Status of the Transfer of CRYRING to FAIR MSL, 2 February 2009 Håkan Danared.

Slides:



Advertisements
Similar presentations
Finding an Internship Career Services, BA 156 Southwest Minnesota State University Southwestmsu.edu/CampusLife/careerservices.
Advertisements

The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
The Months and The Seasons Prepared by Claudia Doria and Terra Myers.
Kansas State Board of Education Brad Neuenswander & Tom Foster Kansas State Department of Education March, 2013.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
HESR 2 Electron Cooling Björn Gålnander The Svedberg Laboratory Uppsala University Midterm Review, DIRACsecondary-Beams December 8, 2006 GSI, Darmstadt.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
SunSatFriThursWedTuesMon January
Policy on the Management of Intellectual Property in Technology Transfer Activities at CERN CERN/FC/5434/RA Technology Transfer Network Meeting – 10 th.
Lab. Director’s Meeting IHEP, Protvino, Russia, January 2008 D. Reistad, The Svedberg Laboratory, Uppsala University.
Status of ATF Fast Kicker Experiment
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
CIMBA Italy Study Abroad Programs
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ELENA installation progress F. Butin / ELENA collaboration.
Status of the FAIR Project
CR Dipole Magnets Power converter concept
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
ESR Slow highly charged ions and antiprotons
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
M.J. Barnes : Canadian Involvement with LHC
ELENA installation and commissioning status
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
The ELENA Safety Documentation «time to prepare the safety clearance»
Installations, modifications, consolidation in 2005:
Target and Horn status report
Junji Urakawa (KEK) for ATF International Collaboration
Strip-line Kicker R&D at KEK-ATF
LARP Phase II Secondary Rotatable Collimator
Patrick ALEXANDRE, 27, from France.
MEIC Cost Estimate Overview
Status of the PANDA Solenoid Magnet Production in BINP
Technical challenges for forming the double intensity section of JLEIC ion beam Jiquan Guo.
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Status of the Transfer of CRYRING to FAIR MSL, 2 February 2009 Håkan Danared

March 2008: Letter from FLAIR collaboration to FAIR and Swedish Research Council that FLAIR accepts CRYRING as the LSR. June 2008: Discussion between MSL and the Swedish Research Council, where it is agreed that MSL will obtain 30 MSEK to cover the costs of keeping the ring at MSL though 2010, make the necessary modifications, and transfer it to FAIR. February 2009: No contract yet between MSL and Swedish Research Council, mainly because of unclear rules about how FAIR is to accept in-kind contributions to experiments (my interpretation). Nevertheless MSL has started to spend the money. Developments during Non-Technical Developments during Non-Technical

Start of writing of Technical Design Report. Contains documentation of existing hardware, design of new systems,... Developments during Technical Developments during Technical CAD engineer hired to transfer CRYRING drawings on paper and in 2d Autocad to 3d CAD (Solid Edge). Septum magnet and supply (Földi 2 kA, 28 V) given to the project from TSL. Dag Reistad (retired from TSL) hired to prepare acquisition of kicker magnets with supplies. Contacts with Imtech-Vonk for transfer of magnet power converters to FAIR, will visit Angela and GSI on Thursday to discuss technical details.

Zero:th order specifications for LSR Current:2.8 kA Voltage:22 kV Rise/fall time:200 ns Stability:1 % Max pulse length:? Kicker Magnets GSI specifications For single-turn extraction, field strength 0.10 T, fall time (injection)/rise time (extraction) less than particle revolution time. Dag Reistad visited CERN GSI Puls-Plasma-Technik Danfysik coming to MSL next week Contacts with Friatec, ScandiNova,...

Timeline Technical Design Report: Ready summer 2009 (optimistically) Design of injection and extraction: Until April 2009 Manufacturing (in-house, commercial): Until December 2009 Installations and tests: Spring 2010 Disassembly and transfer: Completed by 31 December 2010 Minor work possible after 2010, such as preparation of new ion- source platform