission will provide a global portrait of Mars as it exists today…This new view will help planetary scientists.
The ionosphere of Mars and its importance for climate evolution A community white paper for the 2009 Planetary Decadal Survey Paul Withers
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
Japanese mission of the two moons of Mars with sample return from Phobos Hirdy Miyamoto (Univ Tokyo) on behalf of MMX team NOTE ADDED BY JPL WEBMASTER:
ESA UNCLASSIFIED – For Official Use FISO COLLOQUIUM, 18 June 2014 B. HUFENBACH ESA’S SPACE EXPLORATION STRATEGY.
ISRO –Programmatic Update S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG INMWG Meeting on 23 Rd Feb 2016.
DAVINCI: Deep Atmosphere Venus Investigation of Noble Gas, Chemistry, and Imaging One out five NASA’s Discovery-class missions for Phase A studies. A 63.
ASI Science Programme Barbara Negri - Italian Space Agency (ASI) Head of Exploration and Observation of the Universe Department 10 Years of PAMELA.
JUpiter Icy Moons Explorer (JUICE)
Mars 2020 Rover Mission The Mars 2020 mission addresses high-priority science goals for Mars exploration, including key questions about the potential for.
Curious about Curiosity?
OSIRIS-REx: The Origins, Spectral Interpretation, Resource Identification, Security, Regolith Explorer is a.
Title (do not change font or font size for any of the chart elements)
Chang’e 5 Mission Chinese Lunar Exploration Program (CLEP)
Presentation transcript:

Status of ESA’s Mars Activities MEPAG meeting Washington DC, 13-14 May 2014 Rolf de Groot European Space Agency Robotic Exploration Coordination Office Science and Robotic Exploration Directorate NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by, NASA, JPL, or the California Institute of Technology. This document is being made available for information purposes only, and any views and opinions expressed herein do not necessarily state or reflect those of NASA, JPL, or the California Institute of Technology.

Mars Exploration at ESA 2 TGO and EDM Rover + Platform PHOOTPRINT ExoMars INSPIRE Mars Express MSR elements 2003 2030+

Status and near future milestones Mars Express Mission: Status and near future milestones Status: Spacecraft and payload status: very good Fuel estimates enough for a few more years. Mission extension: until end of 2016, 2017-2018 proposal Q4 2014. 29 December 2013: closest ever flyby of Phobos (~ 45 km). Near future milestones 19 October 2014: Siding Spring comet flyby (distance ~ 135,000 km) October 2014 onwards: coordinated measurements with the NASA MAVEN mission. Scientific objective: study of the plasma environment and atmospheric escape. October 2016: Mars Express relays data from the ExoMars entry and descent module

Trace Gas Orbiter (TGO) EDL Demonstrator Module (EDM - Schiaparelli) ExoMars Programme Two missions launched in 2016 and 2018, respectively The 2016 flight segment consists of a Trace Gas Orbiter (TGO) and an EDL Demonstrator Module (EDM) - Schiaparelli The 2018 flight segment consists of a Carrier Module (CM) and a Descent Module (DM) with a Rover and a stationary Surface Platform 2016 Mission 2018 Mission And Trace Gas Orbiter (TGO) Carrier Module (CM) Descent Module (DM) ESA ESTRACK Proton M/Breeze M Proton M/Breeze M ROSCOSMOS Antennas NASA DSN Surface Platform Rover EDL Demonstrator Module (EDM - Schiaparelli) MOC @ ESOC Science Operations Centre ESAC LPOCC ROCC Lading Platform Operations Center Rover Operations Center 4

2016 2016 Mission Objectives TECHNOLOGY OBJECTIVE SCIENTIFIC OBJECTIVE E X O M A R S 2016 Mission Objectives TECHNOLOGY OBJECTIVE Entry, Descent, and Landing (EDL) of a payload on the surface of Mars. 2016 SCIENTIFIC OBJECTIVE To study Martian atmospheric trace gases and their sources. To conduct surface environment measurements. Provide data relay services for landed missions until 2022. 5

2018 2018 Mission Objectives TECHNOLOGY OBJECTIVES E X O M A R S 2018 Mission Objectives TECHNOLOGY OBJECTIVES Surface mobility with a rover (having several kilometres range); Access to the subsurface to acquire samples (with a drill, down to 2-m depth); Sample acquisition, preparation, distribution, and analysis. Qualification of Russian ground-based means for deep-space communication Adaptation of Russian on-board computer for deep space missions and ExoMars landed operations Development and qualification of throttleable braking engines for prospective planetary landing missions 2018 SCIENTIFIC OBJECTIVES To search for signs of past and present life on Mars; To characterise the water/subsurface environment as a function of depth in the shallow subsurface. To characterise the surface environment. 6

Current status ExoMars programmatic status ESA – Roscosmos ExoMars agreement in force (14 March 2013) ESA – NASA MoU on ExoMars 2016 in force (29 April 2014) Revised Science Management Plan approved (February 2014) 2016 ExoMars Mission (TGO and EDM) Contract signed with Industry for full development, launch and operations Operations and science ground segment in development System Critical Design Review (S-CDR) board meeting on 18-4-2014 concluded no show stoppers but requested further reporting on some issues 2016 mission on schedule with limited margins Effect of US State Department block on Export Licences still tbd 2018 ExoMars Mission (CM, DM, Rover) The 2018 mission is in Phase B (CM, DM), while the Rover is in Advanced CD System Requirements Review (SRR) close-out on 17 December 2013 Landing Site Selection process kicked-off in December 2013 (see JV presentation) AO for Surface Platform instruments in preparation (Q2 2014 tbc) Descent Module Design Project Review ongoing (March-June 2014) System Preliminary Design Review (S-PDR) in preparation (May-July 2014) Full Industrial Proposal expected in Q3 2014

