Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.

Slides:



Advertisements
Similar presentations
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Advertisements

FNAL Superconducting RF Program Sergei Nagaitsev.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
F Project X Overview Dave McGinnis October 12, 2007.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
July 25, 2007 Fermilab ILC School Americas Slide 1 ILC Test Facilities Sergei Nagaitsev Fermilab.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
ILC/SRF R&D Robert Kephart. 9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
F ILC Accelerator R&D and AAR&D at NML Sergei Nagaitsev FRA Visiting Committee Review April 20/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
SRF Infrastructure at Fermilab (and more) Rich Stanek Engineer’s Week February 15, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
WP5 Elliptical cavities
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
ILC Cavity & Cryomodule Overview
Industrialization Activities in the Americas
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab

Oct 2007 US-China Collaboration Slide 2 International Linear Collider The world-wide High Energy Physics consensus is that the next new international facility after LHC should be a 500 GeV/c CM e+e- Collider –upgradeable to 1 TeV/c In 2005 the Global Design Effort (GDE) was formed in to create a machine design –International effort (Americas, Europe, Asia) –Successfully completed a Reference Design Report and associated cost estimate in 2007 –Currently the GDE is working to create an Engineering Design by 2010

Oct 2007 US-China Collaboration Slide 3 Importance of China as a Major Partner The ILC scale requires global participation China’s High Energy Physics Program has been developing rapidly in recent years Explosive growth in Chinese Economy and Industrial Capability makes China a desirable partner for a challenging project like ILC Components will need to be mass produced in industry in all three regions (Americas, Asia, Europe) China could become a major player

Oct 2007 US-China Collaboration Slide 4 Why should China be interested? (1) The Physics Program is Excellent! SRF Technology has many potential applications SRF Linacs for HEP –International Linear Collider (electrons) –Proton Linacs for:  Intense Neutrino sources (Project X proposal at Fermilab)  Front-end of a Muon Collider SRF technology has many other applications –ERL’s for light sources (Materials & Medical science) –Proton Linacs for:  Spallation Neutron sources  Accelerator driven Sub-critical Reactors  Nuclear waste transmutation  Medical Isotope generation or Proton therapy –etc

Oct 2007 US-China Collaboration Slide 5 Why should China be interested? (2) China’s manufacturing based economy has been doing extremely well The next natural step in the evolution of the Chinese economy will be innovation based and will depend on development of new advanced technologies History shows that basic scientific research has been the key element in driving innovation –Trains next generations of scientists and engineers –Develops world class technological workers –Leads to a knowledge based economy

Oct 2007 US-China Collaboration Slide 6 The ILC and Fermilab Goals of Fermilab’s ILC R&D: –Establish credentials in ILC machine design –Develop proficiency in SRF technology –Become a trusted international partner ….with the overall goal of preparing FNAL as viable ILC host site As part of the GDE our goal is to help design the machine, estimate the cost, and gain international support. Fermilab ILC R&D activities: –ILC Machine Design –Development of SRF technology & infrastructure –Conventional Facility & Site Studies for a US ILC site –Industrialization & Cost Reduction –ILC Physics, Detector Design and R&D (not in this talk)

Oct 2007 US-China Collaboration Slide 7 The ILC employs two 250 GeV linacs arranged to produce 500 GeV/c collisions in the center of mass. High Power beams are required  choice of Superconducting RF technology ( best wall plug to beam efficiency) –HUGE: total length=23 km, 1680 Cryomodules, 14,560 SRF cavities, all operating at an average gradient of 31.5 MV/m) ~30 km SRF and the ILC

Oct 2007 US-China Collaboration Slide 8 Project X: Near term use for ILC SRF A FNAL stepping stone to ILC A plan is being developed for a 8 GeV SC Proton Linac to increase FNAL Main Injector beam power to > 2.3 MW –Long base line Neutrino Physics –Physics at the intensity frontier (e.g.   e conversion) –Modified version of Proton Driver Plan Based on 7 GeV of ~ ILC Linac (9 mA x 1 mS x 5 Hz) –Accelerates H minus ions –0.6 GeV Low Beta SC linac –0.6-8 GeV ILC style linac Stripping and accumulation in Recycler Beam accelerated to (up to) 120 GeV in MI –Also 8 GeV program 8

Oct 2007 US-China Collaboration Slide 9 Project X Layout GeV fast extraction spill 1.5 x protons/1.4 sec 2 MW 8 GeV H - Linac 9mA x 1 msec x 5 Hz 8 GeV extraction 1 second x 2.25 x protons/1.4 sec 200 kW Stripping Foil Recycler 3 linac pulses/fill Main Injector 1.4 sec cycle Single turn 8 GeV GeV ILC Style Linac 0.6 GeV Front End Linac

