Doc.: IEEE 802.11-11/1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot September ‘11 Date: 06 -November-2011 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
Advertisements

Doc.: IEEE /863r0 Submission June WG Slide 1 Liaison presentation to SC6 regarding IEEE m(b) Date: Authors:
Doc.: IEEE /0721r0 Submission July 2012 Bruce Kraemer, MarvellSlide 1 WG11 Snapshot July 2012 Date: 16 -July-2012 Authors:
Doc.: IEEE /0224r0 Submission March 2011 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot March ‘11 Date: 13 -March-2011 Authors:
Doc.: IEEE /1444r4 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot July ‘09 Date: Authors:
Doc.: IEEE /1596r0 Submission January 2012 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot January ‘12 Date: 15 -January-2012 Authors:
Doc.: IEEE /0705r1 Submission July 2010 Bruce Kraemer (Marvell)Slide Revision extension under IEEE-SA Operations Manual subclause
Doc.: IEEE /0463r3 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /1096r0 Submission November 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot November ‘09 Date: Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report for Date Submitted: July 21, 2011 Contributed to IEEE.
Doc.: IEEE /0182r1 Submission March 2012 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot March 2012 Date: 11 -March-2012 Authors:
Doc.: IEEE /0932r1 Submission September 2013 WG11 Opening Report Snapshots September 2013 Date: 15 – September Authors: Bruce Kraemer, MarvellSlide.
Doc.: IEEE /0463r2 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /1596r2 Submission January 2012 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot January ‘12 Date: 15 -January-2012 Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0259r0 Submission March 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot March ‘09 Date: Authors:
July 2016 doc.: IEEE July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2011 Closing Plenary Motions
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company
WG11 Snapshot September ‘11
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
WG11 Opening Report Snapshots September 2013
WG11 Snapshot March ‘12 Date: 09 -March-2012 Authors: Name Company
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
Revision Process Summary
WG11 Snapshot September 2012 Date: 11 – November Authors: Name
WG11 Snapshot March ‘10 Date: Authors: Name Company Address
WG11 Snapshot July 2012 Date: 16 -July-2012 Authors: Name Company
Working Group Opening Report May 2014
WG11 Snapshot May ‘10 Date: Authors: Name Company Address
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
June 2010 doc.: IEEE /0705r0 November 2010
WG11 Snapshot July ‘11 Date: 18 -July-2011 Authors: Name Company
WG11 Snapshot September ‘10
January 2013 doc.: IEEE < > January 2013
WG11 Snapshot March ‘10 Date: Authors: Name Company Address
July 2016 doc.: IEEE July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2013 doc.: IEEE < > July 2013
July 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
January 2011 Closing Plenary Motions
WG11 Snapshot January ‘11 Date: 16 -January-2011 Authors: Name Company
Mar 2010 Closing Plenary Motions
WG11 Snapshot May ‘11 Date: 08 -May-2011 Authors: Name Company Address
WG11 Snapshot November ‘10 Date: 2010-Nov-07 Authors: Name Company
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
Mar 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
Mar 2010 Closing Plenary Motions
Mar 2010 Closing Plenary Motions
July 2010 Closing Plenary Motions
WG11 Snapshot November ‘10 Date: 08 -November-2010 Authors: Name
IEEE TGmb Sept 2011 Agenda Date: Authors:
WG11 Snapshot May ‘10 Date: Authors: Name Company Address
June 2010 doc.: IEEE /0705r0 December 2010
July 2011 Closing Plenary Motions
WG11 Snapshot July ‘10 Date: Authors: Name Company Address
Nov 2011 Closing Plenary Motions
WG11 Snapshot May 08 Date: Authors: Name Company Address
WG11 Snapshot January ‘10 Date: Authors: Name Company
WG11 Snapshot September 2012 Date: 11 – November Authors: Name
WG11 Snapshot January ‘09 Date: Authors: Name Company
September 2012 doc.: IEEE < > September 2012
September 2008 doc.: IEEE /1003r0 Sep 2010
Presentation transcript:

