General Overview of the Korean Domestic Agency Procurement Activities K. J. Jung ITER Korea (KODA) National Fusion Research Institute.

Slides:



Advertisements
Similar presentations
ITER Organization, Cadarache, France
Advertisements

Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.
Page 1 SUISS ILOS – 20/06/2012 The ITER Project Overall Procurement Strategy and Business Opportunities ITER Organization Françoise Flament Head of Procurement.
Office of Central Integration and Engineering
Stuart East, 22 nd May 2012 Delivering industrial solutions for the fusion research community Stuart East.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Assembly and Installation Information Day – 21 st May 2015 © 2015, ITER Organization Page 1IDM UID: XXXXXX Keynotes on Assembly and Installation of ITER.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
RF Cavity / Coupling Coil Module
ITER International Team 16th ANS Topical Meeting on Fusion Technology
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Kaschuck Yu.A., Krasilnikov A.V., Prosvirin D.V., Tsutskikh A.Yu. SRC RF TRINITI, Troitsk, Russia Status of the divertor neutron flux monitor design and.
Norbert Holtkamp, October Status of the ITER Project Norbert Holtkamp Status of the ITER Project Norbert Holtkamp Principal Deputy Director General.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
ISFNT-11, Barcelona, Spain, September 16-20, 2013 © 2013, ITER Organization Slide 1 De sign, Fabrication and Testing of the ITER First Wall and Shielding.
General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
1 Overall status of the procurement activities for the items transferred from F4E to JAEA F4E-JAEA Bi-lateral Meeting #12 St. Paul-lez-Durance 15 June.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
17 th ADAS Workshop, Cadarache, France 2012 Page 1 Progress in ITER Diagnostics Michael Walsh and the ITER Diagnostics Team (IO Diagnostics, all DAs and.
Charles C. Baker Virtual Laboratory for Technology presented at the U.S. ITER Forum University of Maryland, College Park May 8, 2003 US ITER Technology.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
ITER-China Project Huo YuPing PT Leader, ITER-China Chief scientist.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
24 th IAEA Fusion Energy Conference, San Diego, 8-13 October 2012 Slide 1/23 24 th IAEA Fusion Energy Conference San Diego, USA, 8-13 October th.
In-Kind Contributions Workshop – IKCW ITER Status of In-Kind Procurement Helium (3,5 MeV) Neutron (14,1 MeV) Deuterium Tritium Ken Blackler Construction.
O. Kester, NuSTAR annual meeting, 27/02/2013
Current Status of Chinese Solid Tritium Breeder TBM Presentation at the 25th IAEA Fusion Energy Conference - IAEA CN-221. Oct , 2014, Russian Federation,
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
ELENA installation progress F. Butin / ELENA collaboration.
US Participation in the
Status of I&C System Development for ITER Diagnostic Systems in Japan
CSP 25th November 2010 Technical agreement number 3: overview
Overview of Fusion Blanket R&D In Japan
2K CB FDR Overview:  Agenda, Charge, Review Process
Office of Central Integration and Engineering
ITER & Expectations for Fusion Research in the Next Quarter Century
Status of the PANDA Solenoid Magnet Production in BINP
Office of Central Integration and Engineering
Office of Central Integration and Engineering
Saturday Morning Session, CBBI-16
VLT Meeting, Washington DC, August 25, 2005
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Status of the PANDA Solenoid Magnet Production in BINP
Fusion for Energy & ITER Contribution to EU Added Value
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Daresbury ESS In-Kind Contributions
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

General Overview of the Korean Domestic Agency Procurement Activities K. J. Jung ITER Korea (KODA) National Fusion Research Institute

IBF/ March 2015, Palais du Pharo, Marseille, France 2 II ITER Korea Project I Procurement Activities in KODA

IBF/ March 2015, Palais du Pharo, Marseille, France 3 ITER Korea Project I

IBF/ March 2015, Palais du Pharo, Marseille, France 4 Role of ITER Korea (Korean Domestic Agency) The “ITER Korea (KO-DA)” at National Fusion Research Institute (NFRI) is performing all activities with respect to the ITER Korea Project with full responsibilities as the Domestic Agency of the Republic of Korea.  Management of KO procurement activities  Delivery of the KO procurement packages  Selection and dispatch KO experts to IO  Collaboration and coordination activities with IO and other DAs Main Roles :

IBF/ March 2015, Palais du Pharo, Marseille, France 5 Organizational Structure of KODA ITER Organization (IO) Quality Management Department Tokamak Engineering Department Project Planning & Management Department Deputy Director General Systems Engineering Department ITER Council Management Advisor GOVERNMENT (MSIP) ITER Korea Director General NFRI