Oct 2007 US-China Collaboration Slide 10 Proton Beam Power 10

Oct 2007 US-China Collaboration Slide 11 ILC/Project X Cavities Cavities are made from pure Nb Sheet –cells deep drawn and electron beam welded Why Niobium? –Highest critical temperature (9.2K) & Critical field (Bc =1800 G) of all pure metals What limits cavity performance ? –Surface defects  quench (few micron size defects matter) –Particulates  field emission –Ultimately, Peak Magnetic field on SC AES Tesla-shape

Oct 2007 US-China Collaboration Slide 12 ILC SRF Goals Demonstrate the baseline ILC Main Linac technology –GDE S0: Cavity gradient of 35 MV/m; good yield –GDE S1: Cryomodules with average gradient > 31.5 MV/m –GDE S2: One or more ILC rf unit with ILC beam parameters Key issue is variability in cavity performance Develop FNAL expertise in SRF technology –Train FNAL staff: Command of the technology for ILC –R&D to improve ILC performance, reduce cost Collaborate with U.S. & International ILC partners Transfer SRF technology to industry Build FNAL SRF Infrastructure to support these activities These goals are closely aligned with a developing plan for a SC linac based intense Proton source (Project X)

Oct 2007 US-China Collaboration Slide 13 ILC Cryomodule Cryomodules are complex 8 or 9 Cavities, ultra clean surfaces Operate in 2K superfluid He Quad Focusing magnets Couplers feed RF energy to cavities Tuners adjust cavity resonant frequency to match klystron Cryomodules are expensive Single most expensive component of the ILC FNAL leads an international team working to improve the TESLA CM design for ILC (DESY, INFN, KEK, CERN, SLAC, India, etc) Must industrialize cavities, components, and maybe CM assembly Developing the extensive infrastructure to build and test CM’s Project X would need 40 ILC-like Cryomodules TTF Cryomodule

Oct 2007 US-China Collaboration Slide 14 ML basic building block ILC RF Unit: 3 CM, klystron, modulator, LLRF Baseline design now has 2 CM with 9 cavities, 1 CM with 8 cavities + quad

Oct 2007 US-China Collaboration Slide 15 Surface Processing Cavity Fabrication Vertical Testing He Vessel, couplers, tuner HPR or reprocess Horizontal Testing Cold String Assembly Pass! Fail! Cavity/CM process and Testing Plan… Develop in labs then transfer technology to industry

Oct 2007 US-China Collaboration Slide 16 SCRF Infrastructure This process requires extensive infrastructure Bare cavities –Fabrication facilities (Electron beam welder, QC, etc) –Surface treatment facilities BCP & Electro-polish facilities (EP) –Ultra clean H 2 0 & High Pressure Rinse systems –Vertical Test facilities ( Cryogenics + low power RF) Cavity Dressing Facilities ( cryostat, tuner, coupler) –Class 10/100 clean room –Horizontal Test System (cryogenics and pulsed RF power) Cryomodule Assembly Facilities –Large class 10/100 clean rooms, Large fixtures Cryo-module test facilities –Cryogenics, pulsed RF power, LLRF, controls, shielding, etc. –Beam tests  electron source (RF unit test facilities) In 2005 FNAL began building this infrastructure

Oct 2007 US-China Collaboration Slide 17 FNAL/U.S. SRF infrastructure Cavity Surface Processing (electro polish) –Cornell processing facility –Jlab processing facility –Joint FNAL/ANL facility at ANL Vertical Test Stand: (IB1) –Tests “bare” cavities Horizontal test stand (MDB) Cryomodule Assembly areas (MP9 + IB1) –1 st ILC like cryomodule (being assembled) –3.9 GHz cryomodule under assembly for DESY RF Unit Test Facility (ILCTA_NML) –ILC-like beam to test full RF units –Move FNAL A0 Photo-injector –Add Capture Cavity II

Oct 2007 US-China Collaboration Slide 18 Cavity Fabrication By Industry Cavity Dressing & Horizontal Fermilab Surface Cornell Surface Jlab Surface ANL/FNAL Vertical Cornell Vertical Jlab Vertical FNAL Exists Developing U.S. Cavity Processing & Test ILC R&D goals require new large processing facility ~ 300/yr ~10/yr~50/yr~40/yr

Oct 2007 US-China Collaboration Slide 19 New ANL-FNAL Processing Facility New Clean Rooms New Chemistry Rooms & EP 1 st EP Aug 07 Single cell Chemistry, Clean rooms, BCP,HPR & state-of-the-art Operational ~ Dec 07 ~ 50 EP cycles/yr

Oct 2007 US-China Collaboration Slide 20 New Vertical FNAL Recently commissioned (IB1) –Existing 1.8 K Cryo plant –RF system in collaboration with Jlab –Capable of testing ~50 Cavities/yr –Evolutionary upgrades:  Thermometry for 9-cells, 2 cavities at a time, 2 top plates, Cryo upgrades  Plan for two additional VTS cryostats –Ultimate capacity ~ 264 tests/yr VTS Cryostat:IB1 New RF & Control Room Plan for 2 more VTS pits Nine-cell Tesla-style cavity