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot September ‘11 Date: 06 -November-2011 Authors:

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 2 PAR Expiration/Renewal Schedule ProjectPAR Expiration Date MB31-DEC-2011 S Revision31-DEC-2012 AA31-DEC-2012 AC31-DEC-2012 AD31-DEC-2012 AE31-DEC-2013 AF31-DEC-2013 AH31-DEC-2014 AI31-DEC

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 3

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 4 WG11 Task & Study Group Officers – November 2011 CatGroupChairVice ChairTechnical Editor Secretary WG WG11Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG MbDorothy StanleyMichael MontemurroAdrian StephensJon Rosdahl TG SDee DenteneerGuido HiertzKazuyuki SakodaGuenael Strutt TG AAGraham SmithAlex Ashley Ganesh Venkatesan TG ACOsama Aboul-MagdMenzo Wentink, Joonsuk Kim Robert StaceyDavid Yang TG ADEldad PerahiaChris Hansen, James YeeCarlos Cordeiro-OPEN- TG AEMichael MontemurroHenry PtasinskiMatthew Fischer TG AFRichard KennedyPeter Ecclesine Zhou Lan TG AHDave HalaszYongho SeokMinyoung Park Joseph TEO Chee Ming TG AIHiroshi ManoMarc EmmelmannTom SiepHitoshi Morioka SC WNGClint Chaplin SC ARCDave BagbyMark Hamilton SC JTC1Andrew Myles SC REGRichard Kennedy SC SGBruce Kraemer NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 5 WG11 Task & Study Group Officers – Nov 2011 adj CatGroupChairVice ChairTechnical Editor Secretary WG WG11Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG MbDorothy StanleyMichael MontemurroAdrian StephensJon Rosdahl TG SDee DenteneerGuido HiertzKazuyuki SakodaGuenael Strutt TG AAGraham SmithAlex Ashley TG ACOsama Aboul-MagdMenzo Wentink, Joonsuk Kim Robert StaceyDavid Yang TG ADEldad PerahiaChris Hansen, James YeeCarlos Cordeiro-OPEN- TG AEMichael MontemurroHenry PtasinskiMatthew Fischer TG AFRichard KennedyPeter Ecclesine Zhou Lan TG AHDave HalaszYongho SeokMinyoung Park Joseph TEO Chee Ming TG AIHiroshi ManoMarc EmmelmannTom SiepHitoshi Morioka SC WNGClint Chaplin SC ARCDave BagbyMark Hamilton SC JTC1Andrew Myles SC REGRichard Kennedy SC SGBruce Kraemer NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Gray text indicates officer is missing from this meeting

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 6 WG11 Task & Study Group Officers – Nov 2011 sub CatGroupChairVice ChairTechnical Editor Secretary WG WG11Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG MbDorothy StanleyMichael MontemurroAdrian StephensJon Rosdahl TG SDonald EastlakeGuido HiertzKazuyuki SakodaGuenael Strutt TG AAGraham SmithAlex Ashley TG ACOsama Aboul-MagdMenzo Wentink, Joonsuk Kim Robert StaceyDavid Yang TG ADEldad PerahiaChris Hansen, James YeeCarlos Cordeiro-OPEN- TG AEMichael MontemurroHenry PtasinskiMatthew Fischer TG AFRichard KennedyPeter Ecclesine Zhou Lan TG AHDave HalaszYongho SeokMinyoung Park Joseph Teo Chee Ming TG AIHiroshi ManoMarc EmmelmannTom SiepHitoshi Morioka SC WNGClint Chaplin SC ARCMark Hamilton SC JTC1Andrew Myles SC REGRichard Kennedy SC SGBruce Kraemer NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Red indicates substitute officer for this meeting

