Proposer: Colette Baldwin – E.ON Panel Date: 21 st August 2014 0479A: Mod Title: Inclusion of email as a valid UNC communication.

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Advertisements

Business Law: Ch 6 Offer and Acceptance.
Chapter 6: Contract Law Law in Society
Responding to Inspection Findings
Contract Law Chapter 6.
Mod 0479 – Inclusion of as a valid code communication NGN to provide a view on legal status of , a definition of what is an e- mail communication.
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
Offer and Acceptance Chapter 6. Because of its limited resources the court system is very selective in what it will enforce. Criminal laws and laws allowing.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Event Management & ITIL V3
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Outlook 2003 Rules Creating/Modifing Rules Junk By sender By receipient By Subject By John Marcus – Presentation.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IM NETWORK MEETING 20 TH JULY, 2010 CONSULTATION WITH 3 RD PARTIES.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Bell Ringer What should a contract be based on? What things should be included in a contract? What things could make a contract no longer applicable?
Code Administrators Working Group (CAWG) Meeting 3, 29th October 2008.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
HIPAA Privacy Rule Positive Changes Affecting Hospitals’ Implementation of the Rule.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
[ Direct marketing – an introduction to data protection and privacy] For [insert name of organisation] presented by [insert name of presenter] on [date]
Offer and Acceptance Chapter 6.
Achieving Contract Formation
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Contract & Consumer Law Chapter 2
Proposer: Matthew Hatch Panel Date: 20/10/16
Distribution Workgroup 24/11/16
Grid Code What is the Standard Modification Process? Panel
Proposed Data Standards - Main Points
Code Governance Review UNC Modification Proposals
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
KANSAS STATE UNIVERSITY
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
Project Nexus Workgroup
UNC 0XXX: Mod Title: insert title
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Transmission Workgroup 6th March 2014
Long Term Non Firm Capacity Update
Transmission Workstream 1st September 2005
Proposer: Debbie Brace Panel Date: 20th March 2014
Deferral of Retrospective Updates Functionality
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
UNC Modification Performance Assurance Framework Incentive Regime
Implementation Approach Distribution Workgroup – June 2014
Scheme for Growth Pilot
Project Nexus Workgroup
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
DSG Governance Group Recommendations.
New Special Education Teacher Webinar Series
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Proposer: Colette Baldwin – E.ON Panel Date: 21 st August A: Mod Title: Inclusion of as a valid UNC communication

Why change? has superseded fax as a more efficient and common form of business communication but remains disallowed as an official form of UNC communication, despite all relevant parties using it across other aspects of their business. Where formal communication grants rights or imposes obligations on parties, the deemed sending/receipt for communication is not sufficient to bind the parties contractually and it is important that the network code reflects the necessary safeguards needed to ensure that there is the “meeting of minds” in the evolution of that contractual relationship between the parties. The rules need to reflect the ability of the parties to communicate whilst recognising that there are some technical challenges that interrupt the instantaneous communication that s offer, for example some systems are set up such that they automatically return s if they detect what they believe to be a virus/Trojan horse/spyware.

Options The original proposals are in our opinion deficient in not addressing the issues of robust business rules for managing successful communication. If a postal address has a mistake within it, very often the rest of the address can be used to sense check where it should be delivered to, combinations of other elements can make up for the erroneous element…for example the street address may be “avenue” rather than “road”, but the inclusion of the (correct) post-code may improve the likelihood of successful delivery to the intended recipient even if other parts of the address are incorrect. A homeowner who receives a letter they believe is incorrectly addressed may put it back in the mail with the suggested correction - particularly if it’s a common error in the address…”Road” not “Avenue”, and the carrier will attempt redelivery, however if an address is incorrectly recorded or incorrectly set up by the sender, non-delivery notices or “bounce backs” may occur, however the may just be delivered to someone else - totally unrelated and that unintended recipient is under no obligation to reject it, or contact anyone to advise them of the sender’s mistake. So business rules on address management and non delivery notices will ensure successful communication is achieved in the most efficient way. In the electricity mods which NGN’s mod was based on, the code defined exceptions to the use of communications which the original UNC mod doesn’t consider.

Solution Determine what can be communicated by and how that is agreed How consent to receive and send communication is established and maintained Determining whether communication has been achieved and setting out obligations to manage “Non-delivery” notices How UK Link manages changes to Appendix 5B

Recommended Steps The Proposer recommends that this modification should be:  Not subject to self-governance - we disagree that the original modification meets the criteria for Self Governance as we believe it could have a material impact on contractual relationships if important communication provisions are not managed robustly and therefore it could impact competition.  Should be sent to the existing 479 workgroup to develop the modification for 3 months.