Oct 2007 US-China Collaboration Slide 21 Cavity Process & VTS Results ACCEL (Europe) AES (U.S.) ILC Goal ACCEL= experienced, AES is new vendor, cavities are limited by Quench vs. FE

Oct 2007 US-China Collaboration Slide 22 Horizontal Test System After successful vertical test: –Cavity welded inside He vessel –Cavity opened to install main coupler –Tuner added Horizontal Test: –test cavity with pulsed RF power before it is buried in CM –Also serves as high power R&D Test Bed “Dressing” 1 st 1.3 GHz Cavity in HTS Cryostat HTS Cryostat Installed at MDB

Oct 2007 US-China Collaboration Slide 23 MDB Infrastructure RF Power for HTS Cryogenics transfer lines in MDB Large Vacuum Pump for 2K 300 KW RF Power for HTS Capture Cavity-II

Oct 2007 US-China Collaboration Slide 24 Cryomodule Assembly Facility Goal: Assemble R&D Cryomodules Where: MP9 and ICB buildings –MP9: 2500 ft 2 clean room, Class 10/100 –Cavity dressing and string assembly –ICB: final cryomodule assembly Infrastructure: –Clean Rooms, Assembly Fixtures –Clean Vacuum, gas, water & Leak Check DESY Cryomodule “kit” being assembled now String Assembly MP9 Clean Room Cavity string for 1 st CM ICB clean: Final Assembly fixtures installed

Oct 2007 US-China Collaboration Slide 25 Overall Plan: Test ILC RF units 3 CM, Klystron, Modulator, LLRF Move A0 Injector to provide ILC like beam New bldg: diagnostic, AARD, new cryo plant ILC Twin tunnel design to allow 2 nd RF unit and to study tunnel layout and maintenance issues Bunch Compressor ILC RF unit Diagnostics Gun CC I,II Laser 3 rd har Test Area ~ 22 M 72 M Existing Building New Building New ILC like tunnel 2 nd ILC RF unit Test Areas new 300 W cryo plant RF Equipment RF Unit Test Facility (ILCTA_NM)

Oct 2007 US-China Collaboration Slide 26 Recent Picture of NML Facility

Oct 2007 US-China Collaboration Slide 27 FNAL-China Collaboration Long history of FNAL-China Collaboration –1979: ~ 20 Chinese accelerator physicists visited FNAL to learn about building Proton Synchrotrons –US-China Joint Committee on HEP established –28 th annual meeting at FNAL Nov 19-20, 2007 Experimental Collaborations –Early Fixed target experiments at FNAL –Tevatron: D0 experiment ( on-going) –CMS: Collaboration to build Muon Chambers –BES III: T Liu consults on trigger electronics Collaboration on ILC & Project X seems natural

Oct 2007 US-China Collaboration Slide 28 Many Shared Interests China SRF –Cavity R&D for ILC –CSNS ( upgrade =SRF LINAC) –Cryomodules for XFEL –BEPCII spare SRF cavity Detector R&D –Test Beam –BES III, D0,CMS,ATLAS –China’s strength in crystals Neutrino Physics –Daya Bay –Future Experiments? Fermilab SRF –Cavity R&D for ILC –SRF LINAC for Project X –ILC/Project XCryomodules –3.9 GHz for FLASH/XFEL and ILC crab cavities Detector R&D –Test Beam –CDF,D0,CMS –Crystal Calorimetry for ILC Neutrino Physics –MINOS, NOvA… –Future Experiments with Project X or DUSEL ?

Oct 2007 US-China Collaboration Slide 29 Developing Collaborations Developing specific plan for ILC/Project X collaborative work –Cavity Development  Cavity development, Nb from China  Cavity testing, SRF surface physics –Development of Chinese and FNAL SRF infrastructure –Development of accelerator equipment  Machine design and simulation  Cryomodule Development  RF: Modulators, klystrons, RF distribution  Conventional Magnets for DR, instrumentation, controls, etc. –Detector R&D –Personnel exchange FNAL- China Developing collaborations… –Umbrella MOU with Peking University signed in Oct 07 –Umbrella MOU with IHEP to be signed mid-Nov –Encourage other institutions to get involved

Oct 2007 US-China Collaboration Slide 30 Conclusions Growing FNAL collaborations with Asia: –Long history of collaboration with Japan –New collaborations with Indian institutions –China can be an important new partner for both Project X and ILC We are encouraged by our discussions –Developing the details Thanks for inviting us to this meeting to understand your thinking on ILC… and to tell you about our plans for ILC R&D and Project X