1 BROOKHAVEN SCIENCE ASSOCIATES Systems for Accelerator Operations Safety Erik Johnson ASD Deputy Director and Interface Manager NSLS-II ASAC Meeting October.

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 Personnel Protection System (PPS) – Definition Interlock system, to protect personnel from Ionising Radiation (and other hazards) –(Note: does not include.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
1 BROOKHAVEN SCIENCE ASSOCIATES Review of May 29 Excursion Bob Casey.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
BROOKHAVEN SCIENCE ASSOCIATES 0 Top-Off Safety Yongjun Li ASAC Meeting October 22, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Beamline Conceptual Design Overview and Interface Management
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Installation Gregory Fries, Project Engineer 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
ALS-U Radiation Safety Systems
Report Technical Director Storage-Ring-Installation Completed
C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S
CBETA Technical Review
Software Specification and Configuration Management
Injector Performance Requirements Conventional Facilities Update
Personnel Safety Systems
Experimental Program and Endstations System (WBS ) J
LCLS Personnel Protection System and Beam Containment System
E. Michael Saleski PPS and BCS Systems Manager
LCLS Injector System Overview D. H
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
LCLS e- Beams System Overview
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Systems for Accelerator Operations Safety Erik Johnson ASD Deputy Director and Interface Manager NSLS-II ASAC Meeting October 22-23, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES What are SAOS ? Broadly speaking systems designed to keep bad things from happening to people or equipment; o only permit operation when predetermined conditions are met, o provide barrier function o Technical elements identified in WBS o Personnel Protection System o Equipment Protection System o Area Monitoring o Local Shielding o Elements not explicitly identified in WBS o Active interlock o Top off injection ASD + …. o Beam containment system

3 BROOKHAVEN SCIENCE ASSOCIATES People working on SAOS CAM for (talking about the work of others!) Andrew Ackerman, Rudy Alforque, Mike Buckley, Scott Buda, Bob Casey, Bob Dalesio, Lewis Doom, David Dudley, Asher Etkin, Ray Fliller, George Ganetis, Carmine Guarino, Richard Heese, Steve Jarazabkowski, PK Job, Erik Johnson, Henry Kahnhauser, Stephen Kramer, Jerry Malley, John McCaffre, Brian Mullany, Ewart Orr, Jonathan Reich, Paul Ribaudo, Jim Rose, Timur Shaftan, Sushil Sharma, Om Singh, Ferdinand Willeke PPS EPS Shielding Design reviews Integration with other systems Andrew Ackerman, Rudy Alforque, Mike Buckley, Scott Buda, Bob Casey, Bob Dalesio, Lewis Doom, David Dudley, Asher Etkin, Ray Fliller, George Ganetis, Carmine Guarino, Richard Heese, Steve Jarazabkowski, PK Job, Erik Johnson, Henry Kahnhauser, Stephen Kramer, Jerry Malley, John McCaffre, Brian Mullany, Ewart Orr, Jonathan Reich, Paul Ribaudo, Jim Rose, Timur Shaftan, Sushil Sharma, Om Singh, Ferdinand Willeke PPS EPS Shielding Design reviews Integration with other systems Andrew Ackerman, Rudy Alforque, Mike Buckley, Scott Buda, Bob Casey, Bob Dalesio, Lewis Doom, David Dudley, Asher Etkin, Ray Fliller, George Ganetis, Carmine Guarino, Richard Heese, Steve Jarazabkowski, PK Job, Erik Johnson, Henry Kahnhauser, Stephen Kramer, Jerry Malley, John McCaffre, Brian Mullany, Ewart Orr, Jonathan Reich, Paul Ribaudo, Jim Rose, Timur Shaftan, Sushil Sharma, Om Singh, Ferdinand Willeke PPS EPS Shielding Design reviews Integration with other systems Andrew Ackerman, Rudy Alforque, Mike Buckley, Scott Buda, Bob Casey, Bob Dalesio, Lewis Doom, David Dudley, Asher Etkin, Ray Fliller, George Ganetis, Carmine Guarino, Richard Heese, Steve Jarazabkowski, PK Job, Erik Johnson, Henry Kahnhauser, Stephen Kramer, Jerry Malley, John McCaffre, Brian Mullany, Ewart Orr, Jonathan Reich, Paul Ribaudo, Jim Rose, Timur Shaftan, Sushil Sharma, Om Singh, Ferdinand Willeke

