LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.

Slides:



Advertisements
Similar presentations
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Advertisements

LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
/18 Cryogenic thermometry for refrigerant distribution system of JT-60SA Kyohei NATSUME, Haruyuki MURAKAMI, Kaname KIZU, Kiyoshi YOSHIDA, Yoshihiko KOIDE.
LARP MQXF Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department January 31, 2014.
Review of the Tests of Superconducting Magnets in SM18 14 th January 2005 Review of the Cryogenic Infrastructure in SM18 Bruno Vullierme ACR-MT.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The integration of 420 m detectors into the LHC
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
10/3/05 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer Roger Rabehl Fermilab.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Overview of the ESS Linac Cryogenic Distribution System
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Final Design Cryogenic and mechanical configurations
Magnet cryogenic system update.
Hervé Allain, R. van Weelderen (CERN)
Hervé Allain, R. van Weelderen (CERN)
HL-LHC IT STRING and Series test of SC link
Hervé Allain, R. van Weelderen (CERN)
HFM Test Station Main Cryostat
Magnet Test Stands at Fermilab
LARP Vertical Test Facility
Hervé Allain, R. van Weelderen (CERN)
Cryostat design Mechanical design: Thermal screens: Specifications:
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
ILC Experimental Hall Cryogenics An Overview
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Cryogenics – The Basics
Cryogenics – The Basics
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department

Present Cryogenic Capabilities Horizontal test stand providing 1.9 K subcooled liquid bath.

Present Cryogenic Capabilities Feed Box with a Two- Bath System – Saturated 4.5 K liquid for vapor-cooled power leads – Subcooled 1.9 K liquid for magnet testing – Separated by a lambda plate

Present Cryogenic Capabilities Feed Box Connections – Heat exchanger (for present LHC IR quadrupoles, inner line is pumped 1.9 K two-phase and annular area is subcooled 1.9 K liquid) – Magnet He supply (two for instrumentation, one for power bus, one capped) – Beam pipe for warm bore/magnetic measurements – Cool-down return – Thermal shield LN 2 supply and return

Present Cryogenic Capabilities Return End Connections – Heat exchanger pipe termination and a liquid collection pot. – Cool-down return.

Present Cryogenic Capabilities Subatmospheric operations – Two Kinney pump skids located in IB1 (KMBD 3203 blower/KLRC 950 liquid ring pump; KMBD 2002 blower, KLRC 525 liquid ring pump) provide combined capacity of 5 g/s at 15 Torr (assuming 2 Torr pressure drop from 17 Torr/1.9 K). – Dedicated to the LHC quadrupole horizontal test stand. – The same pumps used to test the present LHC IR quadrupoles.

Present Cryogenic Capabilities Subatmospheric operations – Feed Box includes a single-layer J-T heat exchanger to minimize flashing as 4.5 K saturated liquid is supplied to the 1.9 K heat exchanger

Present Cryogenic Capabilities 1.9 K heat exchanger for present LHC IR quads – Saturated 1.9 K liquid in corrugated inner line, which also served as the pumping line on the test stand. – Subcooled 1.9 K liquid in outer annular volume, connected to magnet volume through cross-over pipes in the cryostats. D. Ramos Duarte, CERN (10/22/13)

Present Cryogenic Capabilities 1.9 K heat exchanger for LQX and MQX – Saturated 1.9 K liquid in HX pipe placed in cold mass cooling hole(s). – Pumping line is external to the cold mass. – Connection between HX pipe and pumping line must be made in the cryostat. D. Ramos Duarte, CERN (10/22/13) H. Allain, R. van Weelderen, CERN (11/28/12)

Present Cryogenic Capabilities With proper cryostat provisions (pumping line with cross-overs, cool-down return, thermal shield), the cryogenic process of LQX and MQX testing will be similar to the testing of the present LHC IR quads. Lead flows To compressor suction GN 2 vent Pumps LHe/GHe supply LN 2 supply Fill valves J-T HX Cool-down/ warm-up return Reliefs, quench recovery J-T valve Return End Cryostated cold mass with external pumping line Interconnect Feed Box 1.9 K saturated liquid 1.9 K subcooled liquid 4.5 K saturated liquid

Present Cryogenic Capabilities Cryogenic controls will use the standard IB1 process control architecture – Industrial PLC for process control – Industrial HMI (iFix from GE-Fanuc) for operator displays, historical data collection, and historical data trend plotting

Required Cryogenic Capability Upgrades Quench recovery system – Motivation is to recover helium gas generated by high-energy magnet quenches rather than venting to atmosphere, as was done for previous LHC IR quadrupole testing. – In 2012, a 4,000 ft 3 helium gas tank was reconfigured to also operate as a quench tank. – In service since June 2012 for VMTF, saving ~$1.2k of helium per quench. – Need to extend existing piping and tie in to the test stand and to the quench header. New Existing Stand 4

Required Cryogenic Capability Upgrades Controlled cool- down/warm-up – Present LHC IR quadrupoles were tested with unrestricted cool-down and warm-up. – Operational experience in providing controlled cool- down/warm-up of magnets in other test stands. – Engineering assessment required to determine optimum implementation of automatic temperature control. (Automatic) (Manual)

Required Cryogenic Capability Upgrades Miscellaneous – Refurbishment of vacuum (pump-down and insulating vacuum) systems – Re-sizing of relief devices and relief discharge header – Valve and instrument upgrades

Present Cryogenic Capabilities LQX quadrupole testing figures of merit – ~30 hour cool-down from 300 K to 4.5 K – 6 hour pump-down from 4.5 K to 1.9 K – 3 hour quench recovery

Present capabilities Feed Box Removable Insert – Includes lambda plate, LN 2 -cooled shield, baffles, current leads – Three 15 kA vapor-cooled current leads allow individual powering of single cold masses or series powering of both cold masses in the cryostat

Required Cryogenic Capability Upgrades Feed and return adapter boxes/piping spools