IBF/ March 2015, Palais du Pharo, Marseille, France 6 KO In-kind Contribution to ITER Project kIUA Total (kIUA) : KO : 49.82% : TF Conductor Total kIUA : KO : 20.18% : (Complete)

IBF/ March 2015, Palais du Pharo, Marseille, France 7 PackageSigned DatekIUA Value 1.1.P6A.KO.01 TF Conductors’ kIUA 1.5.P1A.KO.01 VV Main Vessel’ kIUA 1.5.P2A.KO.01 VV E/L Ports’ kIUA 2.2.P2A.KO.01 Assembly Tooling’ kIUA 2.7.P1.KO.01 Thermal Shield’ kIUA 4.1.P2.KO.01 AC/DC Converters’ kIUA 5.5.P1.KO.01 Diagnostics’ kIUA 1.6.P1B.KO.01 Blanket Shield Blocks’ kIUA Total kIUA  Total PA TotalSigned PATotal Value (a)Signed Value (b)b / a kIUA kIUA93.9 %  Signed PA KO PA Status

IBF/ March 2015, Palais du Pharo, Marseille, France 8 KODA Contract Awards Procurement Package Item Contract Date Contractor TF Conductor (Complete) Strand 93 ton ’ KAT Cabling & Material ’ NEXANS Jacket Section ’ POSCOSS Jacketing ’ ICAS (Italy) Vacuum Vessel Main Vessel Sector 6, Sector 1 ’ HHI VV Equatorial & Lower Ports Equatorial Port & Lower Port ’ HHI NB Port IWS ’ HHI VV Gravity Supports ’ WONIL Blanket Shield Block Manufacturing of 1 st Package of Blanket Shield Block ’ WONIL Assembly Tooling Design, Manufacture of the tools for Sector Sub-Assembly ’ SFA Manufacturing of ITER Sector Sub-Assembly Tools ’ WONIL Manufacturing of ITER Sector Assembly Tools ’ SFA Thermal Shield Manufacturing of ITER Thermal Shields ’ SFA AC/DC Converters ’ Dawon sys. & Hyosung

IBF/ March 2015, Palais du Pharo, Marseille, France 9 II Procurement Activities in KODA

IBF/ March 2015, Palais du Pharo, Marseille, France 10 TF Conductors  KO TF conductors (20.18 %) consist of 19 rDPs (760 m) and 8 sDPs (415 m). -Production of strands and cablings was completed in 2013 and in May 2014, respectively. -Jacketing was completed at ICAS ( Italy) in November All 27 TF conductors were delivered to JADA by the end of Nov. 2014, on schedule.  This is the first successful procurement item from KO. Shipping of Conductor to Japan

IBF/ March 2015, Palais du Pharo, Marseille, France 11 Vacuum Vessel (Main Vessel) Manufacturing of Sector #6 (First Sector) is on-going at HHI. Welding of Keys on Upper Segment (PS2) Upper Port Stub R&D for IVC Rail Support  21% of Vacuum Vessel Main Body (Lead Item). * 2 VV sectors including the first delivery item from KODA * Other 7 sectors to be procured by EUDA

IBF/ March 2015, Palais du Pharo, Marseille, France 12 VV Equatorial and Lower Ports  73% of VV ports (Lead Item). * 14 Sets of Equatorial and 9 Sets of Lower Ports * 3 Sets of NB Ports and 9 Sets of VV Supports Manufacturing of Lowe Port Stub Extension is on-going at HHI. Welded Inner Shells Inner shell welding Machining of Port Components LPSE Mock-up

IBF/ March 2015, Palais du Pharo, Marseille, France 13 Thermal Shields  Milestones - Final design review (Nov 2011), - Contract award (Feb 2013). - Manufacturing kick-off meeting (4 July 2014)  100% of the t hermal shields from Korea  Status - Material procurement is completed. - Manufacturing of VVTS is on-going. (buffing, cutting, bending, etc.)  Manufacturing of Prototype is completed. Water-jet cuttingAssembly Completion  Manufacturing of VVTS is started.