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 7

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 8 Current Membership Status Data as of Definitions: Aspirant: a member who has attended 1 qualifying meeting Potential Voter: a member who has attended 2 qualifying meetings and will become a voter at the start of the next plenary they attend November StatusNumber Aspirant115 Potential Voter60 Voter298

doc.: IEEE /1356r1 SubmissionSlide 9 IEEE Standards Pipeline PHY Sponsor Ballot MAC Study groups k RRM r Fast Roam (’99) 2.4GHz Published Standard g 54 Mbps 2.4GHz e QoS i Security f Inter AP h DFS & TPC V Network Management u WIEN Y Contention Based Protocol WG Letter Ballot aa Video Transport ac VHT 5GHz ad VHT 60GHz TG without Approved draft Discussion Topics Published Amendment n High Throughput (>100 Mbps) W Management Frame Security z TDLS p WAVE af TVWS Smart Grid ai FILS ah mb Revision WNG j JP bands a 54 Mbps 5GHz b 11Mbps 2.4 GHz d November 2011 Slide s Mesh ae QoS Mgt Frames Bruce Kraemer (Marvell)

doc.: IEEE /1356r1 SubmissionSlide 10 IEEE Revisions k RRM r Fast Roam a 54 Mbps 5GHz b 11 Mbps 2.4GHz d Intl roaming V Network Management s Mesh u WIEN Y Contention Based Protocol n High Throughput (>100 Mbps) W Management Frame Security z TDLS p WAVE PHY MAC aa Video Transport ae QoS Mgt Frames ah <1GHz ac Very High Throughput 5GHz ai FILS ad Very High Throughput 60GHz af TV Whitespace g 54 Mbps 2.4GHz e QoS i Security h DFS & TPC j JP bands f Inter AP f Inter AP November 2011 Bruce Kraemer (Marvell)Slide 10

doc.: IEEE /1356r1 SubmissionBruce Kraemer (Marvell)Slide 11 WG11 Editor Abstract / Agenda – Nov 2011 Roll Call / Contacts / Reflector Go round table and get brief status report ANA Status / Process / What is administered Numbering Alignment process / Spreadsheet Amendment Ordering / Draft Snapshots Style Guide for Editor succession REVmc Editor backup practices

doc.: IEEE /1356r1 Submission WNG SC – November 2011 Review of objectives Flexibility on Channel Access Allocations ( wng Flexibility on Channel Access Allocations.pptx) – Antonio de la Oliva s Issues with Adhoc Mode in Mesh Networking ( wng s Issues with Adhoc Mode in Mesh Networking.ppt) – Romana Challans Update to Improving the Case for Wireless LAN Transmit Power Control - Including to better service Mobile Telephones? () – Lawrence Zuckerman The better spectrum utilization for the future WLAN standardization ( wng-the-better-spectrum- utilization-for-the-future-wlan-standardization.pptx) - Yasuhiko Inoue Discovery of ESS Services () - Stephen McCann

doc.: IEEE /1356r1 Submission ARC – November 2011 Administration –Attendance –Approve Agenda –Policies 802 Overview & Architecture ballot –Ballot status update –Discussion and Comments Future sessions / SC activities Nov 2011 Mark Hamilton, Polycom, Inc.Slide 13

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 14 TGmb - November 2011 Recirculation Sponsor Ballot on Draft 11.0 closed 22 October 2011 –Pool 186, 147 affirmative – 94%, 9 Disapprove – 5%, 8 Abstain – 5% (prior ballot was 142/13/9) –92 comments (prior ballot was 257) Recirculation ballot on D12.0 underway This meeting –Request EC Conditional Approval to proceed to RevCom –Review Timeline –Confirm Interpretation Request process changes and next TG plans Agenda in

doc.: IEEE /1356r1 Submission November 2011 Slide 15 IEEE s Mesh Networking On Saturday September 10, the Standards Board did approve publication of s Thanks to all members who made this possible Publication is expected mid September TGs has no meeting slots evermore Award target is November Atlanta Bruce Kraemer (Marvell)

doc.: IEEE /1356r1 Submission 2011 Oct IEEE TGaa – Atlanta, November 2011 Goals for the Meeting: –Review and Approve the Okinawa and Teleconferences meeting minutes –Resolution of all Initial Sponsor Ballot comments Prepare for second Sponsor Ballot –Joint meeting with 801.Qat –TIME line of task group –Plan for Jan & Teleconferences Bruce Kraemer (Marvell)Slide 16

