17.March.20051 Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)

Slides:



Advertisements
Similar presentations
POWER FACTOR IN ELECTRICAL ENERGY MANAGEMENT
Advertisements

Mike Thornton National Sales Manager
QUALITY AND TECHNOLOGY
Siemens Building Technologies Building Technologies Variable Frequency Drives Harmonics Overview.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
The Integration of Renewable Energy onto the Existing Grid Dr Norman MacLeod Technical Director, HVDC.
Problem #2-8 A 480 – 120 V, 60 Hz transformer has its high voltage winding connected to a 460 V system, and its low voltage winding connected to a 24/32.8°Ω.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
Distributed Power Systems ELCT 908
Plant Utility System (TKK-2210)
Power Converters and Power Quality Karsten KAHLE, CERN CAS Power Converters 2014, Baden (CH) 2.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
ET3380 Principles and Methods of Electric Power Conversion David Morrisson MS,MBA Week 1.
1 Digital Voltage Transducer family DV from 1200 to 4200 V RMS DVL from 50 to 2000 V RMS.
Preliminary Studies of the Electric Power Distribution for CLIC
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
InnovationValueTeamwork SHENZHEN INVT ELECTRIC CO., LTD.
1 HARMONIC ANALYSIS OF SELECTED DG DEVICES Pradipta Kumar Tripathy, Durgesh P. Manjure, Dr. Elham B. Makram CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
THE NEW STATIC VAR COMPENSATOR FOR SPS – COMMISSIONING RESULTS based on the CIRED2003 conference paper from K. Kahle, J. Pedersen (CERN) and T. Larsson,
REACTIVE POWER COMPENSATION
LARSSON SE Session 2 – Block 2 Barcelona May The new 150 Mvar, 18 kV SVC at CERN – background, design and commissioning K. Kahle, J Pedersen,
A second Thyristor Controlled Static Var Compensator for SPS
7/08/2002PP.AFD.07 Harmonic Quality1 of 49 Yaskawa Electric America Harmonic Currents, Voltages and Your Building Power System.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Asea Brown Boveri Jumet S.A. FD 1/30 ASEA BROWN BOVERI Harmonic Problem ? Are Tuned Filters THE Solution ?
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Chapter 3 – Diode Circuits – Part 3
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May UNIFIED REGIONAL PLANNING OF ELECTRICITY AND GAS DISTRIBUTION NETWORK.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Power Quality Issues Power Electronics Group.
1 March 2001 EPCOS FK PM PFC Basics of Power Factor Correction BASICS OF POWER FACTOR CORRECTION.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
Effects of Harmonics on Capacitors Electrical System
Situation of the Static Var Compensators at CERN.
Electricity is produced at the power station.
Introduction to Global AC Power
High Voltage Engineering High Voltage Direct current (HVDC)
Presented By Deepak Kumar Bari Regd. No
MEDIUM VOLTAGE APPLICATIONS.
CLIC Civil Engineering & Infrastructure Working Group Meeting
EET 422 EMC & COMPLIANCE ENGINEERING
ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY
Harmonics can be reduced by using of line inductances (AC-chokes) or
the CERN Electrical network protection system
Business opportunities related to CERN electrical network
آشنائی با کوره های قوس الکتريکی DC و مقايسه آن با کوره های AC
SHUNT ACTIVE FILTER It is a voltage-source converter connected in shunt with the same ac line and acts as a current source to cancel current distortions,
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)

17.March Characteristics of the load - repetitive Voltage Disturbances on 18 kV level - due to pulsating load - related to reactive power consumption - disturbances seen by other users at CERN - Harmonics - power converters have a specific harmonic spectrum - disturbing the sine-wave of 18kV bus voltage at CERN - disturbances seen by other users at CERN - Reactive Power consumption (130 kV and 400 kV networks) - impact on power losses - impact on rating of electrical equipment - impact on CERN electricity costs

17.March Characteristics of the load - power pulses (1 pulse every 30 min) P – active power Q – reactive power S – apparent power Peak value = 5.5 MVA, RMS = 0.5 MVA (thermal rating)

17.March Characteristics of the load - voltage disturbances (once every 30 min) 130 kV: delta U = 0.15 %18 kV: delta U = 1.1 % OK OK (once every 30min) - Commissioning period - Operation - during commissioning: pulses 50% once every 10 min

17.March Characteristics of the load - Reactive Power Consumption - no reactive power compensation (comes from 130 kV / 400 kV network) - RMS value is low (one pulse every 30 min) - short duration of the experiment (2 years): no counter measures - our energy contract is adapted (we pay nothing for reactive power) - if no compensation: AC equipment rating needs to be 150 % - if no compensation: power losses increase slightly Conclusion: No Problem.

17.March Characteristics of the load - Harmonics - 12-pulse power converters - typical harmonics 550, 650, 1150 and 1250 Hz - low harmonic distortion - in addition: harmonic filtering for Meyrin at JURA substation Conclusion: No Problem.

17.March TS-EL Existing 18 kV cubicleExisting transformer pit Building 193 (18 kV station ME49)

17.March TS-EL work Scope of supply and budget -18 kV cubicle (cubicle existing, but new protection)10 kCHF -18 kV AC cabling10 kCHF - LV AC cabling20 kCHF - DC cabling (cable routing difficult)40 kCHF - Engineering and Documentation 15 kCHF SUBTOTAL (TS-EL):95 kCHF SUBTOTAL (AB-PO):110 kCHF TOTAL: 205 kCHF

17.March Questions? Karsten KAHLE (TS-EL)