ESA activities for future Mars exploration The Mars Robotic Exploration Preparation Programme (MREP) Mission studies for post-ExoMars missions PHOOTPRINT, INSPIRE, MPL-SFR, .. Exploration Technology Development Mission specific technologies Long-term enabling technologies (Nuclear Power Systems, Advanced Propulsion) General MSR preparatory technology activities (eg. sampling, PP related technologies, sample rendezvous and capture, precision landing, …) MREP phase 2 ongoing, open for new subscriptions at C-MIN 2014

Mars Sample Return: Current developments in ESA Technology development activities are implemented in ESA Mars Robotic Exploration Preparation Programme (MREP) and focused on specific themes: MSR Orbiter, including Orbiting Sample capture and biosealing in orbit, and Earth Return Capsule Sample fetch rover: Small rover (100 kg) with high surface mobility Precision landing on Mars: development of a capability to deliver 300 kg to Mars surface with a precision better than 10 km Sample receiving facility

PHOOTPRINT Mars-2024 candidate Return a sample of ~100 g from Phobos Reference Payload ~35 kg Cameras, VIS-NIR and Mid-IR spectrometers Heritage from Rosetta, VEX and Bepi-Colombo High and recognised intrinsic science value Origin and formation of Phobos; Solar System evolution Prepares critical building blocks for MSR Sampling, transfer and sealing Short range Rendezvous Earth Return Capsule Sample receiving facility Possible scenarios for cooperation with Roscomos identified CDF study on joint mission on-going April-May 2014 Industrial phase A/B1 study in 2014 / 2015 Implementation proposal C-MIN 2016 (tbc)

Other candidate missions: INSPIRE and MPL Network of 3 surface elements for Mars interior and atmosphere characterisation. Timely after InSight and with potential of TGO being available Mature Payload, ~ 15 kg Seismometer, Mole with Heat Flow and Physical Properties Probe, Meteorological Boom, Radio-Science Package and Camera Heritage from ExoMars/Humboldt and Insight developments Soyuz launch of a Mars Precision Lander (MPL) + small science rover (10 km landing site accuracy) Explore a new region of Mars to investigate the (hydro-)geologic history, and habitability potential, taking benefit of high mobility Rover mobility > 170 m/sol capability, 3.5 to 5 hours available to drive per sol. GNC high mobility algorithms developed by MREP MSR preparation: MPL could be a segment of MSR Campaign, delivering the sample fetch rover INSPIRE

Back-up slides

Credit: Kees Veenenbos E X O M A R S Trace Gas Orbiter UVIS (0.20 – 0.65 mm) l/Dl ∼250 IR (2.3 – 3.8 mm) l/Dl ∼10,000 IR (2.3 – 4.3 mm) l/Dl ∼20,000 NOMAD High-resolution occultation and nadir spectrometers Nadir Limb SO Atmospheric composition (CH4 ,O3 , trace species, isotopes) dust, clouds, P&T profiles CaSSIS High-resolution, stereo camera Mapping of sources Landing site selection ACS Suite of 3 high-resolution spectrometers Near IR (0.7 – 1.7 mm) l/Dl ∼20,000 Atmospheric chemistry, aerosols, surface T, structure IR (Fourier, 2 – 25 mm) l/Dl ∼4000 (SO)/500 (N) Mid IR (2.2 – 4.5 mm) l/Dl ∼50,000 Nadir Limb SO FREND Collimated neutron detector Mapping of subsurface water And hydrated minerals Credit: Kees Veenenbos 13

Pasteur Payload PanCam ISEM MicrOmega CLUPI RLS WISDOM MOMA FREND E X O M A R S Pasteur Payload WAC: 35° FOV, HRC: 5° FOV PanCam Wide-angle stereo camera pair High-resolution camera Geological context Rover traverse planning Atmospheric studies ISEM IR spectrometer on mast λ = 1.15 – 3.3 μm, 1° FOV Bulk mineralogy of outcrops Target selection Analytical Laboratory Drawer λ = 0.9 – 3.5 μm, 256 x 256, 20-μm/pixel, 500 steps MicrOmega VIS + IR Spectrometer Mineralogical characterization of crushed sample material Pointing for other instruments spectral shift range 200–3800 cm–1, resolution ≤ 6 cm–1 RLS Raman spectrometer Geochemical composition Detection of organic pigments Laser-desorption extraction and mass spectroscopy MOMA LDMS + Pyr-Dev GCMS Broad-range organic molecules at high sensitivity (ppb) Chirality determination Pyrolisis extraction in the presence of derivatisation agents, coupled with chiral gas chromatography, and mass spectroscopy 20-μm resolution at 50-cm distance, focus: 20 cm to ∞ CLUPI Close-up imager Geological deposition environment Microtexture of rocks Morphological biomarkers 3 – 5-m penetration, 2-cm resolution WISDOM Ground-penetrating radar Mapping of subsurface stratigraphy FREND Passive neutron detector Mapping of subsurface Water and hydrated minerals λ = 0.4 – 2.2 μm Drill + Ma_MISS IR borehole spectrometer In-situ mineralogy information 14

MREP Technology Development Overview Earth Return Capsule developments Sample Capture and biosealing in orbit developments Nuclear Power Sources RHU & RPG , based on Am(241) radioisotope 1000N 500N Precision Landing equipment : Inertial Measurement Unit, altimeter miniaturisation 1 kN bi-liquid engine development for Mars insertion Sample Fetch Rover and high mobility demonstration