Introduction Peak Hosted Advanced Applications. 2 What is this project all about? Enhanced TOP situational awareness and ability to perform real-time.

Slides:



Advertisements
Similar presentations
Step 4: Strategy Implementation. Learning Objectives Understand the elements and benefits of developing an action plan Value the involvement of internal.
Advertisements

RC Strategy Implementation. What we are asking for… Authorization to hire Black and Veatch to develop and issue the two RFPs associated with the RC Strategic.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
January TSS J. Gronquist, S. Kincic
Confidential & Proprietary to Cooper Compliance Corporation Revised September 8, 2014 AUDiT-READY TM.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
1 Vendor Evaluation: Selecting for Success Dana McCormick Wells Fargo Home Mortgage Delivery Services Baltimore PCC Education Seminar April 27, 2007.
PMO Services RFP Overview Patty Fontneau ED and CEO.
Campus Catering Don Green, C.P.M. Director, Contracts and Procurement
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
The Indistar Network MOVING FORWARD. Members, Costs, Services  Members: State Education Agencies  Cost: $10,000 per year, unlimited districts, schools.
Girls Program Learn to Play Travel Program House Program.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
PHAAUG – Peak Reliability
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Documenting the Participation of Fishing Vessel Crew Members in Alaska’s Commercial Fisheries Documenting the Participation of Fishing Vessel Crew Members.
Roles and Responsibilities
Software Engineering Project Assignment 7 Group 3 IT-201.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
If you are looking for a solution to your training administration nightmares, look no further! For a once off fee (starting at the salary for a reasonably.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
QUALITY MANAGEMENT STATEMENT
Voting System Grant Program. Help America Vote Act  Provides funding to help accomplish the various requirements of the Act.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
IRBNet The implementation of IRBNet will assist the UTEP community to comply with UT System Policy UTS 108 on Affiliation Agreements. IRBNet will provide.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
QuickService Department of Education and Training Schools July 2015.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Presentation to Essex County Council Tourism Windsor Essex Pelee Island Business Plan Gordon Orr – Chief Executive Officer Lynnette Bain – Vice.
© CGI GROUP INC. All rights reserved ERP Success: An extraordinary opportunity Gordon Bruce, City and County of Honolulu, HI.
ERA Project Team Meeting Project Management Plan April 23, 2002.
Risk Assessments in Many Flavors George J. Dolicker, CISA, CISSP.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Software Engineering — Software Life Cycle Processes — Maintenance
ROAD ACCIDENT FUND RFB/RAF/HO/00214 DATE: 11 August 011
CallTower Implementation Process Overview
Path Operator Implementation Task Force
Building an effective business case for PPM software
Western Electricity Coordinating Council
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Texas Instruments Supplier Portal- Web Invoice Overview
2017 CG MOD 33 updates CG Planning Meeting Feb 9, 2017
Product Development Scenario Overview
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Scott Downey Director of Compliance
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Coordinate Operations Standard
NM Department of Homeland Security and Emergency Management
Presentation transcript:

Introduction Peak Hosted Advanced Applications

2 What is this project all about? Enhanced TOP situational awareness and ability to perform real-time assessments using Peak’s West-wide System Model (WSM) Provide tools to perform add-hoc studies using real-time state estimator solution as an input The full Peak RC operations, engineering, and IT teams supporting the tools Low cost, low maintenance for TOPs Project Intro

3 TOP system operators o Improved real-time situational awareness of existing pre- and post-contingency conditions o System operator ability to run studies using actual system conditions (state estimator snapshot) TOP Study or Planning Engineers o Engineer support operations with next-day or real-time studies using same model and data as Peak o Engineer can export model and studies for further analysis in PSLF, PSSE and PowerWorld Who Benefits

4 Peak RC o Additional eyes on the WSM as well as the Peak RC initiated model validation activities will result in significant improvements to the WSM and applications that use the WSM. o Data and application sharing will improve communications in real-time operations. Who Benefits (Con’t)

5 1.Avista 2.Chelan County 3.Grant County 4.Idaho Power 5.Intermountain Rural Elec. 6.NorthWestern 7.Seattle City 8.Tucson Electric 9.Tacoma 10.Douglas 11.Platte River 12.El Paso Electric Current Customers

6 PHAAUG is a committee established by the signatories of the Peak Hosted Advanced Applications Agreement. Users Group meets monthly via webinar and twice a year face-to-face. Focused on supporting the development and delivery of training. PHAAUG (Peak Hosted Advanced Applications Users Group)

7 The primary objectives are to ensure members possess the tools necessary for adequate situational awareness (pre and post-contingency) and are able to meet compliance with pending NERC standards through the use of real-time contingency analysis software. In order to accomplish these objectives, PHAAUG shall: Develop training materials. Consolidate user feedback to provide to Peak’s PHAAUG representatives. Maintain a current list of members and their maintenance fee contributions. Evaluate performance of the HAA Agreement terms. Ensure dues are sufficient to cover costs and reserves. Prepare and submit an annual budget. PHAAUG Purpose/Responsibilities

8 Peakrc.org – Discussion Board The discussion Board is available for the HAA Customers to have an open forum for questions, comments, and the option to reply to one another.

9 The Enhancement log allows for the customer to request an enhancement on the functionality of the tools. The request will be reviewed by the User Group and Peak at the following monthly meeting. Peakrc.org – Enhancement Log

Next Steps

11 Peak Service o Year 1: $30k initiation, $75k service fee o Year 2 and 3: $75k each year Alstom License o Year 1: $80k - $120k, depending on size of system o Future years: 20% of year one license WISP WAN connection is additional cost (optional) Cost

12 Execute contract with Peak If interested in STNET, execute contract with Alstom Confirm your company has a Peakrc.org site Admin - this person will provide you access once contract has been executed by both parties. To Get Started

13 Alstom Contact: o Erik Felt - o (612) Project Contacts

Tool Overview

15 Wide-area overviews Station onelines Why important? Primary input to State Estimator Five minute snapshots SCADA Situational Awareness

16 Calculates state of the system (voltage magnitude, angle, flows, injections) Identifies facility rating and bus voltage limit exceedances Five minute snapshots Real-time State Estimator Phase angle estimate with phase angle measurement (measurement in tan color).

17 Identifies the following unacceptable post- contingency system conditions: o Line/transformer facility rating exceedances o Bus voltage limit exceedances (high and low voltage) o Node-pair phase angle limit exceedances o Contingencies that result in an electrical island o Unsolved contingencies 8,000 + contingencies Five minute snapshots Real-time Contingency Analysis

18 Power Flow and Study Contingency Analysis (STNET) Used by operators for near real-time studies (what-if scenarios) Used by engineers for performing next- day studies, operations support studies Study Tools

19 Peakrc.org / Cloud Services Demonstration

Brett Wangen Director, Engineering Mandee Elenes Project Manager