Name – Meeting Title – Location, Date Transnational Access Activities in FP7 Phil Brown.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

PPPs and Affordability
Researchers nights Information Day Colette RENIER Research Executive Agency FP7-PEOPLE-2010-NIGHT INFORMATION DAY Brussels, 12 November.
National Information Seminar The management of IPA funds and the role of the Thessaloniki Liaison Office Zagreb, 21 st February 2012 Kirill Dimanopoulos.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
EUFAR - EUropean Facility for Airborne Research EUFAR/ICCAGRA meeting at ISPRS, 3-6 May 2009, Stresa, Italy Transnational Access within EUFAR and its wider.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
European Commission - Marie Curie Actions. Intra-European Fellowships for Career Development Call identifier FP7-PEOPLE-2009-IIF Closing Date: 18 August.
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
Swansea University Changes to the Pension Scheme February 2009.
Employee Certification Sam Del Toro HOAG, California.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
BIRAX Regenerative Medicine Initiative Created by the British Embassy, Israel and the British Council with the aim of strengthening academic.
Tina Murray1 Erasmus Mundus II
FP7 Regler för deltagande 18 december 2006 Monica Hjertman, Enheten för Europaprogrammen, VINNOVA
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
Research Infrastructures The Research Infrastructures in FP7.
University East Saraejvo Introduction  In accordance with the Law on Higher Education Republic of Srpska, the University of East Sarajevo organizes.
Some figures about Disabled People in Turkey Financial Rules Asist. Prof. Mahmut Geyik.
INCO GTN meeting, Paris, 21/10/2010 Activities of International Cooperation Capacities Programme INCO-LAB & INCO-HOUSE activities Philippe Froissard Deputy.
MARIE SKLODOWSKA-CURIE ACTIONS (MSCA) in Horizon 2020
RCUK fEC Update. Full Economic Costing From 1 September 2005, research grants awarded by the UK Research Councils.
SMEs "Perspectives of SME participation in FP 7“ SEE Innovation - workshop Sofia, 9th February 2006 Henrik Dam European Commission DG Research, Research.
Financial Instruments in the rural development area – delivering as they should? by Peeter LÄTTI Head of cabinet European Court of Auditors 18 June 2015.
European Community Airborne Laboratory Presentation 29/10/2008 COPAL Community heavy-payload Long Endurance Instrumented Aircraft for Tropospheric Research.
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
2 UTSA has developed a process to systematically review all fees to: 1. 1.Analyze expenditures and transfers to ensure appropriate use consistent with.
Basic principles of FP7 Grant Agreement Financial management and reporting.
Software Cost Estimation 1. APPROACHES Traditional: LOC estimation Modern: Functional Point Analysis 2.
Dragana Vasiljević Horizon 2020 Marie Skłodowska-Curie actions (MSCA) Republic of Serbia Autonomous Province of Vojvodina Provincial secretariat for science.
Software Project Management (SPM)
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Marie Curie Schemes - ToK Marie Curie Host Fellowships for the Transfer of Knowledge ToK.
EU Funding opportunities : Rights, Equality and Citizenship Programme Justice Programme Jose Ortega European Commission DG Justice.
Introduction to EUFAR EUropean Fleet for Airborne Research
November New Programme Projects of National Importance Lm25,000 Specific Programme still under development.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
111 Synthesis of Questionnaires. Thematic concentration  Most of the new member states support the suggested principle while maintaining the element.
Excerpts from Tom Jackson’s slides shown at Nov 2013 SMAP CalVal workshop with comments added by E. Kim in green TJJ–1 Green comments added by E.Kim.
EU Projects – FP7 Workshop 6: EU Funding –What’s Next? Carolina Fernandes Innovation & Funding Manager GLE Group.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
REGIONAL OPERATIONAL PROGRAMME (ROP) SLOVAK REPUBLIC DG REGIO Evaluation Network Meeting, Brussels, 14 March 2012.
Participation and dissemination Rules and Contracts FP6.
Proposals and projects in FP7 On-line Information Day Brussels/Budapest 22nd January 2007.
M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s 1 TEAP XXV/8 Task Force Report SUPPLEMENT to the Assessment of.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
EMENTHE – Developing Master’s level eLearnig Material in mental health Kick-off meeting at Tampere University of Applied Sciences 20. –
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
Maud Penella Slide 1NCP meeting - 8 April 2003 An Overview of the Human Resources and Mobility (HRM) Programme in FP6 Maud Penella European Commission.
VLBA Key Science: Making It Happen Bob Dickman AD for New Mexico Operations.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
Interreg Atlantic Area Programme Eligibility Rules.
Participation and dissemination Rules
Interreg Atlantic Area Programme Partner Budget & Eligibility Rules
Strengthening the foundations of ERA
Accelerator Research and Innovation for European Science and Society
(Additional materials)
KOSMOS Design Considerations
Human Resources and Mobility in the 6th Framework Programme (FP6)
The ERA.Net instrument Aims and benefits
MFF : Main changes between AMF and AMIF concerning legal migration and integration DG HOME – unit B1.
EPRIE Project Fund Webinar
Presentation transcript:

