ELI begins construction - the next phase of implementation Vlastimil Růžička, ELI Beamlines Managing Director Prague, May 24, 2013
Establishment of ELI-DC (April 2013) Contract for building general contractor signed (May 2013) Contract for delivery of PW class laser close to being concluded (probably June 2013) Recent progress in ELI Beamlines
Establishment of ELI-DC Signature of notarial deed, Brussels, April 11, 2013 Fourth from the left: Robert-Jan Smits, Director-General of DG Research and Innovation Institute of Physics joins the Association after it being established legally by royal decree (expected May/June 2013)
Construction pit May-17, 2013 (phase 1, site preparation, contractor: Strabag) Size: 120 x 60 m Depth: 9 m General contract signed General contractor: consortium Metrostav, OHL ŽS, VCES Laser hall (3 stories bldg., 1 underground), admin.bldg., multifunctional bldg. To be finished May 2015, total cost 1,4 bil. CZK (VAT excl.)
Cutting edge 2-PW class 10 Hz repetition rate laser Based on DPSSL technology World leading parameters in output power and repetition rate „Workhorse“ of the ELI Beamlines facility Supplier: Lawrence Livermore National Laboratory, California, USA Participation of Czech scientists in the development team Contract to be signed June 2013 Procurement of PW class laser