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 17 IEEE ac – November 2011 Focus is on complete the resolution of the LB 178 comments. Prepare draft D2.0 and proceed to WG LB. Held an Ad Hoc meeting in San Jose, California, November 2-4. –Progress was made on comment resolution. Agenda in document r0

doc.: IEEE /1356r1 Submission TGad – Meeting Goals Finish comment resolution on D5.0 Conditional approval for Sponsor Ballot Proposal for working relationship with CWPAN (Wed 16:00-18:00)

doc.: IEEE /1356r1 Submission Month Year John Doe, Some CompanySlide 19 TGae November 2012 Summary Status: Completed initial SB Comment Resolution: –Received 17 comments –96 % approval Objectives: Comment Resolution on SB recirculation. Approve Sponsor Ballot recirculation. Revise plan of record.

doc.: IEEE /1356r1 Submission November 2011 Slide 20 TGaf – Meeting Goals November 2011 Approve meeting and teleconference minutes Review the results of LB171 Approve the LB171 comment spreadsheet in 11-11/277r20 Approve speculative draft D1.04 Review the progress since September Complete comment resolution Review regulatory landscape Begin the process of incorporating the TGac PHY Plan for January meeting and teleconferences

doc.: IEEE /1356r1 Submission IEEE ah November Snapshot Primary focus –Continue work on the specification framework document based on initial document from September. Continue work on, –Requirements & eval. and channel model document Timeline review & Teleconference schedule November 2011 David Halasz, OakTree WirelessSlide 21

doc.: IEEE /1356r1 Submission IEEE FILS TGai – Atlanta, November 2011 Goals for the Meeting: –Joint Adhoc with REG-SC –Review and Approve the Okinawa and Teleconference meeting minutes –Presentation of submissions Submission of Initial technical contribution General submission –TIME line of task group –Plan for Jan & Teleconference Sep 2011 Bruce Kraemer (Marvell)Slide 22

doc.: IEEE /1356r1 Submission Sept 2011 Bruce Kraemer (Marvell)Slide 23 IEEE JTC1 ad hoc – November 2011 The agenda items that will be addressed this week are: –Select IEEE 802 delegation for next SC6 meeting February 2012 in China – same week as WFA meeting –Review IEEE WG liaisons to SC6 Latest liaisons of Sponsor Ballot drafts –Review status of WAPI in SC6 (802.11i replacement) CRM meetings on WAPI NP comments –Review status of 802.1X/AE and security replacements Not much new in ISO/IEC –Review status of N-UHT (802.11ac replacement) Not much new in ISO/IEC; but it is being standardised in China –Review plan for ISO/IEC 8802 standards Goal is a liaison to SC6 from IEEE 802

doc.: IEEE /1356r1 Submission Regulatory Standing Committee Meeting Goals November 2011 The regulatory summaries Regulatory issues status –FCC open issues –EN revision update –FCC 5 GHz rules changes update –TVWS in other regulatory domains Critical issues actions –Additional challenge to the EN revision November 2011 Slide 24

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 25 Smart Grid – November 2011 NIST Smart Grid PAP#2 Update NIST Framework 2.0 document comments

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 26

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 27 YearInter meeting Period Ballots Completed WGSponsor 2010July - Sept Sept - Nov /2011Nov - Jan Jan - Mar Mar - May May - July July - Sept Sept - Nov13 Recent Ballot History

doc.: IEEE /1356r1 Submission Ballot #185 was the fourth 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ad D5.0 be forwarded to Sponsor Ballot?". Results are: Ballot Opening Date: Wednesday September 21, :59 ET Ballot Closing Date: Thursday October 06, :59 ET RESPONSES: 278 eligible people are in this ballot group. 196 affirmative votes 13 negative votes 19 abstention votes === 228 votes received = 82.0% valid returns = 8.3% valid abstentions APPROVAL RATE: 196 affirmative votes = 93.8 % affirmative 13 total negative votes = 6.2 % negative Motion passes. There were 41 comments received. November 2011 Bruce Kraemer (Marvell)Slide 28