IBF/ March 2015, Palais du Pharo, Marseille, France 14 Blanket Shield Blocks -Final design activities including hydraulic, thermal and structural analyses are in progress through BIPT. -Fabrication and testing of full scale prototype of SB08 for pre-qualification was successfully completed. -Procurement Arrangement was signed in November Contract award for 1 st Package (36 modules) has been completed, and process qualification is on going.  49.82% of Blanket shield blocks  Status

IBF/ March 2015, Palais du Pharo, Marseille, France 15 Assembly Tools  Status - PDR for the 1 st delivery tools was completed in July During 2011~12, 1/5 mock-ups for sector sub-assembly tools were fabricated to verify the design. - FDR of 1 st delivery tools were performed in December Manufacturing for 1 st delivery tools is being prepared.  100% of Assembly tools (More than 120 assembly tools) Mock-up Test for the Verification of Tool Design Sub-assembly ToolCentral Column PF6 Align Unit IOIS ToolUPSE Tool

IBF/ March 2015, Palais du Pharo, Marseille, France 16 AC/DC Converters  ITER AC/DC converters (TF, CS, VS, CC) and MCS  Status □ PA Scope: Design, Fabrication, FAT, Installation, SAT, Technical Support of ITER AC/DC Converters and Master Control System □ Credit: kIUA (37%) □ 2010: CDR (June 2010) □ 2011: PA Signature (Mar. 2011), Contract Award (Aug. 2011) □ 2012: PDR (July 2012) □ 2013: FDR-1 Approved (Sept. 2013): CC, VS converters □ 2014: FDR-2 Approved (May 2014): CS, TF converters, MCS □ 2015: Fabrication and FAT: CC, VS, converters  Plan □ 2016: Fabrication and FAT: CS, TF converters, MCS □ : Installation □ 2019: SAT, Technical Support

IBF/ March 2015, Palais du Pharo, Marseille, France 17 Tritium Storage & Delivery System (SDS)  81 % of ITER tritium SDS in the Tritium Plant □ R&D Works - SDS getter bed 1:1 mock-up test - SDS unit process feasibility verification test - Tritium inventory calorimetry, He-3 recovery - Fuel cycle modeling □ Major Institutes for R&D - NFRI, KAERI, KHNP CRI, Wolsung TRF □ Key Technology to be developed by KODA - Tritium storage bed design & fabrication - Tritium inventory accountability - Process design and operation DU SDS Process Verification Experiment Concept for He-3 Collection ITER Tritium Plant SDS in B1 Level with Four Fire Sectors DU Bed Development

IBF/ March 2015, Palais du Pharo, Marseille, France 18 Diagnostics □ Preliminary Design and R&D Work - - Upper Port #18 Integration Common manufacturing of upper port generic structure Port integration design of VUV, NAS, Upper VNC in UP#18 - VUV Spectrometer Development Preliminary design of VUV-Edge, VUV-Core, and VUV-Div Proto-type system performance test at KSTAR - - Neutron Activation System Development Preliminary design of NAS Proto-type system performance test at KSTAR Core Survey Divertor Plasma Edge Imaging UPP18 VUV NAS □ Procurement Package - Neutron Activation System (NAS) - VUV Core Survey Spectrometer (VUV-Core) - Divertor VUV Spectrometer (VUV-Divertor) - VUV Edge Imaging Spectrometer (VUV-Edge) - Upper Port Plug #18 & Integration (UPP18)  3.13 % of ITER diagnostics

IBF/ March 2015, Palais du Pharo, Marseille, France 19 Test Blanket Modules To verify the capability of tritium breeding, heat removal and shielding for the Fusion Breeding Blanket. To test the suitability of breeding blanket technology for DEMO in ITER machine Port No.TBM Concept 16 (PM: EU)HCLL (TL: EU)HCPB (TL: EU) 18 (PM: JA)WCCB (TL: JA)HCCR (TL: KO) 2 (PM: CN)HCCB (TL: CN)LLCB (TL: IN) WCCB: Water-cooled Ceramic Breeder (+Beryllium) HCCR: He-cooled Ceramic Reflector (+Beryllium, Graphite) * PM: Port Master, TL: TBM Leader Port Cell #18 Port Cell #2 Port Cell #16  TBM Port Sharing (6 TBM Concepts) □ Status HCCR-TBS TBMA was signed on May 23, HCCR-TBS PrSR was approved by IO on May 16, Combined CDRs for KO HCCR-TBS and JA WCCB-TBS was done on Feb. 2-6, TBS Arrangement was signed in April 2015.

IBF/ March 2015, Palais du Pharo, Marseille, France 20 Announcement of next ISFNT-12

IBF/ March 2015, Palais du Pharo, Marseille, France 21 Home Page : Announcement of next ISFNT-12

IBF/ March 2015, Palais du Pharo, Marseille, France 22 National Fusion Research Institute