4 BROOKHAVEN SCIENCE ASSOCIATES SAOS SharePoint site

5 BROOKHAVEN SCIENCE ASSOCIATES Personnel Protection Systems Design Goal Protect personnel from high radiation areas by preventing access controlling radiation producing devices or conditions Accomplished by integrated systems Accelerator PPS Linac (LPPS) Booster (BPPS) Storage Ring (SPPS) Experimental Beam Lines (EPPS) S. Buda, E. Orr

6 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II PPS Zones B L 1 PPS must allow: Linac operable with personnel in booster Booster operable with personnel in storage ring Storage ring cavity testing with personnel in other pentants Individual search of each pentant

7 BROOKHAVEN SCIENCE ASSOCIATES Design Features All interlock logic trees will have redundant and independent chains The system is fail safe for foreseeable failure modes (e.g., loss of power, open circuit, short to ground, and single component failure) Redundant circuits will not share cables and will be separated physically on circuit boards and terminal strips A rigorous configuration management program will be established to control unauthorized modifications to interlock system components including physical access control. All interlock wiring and components will be labeled and readily identifiable. Wires run in dedicated conduit or segregated in cable tray. Testing & certification of interlock systems will be performed by independent personnel. Design for enclosure search systems will include sequenced and timed inspection stations, warning lights, audible alarms, emergency shut down switches and mirrors where necessary.

8 BROOKHAVEN SCIENCE ASSOCIATES Schematic of system interactions EPPS Beamline EPS EPS mediates change in state of safety significant components HMI Panel Interfaces with RF and Power supply systems for main beam shut off Inputs from other systems provide go or no-go status. Systems include: Radiation monitors, beam current, linac pulse rate SPPS - Cell Front End EPS SPPS - MCCS Area monitor EESE Storage Ring FOE PPS monitors state of safety significant components Safety Shutter Valve Photon Shutter Details of Front end in Sushil Sharmas talk

9 BROOKHAVEN SCIENCE ASSOCIATES Technical Highlights Integration of area radiation monitors with the main ring system (SPPS) ~60 locations Main ring divided into 5 separate sections for modular concept eg each pentant has its own separate CPU Provides search and secure function for each pentant Main ring uses a distributed I/O architecture Interface to Light source Two Control System (LTCS) for archiving of system data Use of safety rated PLC ’ s to increase reliability and diagnostic capability

10 BROOKHAVEN SCIENCE ASSOCIATES Search patterns for the storage ring Note pentants 1,3,4 and 5 are identical, pentant 2 has two entrance labyrinths. The paths are similar, but with an extra leg for the extra entrance.

11 BROOKHAVEN SCIENCE ASSOCIATES Engineering Prototype Working PPS prototype including SPPS (pentant, front end components) EPPS (EESE) and EPS Confirm operation of systems together Aid in software development and operational assumptions Prototype saved after construction for training, troubleshooting and as a test bed for improvements Interface development with LT Control System

12 BROOKHAVEN SCIENCE ASSOCIATES Prototype SPPS Shutter proxy

13 BROOKHAVEN SCIENCE ASSOCIATES Human Interlock Interface (search box) Beam Imminent Beacon Search In Progress Beacon Search indicator Beam Disabled Area Secure Emergency Stop Search Button Beam Imminent Siren Single Pentant Siren Preliminary Design Ewart Orr, Engineer Functional Prototype

14 BROOKHAVEN SCIENCE ASSOCIATES Engineering Design Reviews Personnel Protection Systems SPPS and EESE design overview 24 September 2008 Evaluation of design features for SPPS including safety functions18 December 2008 Complete evaluation of SPPS, EESE evaluation and safety functions 20 February 2009 Injector PPS - Booster PPS and safety functions 23 April 2009 Injector PPS – Linac PPS and safety functions5 May 2009 SPPS Engineering Design Plan Review18 August 2009 Core BNL based review team – Andrew Ackerman, Mike Buckley, Asher Etkin, Steve Hoey, Henry Kahnhauser, Jonathan Reich (plus others when needed) Design review of NSLS Interlock systems (SIS-TECH Solutions) Develop and evaluate failure model for existing interlock system at NSLS Build toolkit for SIL approach to NSLS-II PPS design Gain valuable (and positive) experience with external analysis firm