doc.: IEEE /1356r1 Submission The initial IEEE P802.11ae (Prioritization of Management Frames) 30 day Sponsor Ballot asked the question “Should P802.11ae Draft 5.0 be forwarded to RevCom?” RESULTS: Ballot Opening Date: Wednesday August 10, :59 ET Ballot Closing Date: Friday September 09, :59 ET RESPONSES: 145 eligible people are in this ballot group. 110 affirmative votes 6 negative votes with comments 0 negative vote without comments 7 abstention votes ======= 123 votes received = 84.8 % valid returns = 5.2% valid abstentions APPROVAL RATE: 110 affirmative votes = 94.8 % Approve 6 total negative votes = 5.2 % Do Not Approve The motion passes. There were 212 comments received November 2011 Bruce Kraemer (Marvell)Slide 29

doc.: IEEE /1356r1 Submission The initial IEEE P802.11aa (Robust Audio/Video Streams) 30 day Sponsor Ballot asked the question “Should P802.11aa Draft 6.0 be forwarded to RevCom?” Results for this Sponsor Ballot follow: Ballot Opening Date: Wednesday September 12, :59 ET Ballot Closing Date: Wednesday October 12, :59 ET RESPONSES: 156 eligible people are in this ballot group. 106 affirmative votes 8 negative votes with comments 0 negative votes without comments 9 abstention votes ======= 123 votes received = 78.8 % valid returns = 7.3% valid abstentions APPROVAL RATE: 106 affirmative votes = 93.0 % affirmative 8 total negative votes = 7.0 % negative Motion Passes. There were 147 comments received November 2011 Bruce Kraemer (Marvell)Slide 30

doc.: IEEE /1356r1 Submission The IEEE P802.11REVmb ( roll-up revision) 15 day 5 th recirculation Sponsor Ballot asked the question “Should P802.11REVmb Draft 11.0 be forwarded to RevCom?” Results : Ballot Opening Date: Friday October 07, :59 ET Ballot Closing Date: Saturday October 22, :59 ET RESPONSES: 186 eligible people are in this ballot group. 147 affirmative votes 9 negative votes with comments 0 negative votes without comments 8 abstention votes ======= 164 votes received = 88.2 % valid returns = 4.9% valid abstentions APPROVAL RATE: 147 affirmative votes = 94.2 % affirmative 9 total negative votes = 5.8 % negative The motion passes. There were 92 comments received November 2011 Bruce Kraemer (Marvell)Slide 31

doc.: IEEE /1356r1 Submission The IEEE P802.11ae (QoS for Management Frames) 15 day 1 st recirculation Sponsor Ballot asked the question “Should P802.11ae Draft 6.0 be forwarded to RevCom?” Results for this Sponsor Ballot follow: Ballot Opening Date: Friday October 14, :59 ET Ballot Closing Date: Saturday October 29, :59 ET RESPONSES: 145 eligible people are in this ballot group. 115 affirmative votes 5 negative votes with comments 0 negative vote without comments 7 abstention votes ======= 127 votes received = 87.6 % valid returns = 5.5% valid abstentions APPROVAL RATE: 115 affirmative votes = 95.8 % affirmative 5 total negative votes = 4.2 % negative The motion passes. There were 17 comments received November 2011 Bruce Kraemer (Marvell)Slide 32

doc.: IEEE /1356r1 Submission The IEEE P802.11REVmb ( roll-up revision) 10 day r6 Sponsor Ballot asked the question “Should P Draft 12.0 be forwarded to RevCom?” Ballot Opening Date: Monday November 03, :59 ET Ballot Closing Date: Sunday November 13, :59 ET RESULTS: 186 eligible people are in this ballot group. November 2011 Bruce Kraemer (Marvell)Slide 33

doc.: IEEE /1356r1 Submission November 2011 Bruce Kraemer (Marvell)Slide 34