Name – Meeting Title – Location, Date Transnational Access Activities in FP7 Phil Brown

Transnational Access in FP7 Issues from mid-term review restricted flight time on individual projects Contributions to leading-edge science access for new instruments – certification / installation costs scientific users / groups per project: Cost-effectiveness

Transnational Access in FP7 Types of TA activity: Instrument development. Leading-edge instruments can contribute to future science impact. Campaigns need to be “large” in order to justify certification / installation costs Summer schools. External evaluation of potential value? Science projects. Bigger field projects likely to have stronger science impact. Encourage clustering with existing projects. Need to avoid double-funding with EU money.

Instrument development work Analogy to NCAR/NSF IDEAS Can we make call for cluster of instrument proposals to take place in medium term of project? Need time to acquire the additional certification / installation funding from alternative sources Can we pre-allocate an additional slice of hours to one or more aircraft above the initial level allocation? Would enable specific instrument development call to have max impact

Clustering with existing projects Successful examples of this in FP6 OFFGREEN added 10 additional flight hours to GFDEX project already funded on the FAAM BAe by UK academic funding (NERC). EUFAR user groups have effective access to significantly larger project to enhance science Transit flying costs can be covered by the existing project Can the existing project accommodate additional flying hours into its schedule? Original proposal has probably already requested a realistic amount of flight time from its national funding body and a realistic amount of time in which to accommodate it.

Promotion of TA Improved impact in terms of proposals from countries without existing facilities (52%) but possibilities for further increase Uneven take-up of different aircraft categories Specific promotions for categories that were under-utilized in FP6? Promotion of activities that involve joint use of different aircraft categories COPS (summer 2007) involved a whole fleet of aircraft doing different types of measurements directed to common aims

TA workflow and project review FP7 will start with largely the same process as FP6 finishes with Any further changes need to be rapidly identified and introduced Have introduced a number of improvements over the course of FP6 Science peer review probably remains the most problematic stage – indeterminate duration

Transnational Access in FP7 Management of TA funding surplus We have introduced a scheme (at 3 rd Man.Mtg) to redistribute funds from aircraft with low take-up to others with higher demand This has already operated successfully to enable some TA projects to proceed on aircraft that had used their initial allocation Has potential impacts on the total number of projects and user groups that might be serviced – contract issue. Scheme for managing this impact by restricting flows of re-allocated funding

Changes to TA funding rules under FP7 Still restricted to simple User Fee (cost per flight hour) No option to add separate fees for instrument certification / installation Restriction to 20% of total activity (including TA activities) Unlikely to cause problems if calculated over 4yr term with TA access at similar levels to FP6 Reimbursement according to actual audited costs at the end But limited to the maximum amount specified in the contract – based on initial estimated costs