15 BROOKHAVEN SCIENCE ASSOCIATES Project perspective for PPS Cost baseline 1. Accelerator - Design, construct, install, test, commission 2. Experimental - Design, prototype (construct/install costs by XFD) Schedule baseline for PPS FY 2009 build and test PPS engineering prototype FY 2010 develop production design and start manufacture FY 2011 installation & testing underway PPS Interlock Complete June 2012

16 BROOKHAVEN SCIENCE ASSOCIATES Selected specifications for area monitors Measure photon dose rate from 10 µRem/h to 1000 mRem/h Measure photons in the energy range from 80 KeV to several MeV Monitor short pulse radiation < 100 nS/pulse at 1 Hz repetition rate Provide alarm on integrated dose at predetermined set point * Provide alarm on dose rate at predetermined set point Provide local visual and audible indication of increased radiation levels above predetermined set points Provide self-monitoring of detector and processor function and actuation of relay for the following conditions: System check, Loss of power, Lack of signal, Background drift * Provide 3 sets of relay contacts for: High radiation alarm, system malfunction, warning alarm noting increased radiation levels

17 BROOKHAVEN SCIENCE ASSOCIATES Area monitor plan Fall 2009 – procure and install at NSLS several detectors for review of performance, reliability, and maintenance requirements for a period of 12 months Winter – prepare and issue area monitoring specifications and request for bid April 2011 – Award contract for radiation monitoring system December 2011 – Receive at least 30 units for inspection and test February 2012 – Linac area monitoring system operation June 2012 – Booster area monitoring system operation July 2012 – Receive balance of detectors November 2012 – Ring building area monitoring system operational

18 BROOKHAVEN SCIENCE ASSOCIATES Strategy for Supplementary Shielding Injection / extraction septa and beam dumps shielded for fast injection rate of 15 nC/s Probable high beam loss points (injection / extraction regions) shielded with additional supplementary shielding Beam loss at non-injection regions will be controlled by engineering solutions of BCS systems ( see Bob Casey talk ) Shadow shields inside the booster to protect occupiable regions from forward peaking tangential bremsstrahlung due to beam loss Shielding at the storage ring injection septum Shielding around beam pipe penetrations from the accelerator enclosures, including the ratchet wall collimator Bremsstrahlung stops at the dummy front ends with no beamlines

19 BROOKHAVEN SCIENCE ASSOCIATES Radiological Analysis SharePoint site P.K. Job

20 BROOKHAVEN SCIENCE ASSOCIATES Linac Shielding SLIT SHIELDING LOCAL SHILEDING 2 LOCAL SHIELDING 1 2 BEAM DUMPS SAFETY SHUTTER R. Alforque

21 BROOKHAVEN SCIENCE ASSOCIATES Supplemental Shielding SharePoint

22 BROOKHAVEN SCIENCE ASSOCIATES Critical Devices for the Radiation Enclosures Linac Electron Gun Klystron Power Supplies Booster Linac to Booster transport line Dipole Magnet Linac to booster transport line Safety Shutter Booster RF Power Supply Booster Dipole Magnet Power Supply Storage Ring Booster to SR transport line Dipole Magnet Booster to SR transport line Safety Shutter SR RF Power Supply SR Bending Magnet Power Supply First Optics Enclosure Redundant Safety Shutters Experimental Stations Redundant Monochromatic Shutters

23 BROOKHAVEN SCIENCE ASSOCIATES Issues and Conclusions Issues on the horizon Refine definition of interfaces with control system and control room Finalize interface requirements for Top-off and Beam containment systems as their designs mature Conclusions Interfaces between SAOS systems identified and/or specified (affordances included for ‘extras’) Focus on prototype system construction and testing in near term Move into production of PPS systems in FY10 for FY11 installation start VE choices and design evolution are pushing progress well ahead of baseline schedule and under budget Will have thoroughly characterized systems deployed for installation and commissioning